Data Element list used by SAP ABAP Table CFB_S_CAUFV_AFPO_MKAL (CFB Structure for Overview Form of Process Orders)
SAP ABAP Table
CFB_S_CAUFV_AFPO_MKAL (CFB Structure for Overview Form of Process Orders) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | /CUM/AUEST | CU: Automatic Copy of Estimated Costs | ||
| 2 | /CUM/CMNUM | CU: Construction Measure Number | ||
| 3 | /CUM/DESGUID | CU: GUID of Design Document | ||
| 4 | /CUM/DESNUM | CU: Design Number | ||
| 5 | /CUM/INDCU | CU: Order is Used for Compatible Units | ||
| 6 | /CUM/INTCUNR | CU: Internal CU Number in a Work Order | ||
| 7 | ABGR_SCHL | Results Analysis Key | ||
| 8 | ABLAD | Unloading Point | ||
| 9 | ADATM | Valid-from date of production version | ||
| 10 | AD_ADDRNUM | Address number | ||
| 11 | AEKNZ | Change indicator | ||
| 12 | AEKNZ | Change indicator | ||
| 13 | AEKNZ | Change indicator | ||
| 14 | AEKNZ | Change indicator | ||
| 15 | AEKNZ | Change indicator | ||
| 16 | AEKNZ | Change indicator | ||
| 17 | AEKNZ | Change indicator | ||
| 18 | AEKNZ | Change indicator | ||
| 19 | AENNR | Change Number | ||
| 20 | AENNR | Change Number | ||
| 21 | AENNR | Change Number | ||
| 22 | AFAKT | Execution Factor | ||
| 23 | ALORT | Receiving storage location for repetitive manufacturing | ||
| 24 | AM_UMWKZ | Reason for environmental investment | ||
| 25 | ANZSN | Number of serial numbers | ||
| 26 | ARSNR | Settlement reservation number | ||
| 27 | ARSPS | Item number of the settlement reservation | ||
| 28 | ATRKZ | Request ID | ||
| 29 | AUDISP_PLUS | Reservation Relevance/Generation of Purchase Requisition | ||
| 30 | AUFABKRS | Processing group | ||
| 31 | AUFAEDAT | Change date for Order Master | ||
| 32 | AUFAENAM | Last changed by | ||
| 33 | AUFART | Order Type | ||
| 34 | AUFART | Order Type | ||
| 35 | AUFERFDAT | Created on | ||
| 36 | AUFERFNAM | Entered by | ||
| 37 | AUFIDAT2 | Technical completion date | ||
| 38 | AUFKALSM | Costing Sheet | ||
| 39 | AUFKOSTV | Responsible cost center | ||
| 40 | AUFKSTAR | Settlement cost element | ||
| 41 | AUFLOEKZ | Deletion flag | ||
| 42 | AUFLOEKZ | Deletion flag | ||
| 43 | AUFLTEXT | Long Text Exists | ||
| 44 | AUFNR | Order Number | ||
| 45 | AUFREFNR | Reference order number | ||
| 46 | AUFSOWRK | Location plant | ||
| 47 | AUFSTKZ | Identifier for statistical order | ||
| 48 | AUFTEXT | Description | ||
| 49 | AUFTYP | Order category | ||
| 50 | AUFTYP | Order category | ||
| 51 | AUFUSER4 | Estimated total costs of order | ||
| 52 | AUFWAERS | Order Currency | ||
| 53 | AUFZSCHL | Overhead key | ||
| 54 | AUKBED | Indicator: Calculate capacity requirements | ||
| 55 | AVMNG | Fixed quantity of scrap from production | ||
| 56 | AVOUEB | Indicator: Display operation overview | ||
| 57 | AWSLS | Variance Key | ||
| 58 | BASMN | Base quantity | ||
| 59 | BASMN | Base quantity | ||
| 60 | BASMN | Base quantity | ||
| 61 | BDATM | Run-time end: production version | ||
| 62 | BEDID | ID of the capacity requirements record | ||
| 63 | BEDID | ID of the capacity requirements record | ||
| 64 | BEDID | ID of the capacity requirements record | ||
| 65 | BEMOT | Accounting Indicator | ||
| 66 | BERID | MRP Area | ||
| 67 | BESKZ | Procurement Type | ||
| 68 | BESKZ | Procurement Type | ||
| 69 | BREAKS | Indicator: Scheduling allowing for breaks | ||
| 70 | BUKRS | Company Code | ||
