SAP ABAP Data Element VERID (Production Version)
Hierarchy
SAP_ABA (Software Component) Cross-Application Component
   CA-GTF-TS (Application Component) Technical Application Support
     BK (Package) CO Cross-application Objects
Basic Data
Data Element VERID
Short Description Production Version  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type VERID    
Data Type CHAR   Character String 
Length 4    
Decimal Places 0    
Output Length 4    
Value Table MKAL    
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID VER  
Default Component name VERSION   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Version 
Medium 15 Prod. Version 
Long 20 Production Version 
Heading Ver. 
Documentation

Definition

Key which determines the various production techniques according to which a material can be manufactured.

The production version determines the following:

Supplementary Documentation - VERID 0001

Use

Procedure

Please enter the following data:

  • either the number of the run schedule and the period of examination
  • or the material number, the version, the selection key date and the period of examination.

Examples

Dependencies

Supplementary Documentation - VERID 0002

Use

Several run schedule headers can exist for one material and production version. The run-times of the individual RS headers, however, may not overlap. Therefore, the selection key date together with the material number and the production version can be used as selection criteria to explicitly identify one particular run schedule header.

Procedure

If you do not know the number of a RS header, you can select the one you are interseted in by entering the material, the version, and the selection key date.

Supplementary Documentation - VERID 0003

Use

You can use this method to select requirements that arise with regard to this production version.

Dependencies

Example

Supplementary Documentation - VERID 0005

Use

Procedure

Examples

Dependencies

You create the production versions for the material in the material master record.

You can only create a run schedule header if a production version has been maintained for the material.

You can only display possible entries if a production version has been entered for the material.

Supplementary Documentation - VERID 0010

Use

Procedure

Enter the production version you want to use to limit the selection.

Examples

Dependencies

Supplementary Documentation - VERID 0130

Definition

Production version, used to select a new BOM or a new routing.

Dependencies

If you want to select a production version for master data selection, then you must also switch on the indicator New routing or New BOM depending on the data that you want to copy from the production version.

Supplementary Documentation - VERID 0140

Use

If several production versions are defined for the material to be manufactured, then the system specifies the production version that is used in this production order in this field.

Supplementary Documentation - VERID 0200

Definition

A key that identifies a production version for the recipe header material.

Production versions describe the various production techniques that can be used to produce a material. They determine the following:

  • Which alternative BOMs to use
  • Which plan or master recipe to use. Various plans can then be assigned to this plan or master recipe, depending on the planning level (detailed, rate-based or rough-cut planning)
  • The period of time and lot size for which the production version is valid

Use

Production versions are used in requirements planning, repetitive manufacturing, process manufacturing and product costing in order to select the correct data for an order or a costing run.

Note

In the master recipe, you can store one specific production version for each assigned material. You must create all other production versions in the material master record (Work Preparation view) or the maintenance transaction of the production version.

Dependencies

The production version is a prerequisite for the maintenance of recipe-specific material data in the material list.

Supplementary Documentation - VERID 0201

Definition

Key identifying a production version for the BOM header material in the recipe.

Production versions describe the different production methods by which a material can be produced, and define the:

  • Alternative BOM to be used.
  • Plan or planning recipe to be used, whereby different plans can be assigned depending on the planning level (detailed, rate-based, rough-cut capacity planning).
  • Period and lot-size range in which the production version is to be valid.

Use

If, when creating a production version, you specify a version here, the recipe will be assigned to this version as a detailed plan. However, you can edit the production version at a later date from the recipe header.

If, when changing a production version, you specify a version here, the system selects the planning recipe and the material or bill of material of this production version.

Dependencies

A production version is required before you can maintain recipe-specific material data in the material list.

History
Last changed by/on SAP  19981210 
SAP Release Created in