Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MG (Package) Application development R/3 material master prior to 3.0
Basic Data
Data Element | SOBSL |
Short Description | Special procurement type |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | SOBSL | |
Data Type | CHAR | Character String |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table | T460A |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | SPPROCTYPE | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | SP type |
Medium | 15 | SpecProcurement |
Long | 20 | Special procurement |
Heading | 3 | SPT |
Documentation
Definition
Allows you to define the procurement type more exactly. The system determines the procurement type from the material type.
Use
You use special procurement when you want to be able to override the procurement type in the material master or define the procurement type more precisely.
If the procurement type is in-house, you can nevertheless force the system to ignore the BOM and routing, and process the material as if it were externally procured, by specifying the special procurement as external.
Procedure
Enter the special procurement type to which you want to restrict the selection.
Example
If you procure a material externally, you may want to choose the special procurement type Consignment. If you produce the material in-house, it may be appropriate to choose Production in other plant.
Dependencies
If a material has a routing but no BOM, it is treated as an externally procured material even if the procurement type is in-house. Both the BOM and the routing are ignored.
However, if you specify the special procurement type as in-house, the routing is included even if the material has no BOM.
Supplementary Documentation - SOBSL 0001
Use
Procedure
Please enter the special procurement type for which you want to restrict the selection.
Examples
Dependencies
History
Last changed by/on | SAP | 19981111 |
SAP Release Created in |