| 71 | BWTAR_D | Valuation type | ||
| 72 | BWTTY_D | Valuation Category | ||
| 73 | CCKEY | Cost collector key | ||
| 74 | CCKEY | Cost collector key | ||
| 75 | CCOBJID | Object ID | ||
| 76 | CC_CONF_KEY | Identical object | ||
| 77 | CFB_ADTDAYS | Additional Days | ||
| 78 | CFB_BBD_PPPI | Best-Before Date (BBD)/ Shelf Life Expiration Date (SLED) | ||
| 79 | CFB_DATOFM | Date of Manufacture | ||
| 80 | CHARG_D | Batch Number | ||
| 81 | CIM_COUNT | Internal counter | ||
| 82 | CIM_COUNT | Internal counter | ||
| 83 | CIM_COUNT | Internal counter | ||
| 84 | CKML_F_PROCNR | Production Process | ||
| 85 | CKML_PROZESS_TYP | Process Category (Procurement/Consumption) | ||
| 86 | CK_EWAHR | Usage Probability with Version Control | ||
| 87 | CK_FIXPRKU | Fixed-Price Co-Product | ||
| 88 | CK_KALNR | Cost Estimate Number for Cost Est. w/o Qty Structure | ||
| 89 | CK_LOSGR | Costing lot size | ||
| 90 | CK_LOSGR | Costing lot size | ||
| 91 | CN_COSTUPD | Costs are updated | ||
| 92 | COMP_CALC | Indicator: Components will not be costed | ||
| 93 | CO_ABARB | Confirmation: Degree of processing | ||
| 94 | CO_APLZL | General counter for order | ||
| 95 | CO_APRIO | Order priority | ||
| 96 | CO_APROZ | Scrap percentage | ||
| 97 | CO_APROZ | Scrap percentage | ||
| 98 | CO_ASTEX | User status active | ||
| 99 | CO_ASTTX | Field displaying user status | ||
| 100 | CO_AUCOST | Indicator: Cost automatically | ||
| 101 | CO_AUFLD | Date of BOM Explosion/Routing Transfer | ||
| 102 | CO_AUFME | Unit of measure for in-house production | ||
| 103 | CO_AUFPL | Routing number of operations in the order | ||
| 104 | CO_AUFPL | Routing number of operations in the order | ||
| 105 | CO_AUFPL | Routing number of operations in the order | ||
| 106 | CO_AUTERM | Indicator: Schedule automatically | ||
| 107 | CO_CHG_TIME | Changed at | ||
| 108 | CO_COLORDPRC | Collective order with/without automatic goods movement | ||
| 109 | CO_DISPO | MRP controller for the order | ||
| 110 | CO_DNREL | Indicator: Order item not relevant for MRP | ||
| 111 | CO_ETRMP | Opening date of the planned order | ||
| 112 | CO_FLGMD | FAUF: Reading of master data executed | ||
| 113 | CO_FREI | Indicator: Order released/partially released (for MRP) | ||
| 114 | CO_FREIKZ | Indicator: Release order immediately | ||
| 115 | CO_FTRMI | Actual release date | ||
| 116 | CO_FTRMP | Planned release date | ||
| 117 | CO_FTRMS | Scheduled release date | ||
| 118 | CO_FTRPS | Scheduled release date (forecast) | ||
| 119 | CO_GETRI | Confirmed Order Finish Date | ||
| 120 | CO_GEUZI | Confirmed order finish (time) | ||
| 121 | CO_GIAMG | Expected variance from planned qty to be delivered to stock | ||
| 122 | CO_GLTPP | Finish date (forecast) | ||
| 123 | CO_GLTPS | Scheduled forecast finish | ||
| 124 | CO_GLTRI | Actual finish date | ||
| 125 | CO_GLTRP | Basic finish date | ||
| 126 | CO_GLTRP | Basic finish date | ||
| 127 | CO_GLTRS | Scheduled finish | ||
| 128 | CO_GLTRS | Scheduled finish | ||
| 129 | CO_GLUPP | Forecast finish (time) | ||
| 130 | CO_GLUPS | Scheduled forecast finish time | ||
| 131 | CO_GLUZP | Basic finish (time) | ||
| 132 | CO_GLUZS | Scheduled finish time | ||
| 133 | CO_GMEIN | Common unit of measure for all order items | ||
| 134 | CO_GSBTR | Overall commitment date | ||
| 135 | CO_GSTPP | Forecast start date | ||
