SAP ABAP Data Element NPLDA (Next planned date)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ IPRM (Package) Application Development R/3 Preventive Maintenance
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ IPRM (Package) Application Development R/3 Preventive Maintenance
Basic Data
Data Element | NPLDA |
Short Description | Next planned date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | PlanDate |
Medium | 15 | Planned Date |
Long | 20 | Planned Date |
Heading | 10 | PlanDate |
Documentation
Definition
The next planned date describes the time at which a maintenance task, for example, a maintenance order is to be executed.
Note
In the case of precise key date scheduling, if there is a date at which no factory calendar is maintained, the system determines a planned date on the basis of the Gregorian calendar.
The planned date is affected by the float.
History
Last changed by/on | SAP | 20030108 |
SAP Release Created in |