SAP ABAP Data Element CK_LOSGR (Costing lot size)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CK (Package) R/3 Application development: PP Product Costing
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CK (Package) R/3 Application development: PP Product Costing
Basic Data
Data Element | CK_LOSGR |
Short Description | Costing lot size |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | MENG13 | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 13 | |
Decimal Places | 3 | |
Output Length | 17 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | LOT_SIZE | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Lot size |
Medium | 15 | Cstg lot size |
Long | 20 | Costing lot size |
Heading | 20 | Costing lot size |
Documentation
Definition
Lot size of the costed object (such as a material or sales order) used in the product cost estimate.
Use
The costing lot size in the material master record is usually used as a basis for costing all materials within one low-level code. If these materials (such as semi-finished products) are used in materials (such as finished products) in the next-highest low-level code, the costing results are converted to the costing lot size of the material costed (in this case, the finished product) to calculate the material costs for the finished product.
Procedure
Examples
Dependencies
In material costing and sales order costing, you can make a setting in the costing variant to have the system use the costing lot size of the highest material as a basis for costing the materials below it.
History
Last changed by/on | SAP | 19991108 |
SAP Release Created in |