| 136 | CO_GSTPS | Scheduled forecast start | ||
| 137 | CO_GSTRI | Actual start date | ||
| 138 | CO_GSTRP | Basic start date | ||
| 139 | CO_GSTRS | Scheduled start | ||
| 140 | CO_GSUPP | Forecast start (time) | ||
| 141 | CO_GSUPS | Scheduled start time (Forecast) | ||
| 142 | CO_GSUZI | Actual start time | ||
| 143 | CO_GSUZP | Basic start time | ||
| 144 | CO_GSUZS | Scheduled Start (Time) | ||
| 145 | CO_GWEMG | Delivered quantity | ||
| 146 | CO_IAMNG | Expected surplus/deficit for goods receipt | ||
| 147 | CO_IASMG | Scrap confirmed for order | ||
| 148 | CO_IGMNG | Yield confirmed from order confirmation | ||
| 149 | CO_KDAUF | Sales order number | ||
| 150 | CO_KDAUF | Sales order number | ||
| 151 | CO_KDPOS | Sales order item | ||
| 152 | CO_KDPOS | Sales order item | ||
| 153 | CO_KONSI | Selection: Consignment stock | ||
| 154 | CO_KONTI | Account assignment | ||
| 155 | CO_KORRK | Order conversion with the possibility of making corrections | ||
| 156 | CO_KSTEMPF | Indicator: Direct cost collector | ||
| 157 | CO_LAUFNR | Leading order in current processing | ||
| 158 | CO_LEIHG | Selection: Returnable packaging | ||
| 159 | CO_LKNOT | Left node in collective order | ||
| 160 | CO_LTEXT | Long text exists | ||
| 161 | CO_LTRMI | Actual delivery/finish date | ||
| 162 | CO_LTRMP | Delivery date from planned order | ||
| 163 | CO_MATNR | Material Number for Order | ||
| 164 | CO_MATNR | Material Number for Order | ||
| 165 | CO_MATXT | Material description | ||
| 166 | CO_MBAUGR | Superior assembly | ||
| 167 | CO_MES_INT_ROUTINGID | Key of a Routing from an ME System | ||
| 168 | CO_MES_MAX_GAMNG | Maximum Value of Total Order Quantity After Distribution | ||
| 169 | CO_MIMEZ | Expected yield variance | ||
| 170 | CO_MLTPS | Order with multiple items | ||
| 171 | CO_NAUCOST | Indicator: Do not cost automatically | ||
| 172 | CO_NAUTERM | Indicator: Do not schedule automatically | ||
| 173 | CO_NDISR | Ind.: Material in order item is not relevant for MRP | ||
| 174 | CO_NOPCOST | Do not calculate planned costs for order | ||
| 175 | CO_PENDD | Outline finish of collective order (date) | ||
| 176 | CO_PENDT | Outline finish time | ||
| 177 | CO_PLAFKZ | Indicator: Convert planned order with RSNUM | ||
| 178 | CO_PLAUF | Date for routing transfer | ||
| 179 | CO_POSNR | Order item number | ||
| 180 | CO_POSNR | Order item number | ||
| 181 | CO_PRMBD | Check with requirements | ||
| 182 | CO_PRODNET | Indicator: Order is part of collective order | ||
| 183 | CO_PRODPRF | Production Scheduling Profile | ||
| 184 | CO_PSAMG | Scrap quantity in item | ||
| 185 | CO_PSMNG | Order item quantity | ||
| 186 | CO_PSTARTD | Outline start of collective network (date) | ||
| 187 | CO_PSTARTT | Start time of a collective order | ||
| 188 | CO_PWERK | Planning plant for the order | ||
| 189 | CO_RKNOT | Right node of a collective order | ||
| 190 | CO_RUECK | Completion confirmation number for the operation | ||
| 191 | CO_SDATB | To selection date | ||
| 192 | CO_SDATV | From selection date | ||
| 193 | CO_STRMP | Start date of the planned order | ||
| 194 | CO_STTXT | System Status | ||
| 195 | CO_TEILNET | Number of superior network | ||
| 196 | CO_TM_FREI | Indicator: Order is (partially) released | ||
| 197 | CO_TM_TABG | Indicator: Order is technically completed | ||
