SAP ABAP Data Element CO_GIAMG (Expected variance from planned qty to be delivered to stock)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-CIC (Application Component) Interaction Center WinClient
     CO (Package) R/3 Application development: PP Production orders
Basic Data
Data Element CO_GIAMG
Short Description Expected variance from planned qty to be delivered to stock  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type MENG13    
Data Type QUAN   Quantity field, points to a unit field with format UNIT 
Length 13    
Decimal Places 3    
Output Length 17    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 ExpcVarnce 
Medium 15 ExpectVariance 
Long 20 Expected variance 
Heading 17 Expected variance 
Documentation

Definition

Difference between the planned yield and the confirmed yield of the last operation for which there is a final confirmation.

History
Last changed by/on SAP  19950401 
SAP Release Created in 470