| 198 | CO_UMSKZ | Indicator: Collective conversion of planned orders | ||
| 199 | CO_UPTER | Indicator: Change to Scheduled Dates | ||
| 200 | CO_VFMNG | Committed quantity for order acc. to ATP check components | ||
| 201 | CO_WEAE | Indicator: Goods receipt indicator can be changed | ||
| 202 | CO_WEMNG | Quantity of goods received for the order item | ||
| 203 | CREA_APL | Application code, where the order/network was created | ||
| 204 | CR_KTEXT | Short description | ||
| 205 | CR_OBJID | Object ID of the resource | ||
| 206 | CR_OBJID | Object ID of the resource | ||
| 207 | CR_OBJTY | Object types of the CIM resource | ||
| 208 | CR_OBJTY | Object types of the CIM resource | ||
| 209 | CSPLIT | Apportionment structure | ||
| 210 | CSPLIT | Apportionment structure | ||
| 211 | CUOBJ | Configuration (internal object number) | ||
| 212 | CUOBJ | Configuration (internal object number) | ||
| 213 | CUOBJ | Configuration (internal object number) | ||
| 214 | CY_SEQNR | Seq. number order | ||
| 215 | C_TIME | Time created | ||
| 216 | DATUV | Valid-From Date | ||
| 217 | DATUV | Valid-From Date | ||
| 218 | DZKRIZ | Counter for additional criteria | ||
| 219 | ELIKZ | "Delivery Completed" Indicator | ||
| 220 | FEVOR | Production Supervisor | ||
| 221 | FHORI | Scheduling Margin Key for Floats | ||
| 222 | FKBER | Functional Area | ||
| 223 | FLAG | General Flag | ||
| 224 | FLAG | General Flag | ||
| 225 | FLGSER | Serial Number with Incomplete Equipment | ||
| 226 | FLG_ADDR | Ind: Address update must be called up | ||
| 227 | FLG_AOB | Indicator: relationships | ||
| 228 | FLG_ARBEI | Indicator: Default value work is relevant | ||
| 229 | FLG_CALC | Indicator: Order (network etc.) still to be calculated | ||
| 230 | FLG_DIRECT | Indicator: Direct function call | ||
| 231 | FLG_LFINF | Ind.: Book delivery information | ||
| 232 | FLG_LVS | Indicator: WM relevant change made | ||
| 233 | FLG_PARENT | Indicator: Order has dependent orders | ||
| 234 | FLG_PRINT | Indicator: Order still to be printed (internal field) | ||
| 235 | FLG_RUCK | Ind: Confirmation to be saved | ||
| 236 | FLG_SERV | Ind: Services must be updated | ||
| 237 | FLG_TERDIA | Indicator: Refill dialog table for scheduling | ||
| 238 | FLG_TERM | Indicator: Scheduling must take data changes into account | ||
| 239 | FLG_TRME | Indicator: Scheduling is carried out at least once | ||
| 240 | FLG_TRMV | Indicator: Operation changes relevant to scheduling | ||
| 241 | FREIZ | Release period (in days) | ||
| 242 | GAMNG | Total order quantity | ||
| 243 | GASMG | Total scrap quantity in the order | ||
| 244 | GSBER | Business Area | ||
| 245 | GSBER | Business Area | ||
| 246 | GSMNG | Total planned order quantity | ||
| 247 | HISTU | Level (in Multi-Level BOM Explosions) | ||
| 248 | IM_ABUKRS | Requesting company code | ||
| 249 | IM_PROFIL | Investment measure profile | ||
| 250 | IM_SIZECL | Scale of investment objects | ||
| 251 | INSMK | Stock Type | ||
| 252 | IWERK | Maintenance Planning Plant | ||
| 253 | IZWEK | Reason for investment | ||
| 254 | JV_ETYPE | Equity type | ||
| 255 | JV_JIBCL | JIB/JIBE Class | ||
| 256 | JV_JIBSA | JIB/JIBE Subclass A | ||
| 257 | JV_NAME | Joint venture | ||
| 258 | JV_OR_CO | JV original cost object | ||
| 259 | JV_OTYPE | Joint Venture Object Type | ||
| 260 | JV_RECIND | Recovery Indicator | ||
| 261 | J_OBJNR | Object number | ||
| 262 | J_OBJNR | Object number | ||
| 263 | J_STSMA | Status Profile | ||
| 264 | KALKVARIST | Costing variant for actual costs | ||
| 265 | KALKVARPLN | Costing variant for planned costs | ||
| 266 | KALSMA_CH | Search procedure for batch determination | ||
| 267 | KALSN | Calendar Selection for Order | ||
| 268 | KAPPL | Application | ||
| 269 | KAPVERSA | Version of Available Capacity | ||
| 270 | KBED_D | Ind: do not create capacity requirements | ||
| 271 | KBNKZ | Kanban Indicator | ||
| 272 | KDAUF | Sales Order Number | ||
| 273 | KDEIN | Delivery schedule for sales order | ||
| 274 | KDPOS | Item number in Sales Order | ||
| 275 | KNTTP | Account assignment category | ||
| 276 | KOKRS | Controlling Area | ||
| 277 | KSBIS | Cost collector valid to | ||
| 278 | KSVON | Cost collector valid from | ||
| 279 | KVEWE | Usage of the Condition Table | ||
| 280 | KZAVC | Indicator for type of availability check | ||
| 281 | KZAVC | Indicator for type of availability check | ||
| 282 | KZBWS | Valuation of Special Stock | ||
| 283 | KZVBR | Consumption posting | ||
| 284 | K_SALDO | Order balance in controlling-area currency | ||
| 285 | LAGME | Base Unit of Measure | ||
| 286 | LD_LINE | Line hierarchy | ||
| 287 | LGORT_D | Storage location | ||
| 288 | LOSBS | To Lot Size | ||
| 289 | LOSDIV | Lot size divisor | ||
| 290 | LOSGRBIS | To lot size | ||
| 291 | LOSGRVON | From Lot Size | ||
| 292 | LOSVN | From Lot Size | ||
| 293 | LZEIH | Unit for maximum storage period | ||
| 294 | MANDT | Client | ||
| 295 | MANDT | Client | ||
| 296 | MATNR | Material Number | ||
| 297 | MATNR | Material Number | ||
| 298 | MATNR | Material Number | ||
| 299 | MAUFNR | Number of superior order | ||
| 300 | MAXLZ | Maximum storage period | ||
| 301 | MDV | Planning identification | ||
| 302 | MEINS | Base Unit of Measure | ||
| 303 | MEINS | Base Unit of Measure | ||
| 304 | MKAL_MATKO | Other material for which BOM and task list are maintained | ||
| 305 | MKPRDAT | Date of last check of production version | ||
| 306 | MKSP | Production version is locked | ||
| 307 | NEND_IST | Actual finish for collective order (date) | ||
| 308 | NEND_TRM | Scheduled finish date of collective order (date) | ||
| 309 | NENT_IST | Actual finish collective order (time) | ||
| 310 | NENT_TRM | Scheduled finish collective order (time) | ||
| 311 | NETZKONT | Indicator for the account assignment of a network(hdr/act.) | ||
| 312 | NO_DISP_PLUS | Effective for Materials Planning | ||
| 313 | NPLDA | Next planned date | ||
| 314 | NSTART_IST | Actual start collective order (date) | ||
| 315 | NSTART_TRM | Scheduled start date of collective order (date) | ||
| 316 | NSTT_IST | Actual start collective order (time) | ||
| 317 | NSTT_TRM | Scheduled start collective order (time) | ||
| 318 | NWART | Type of network | ||
| 319 | OBJEKTID | Object ID | ||
| 320 | OCM_CH_PROC | Process that has lead to the change of an object | ||
| 321 | OCM_CH_PROC | Process that has lead to the change of an object | ||
| 322 | OCM_COMP_RES | OCM: Result of comparison of two order objects | ||
| 323 | OCM_OBJ_TYPE | Change indicator | ||
| 324 | OCM_OBJ_TYPE | Change indicator | ||
| 325 | O_SALDO | Order balance in order currency | ||
| 326 | PKNUM | Control cycle number | ||
| 327 | PKOSA_D | Cost collector for production process PROCNR | ||
| 328 | PKPOS | Kanban item number / control cycle item | ||
| 329 | PLART_TX | Description of the basis for scheduling | ||
| 330 | PLGKZ | Identifier for planning with line items | ||
| 331 | PLNAL | Group Counter | ||
| 332 | PLNAL | Group Counter | ||
| 333 | PLNAL | Group Counter | ||
| 334 | PLNAL | Group Counter | ||
| 335 | PLNAW | Application of the task list | ||
| 336 | PLNME | Task list unit of measure | ||
| 337 | PLNNR | Key for Task List Group | ||
| 338 | PLNNR | Key for Task List Group | ||
| 339 | PLNNR | Key for Task List Group | ||
| 340 | PLNNR | Key for Task List Group | ||
| 341 | PLNNR_REF | Number of standard networks to be copied | ||
| 342 | PLNTY | Task List Type | ||
| 343 | PLNTY | Task List Type | ||
| 344 | PLNTY | Task List Type | ||
| 345 | PLNTY | Task List Type | ||
| 346 | PLNUM | Planned order number | ||
| 347 | PLN_VERWE | Task list usage | ||
| 348 | PLWEZ | Goods receipt processing time in days | ||
| 349 | POSNR | Item number of the SD document | ||
| 350 | POSNR | Item number of the SD document | ||
| 351 | PRCTR | Profit Center | ||
| 352 | PRFG_F | Check status of production version | ||
| 353 | PRFG_G | Preliminary planning - Check status of production version | ||
| 354 | PRFG_R | Rate-based planning - Check status of production version | ||
| 355 | PRFG_S | BOM - check status of production version | ||
| 356 | PROFIDNZPL | Network profile | ||
| 357 | PRREG | Checking rule for the availability check | ||
| 358 | PRTRV | Indicator: Project date definition | ||
| 359 | PS_AKSTL | Requesting cost center | ||
| 360 | PS_KZERB | Indicator: Project summarization | ||
| 361 | PS_PLART | Basis for scheduling | ||
| 362 | PS_PSP_ELE | Work breakdown structure element (WBS element) | ||
| 363 | PS_PSP_PNR | Work Breakdown Structure Element (WBS Element) | ||
| 364 | PS_PSP_PNR | Work Breakdown Structure Element (WBS Element) | ||
| 365 | PS_PSP_PRO | Project definition | ||
| 366 | PS_SPS_ELE | Standard WBS element | ||
| 367 | PS_TERMBAS | Set of dates for network | ||
| 368 | PVS_GUID | Internal Identification for PVS Objects | ||
| 369 | QPLOS | Inspection Lot Number | ||
| 370 | QUNUM | Number of quota arrangement | ||
| 371 | QUPOS | Quota arrangement item | ||
| 372 | REDKZ | Reduction indicator for scheduling | ||
| 373 | REDKZP | Reduction indicator for scheduling (forecast) | ||
| 374 | REDKZ_TX | Description of reduction indicator | ||
| 375 | REVLV | Revision level | ||
| 376 | RGEKZ | Indicator: Backflush | ||
| 377 | RMNGA | Total confirmed rework quantity | ||
| 378 | RSNUM | Number of reservation/dependent requirements | ||
| 379 | RSNUM | Number of reservation/dependent requirements | ||
| 380 | RSNUM | Number of reservation/dependent requirements | ||
| 381 | RSORD | Refurbishment order indicator (PM) | ||
| 382 | RSPOS | Item Number of Reservation / Dependent Requirements | ||
| 383 | RTP01 | Cost collector for repetitive manufacturing | ||
| 384 | RTP02 | Cost collector for KANBAN | ||
| 385 | RTP03 | Cost collector for valuated sales order stock | ||
| 386 | RTP04 | Cost collector for external PPC | ||
| 387 | SA_AUFNR | Run schedule header number | ||
| 388 | SA_ELPRO | Proposed issue storage location for components | ||
| 389 | SA_LINE1 | Production line for repetitive manufacturing | ||
| 390 | SA_LOSBS | Upper value of the lot-size interval | ||
| 391 | SA_LOSVN | Lower value of the lot-size interval | ||
| 392 | SA_PRVBE | Default supply area for components | ||
| 393 | SA_RGEKZ | Indicator: backflush for RS header | ||
| 394 | SA_VERSI | Repetitive manufacturing allowed for version | ||
| 395 | SA_VERTL | MRP Distribution Key | ||
| 396 | SA_VERTO | Distribution key for quantity produced | ||
| 397 | SCOPE_CV | Object Class | ||
| 398 | SERAIL | Serial Number Profile | ||
| 399 | SERNR | BOM explosion number | ||
| 400 | SICHZ | Float after production (in days) | ||
| 401 | SICHZ_TRM | Scheduled float after production in days | ||
| 402 | SOBES | Special procurement type | ||
| 403 | SOBKZ | Special Stock Indicator | ||
| 404 | SOBSL | Special procurement type | ||
| 405 | SPLIT_STAT | Status of an order in a split hierarchy | ||
| 406 | STALT | Alternative BOM | ||
| 407 | STALT | Alternative BOM | ||
| 408 | STLAN | BOM Usage | ||
| 409 | STLAN | BOM Usage | ||
| 410 | STLST | BOM Statuses | ||
| 411 | STLTY | BOM Category | ||
| 412 | STNUM | Bill of Material | ||
| 413 | SYSUUID_X | UUID in X form (binary) | ||
| 414 | TABIX_D | Field defined as in SY-TABIX | ||
| 415 | TECHS | Parameter Variant/Standard Variant | ||
| 416 | TECHS | Parameter Variant/Standard Variant | ||
| 417 | TERHW | Scheduling note from order scheduling | ||
| 418 | TERMKZ | Scheduling type | ||
| 419 | TERMKZP | Scheduling type (forecast) | ||
| 420 | TERMKZ_TXT | Description of scheduling type | ||
| 421 | TERMKZ_TXT | Description of scheduling type | ||
| 422 | TEXT40 | Text, 40 Characters Long | ||
| 423 | TIMESTAMPL | UTC Time Stamp in Long Form (YYYYMMDDhhmmssmmmuuun) | ||
| 424 | TMBAS_TX | Description of the planning type | ||
| 425 | TPAUF | Indicator: Partial conversion | ||
| 426 | TRMDT | Date of the last scheduling | ||
| 427 | TXCHG | Indicator: long text changed | ||
| 428 | TXJCD | Tax Jurisdiction | ||
| 429 | TYPKZ | Type of object causing the load (order category) | ||
| 430 | UEBTK | Indicator: Unlimited Overdelivery Allowed | ||
| 431 | UEBTO | Overdelivery Tolerance Limit | ||
| 432 | UMREN | Denominator for conversion to base units of measure | ||
| 433 | UMREZ | Numerator for Conversion to Base Units of Measure | ||
| 434 | UNTTO | Underdelivery Tolerance Limit | ||
| 435 | VAGRP | Responsible planner group/department | ||
| 436 | VANTW | Person/Group responsible for the network | ||
| 437 | VBELN | Sales and Distribution Document Number | ||
| 438 | VBOB_OB_RFMAT | Reference Material for Original Batches | ||
| 439 | VERID | Production Version | ||
| 440 | VERID | Production Version | ||
| 441 | VERS_TEXT | Short text on the production version | ||
| 442 | VORGZ | Float before production (in days) | ||
| 443 | VORGZ_TRM | Scheduled float before production in days | ||
| 444 | VSNMR_V | Sales document version number | ||
| 445 | WEGXX | Path (for Multi-Level BOM Explosions) | ||
| 446 | WEGXX | Path (for Multi-Level BOM Explosions) | ||
| 447 | WEMPF | Goods recipient | ||
| 448 | WEPOS | Goods Receipt Indicator | ||
| 449 | WERKS_D | Plant | ||
| 450 | WERKS_D | Plant | ||
| 451 | WERKS_D | Plant | ||
| 452 | WEUNB | Goods Receipt, Non-Valuated | ||
| 453 | WEWRT | Value of goods received in local currency | ||
| 454 | WFCID | Factory Calendar | ||
| 455 | XFELD | Checkbox | ||
| 456 | XFELD | Checkbox | ||
| 457 | XFELD | Checkbox |