Hierarchy

⤷

⤷

Basic Data
Data Element | SA_LINE1 |
Short Description | Production line for repetitive manufacturing |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | ARBPL | |
Data Type | CHAR | Character String |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 8 | |
Value Table |
Further Characteristics
Search Help: Name | RMLINE | |
Search Help: Parameters | ARBPL | |
Parameter ID | AGR | |
Default Component name | PROD_LINE | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Prod.line |
Medium | 15 | Production line |
Long | 20 | Production line |
Heading | 8 | ProdLine |
Documentation
Definition
The production line describes the capacities of repetitive manufacturing and can be represented in the system either by an individual work center or by a line hierarchy.
You enter the production line in the production version.
Use
The production line is required for capacity planning and for making your selections in the initial screen of the planning table.
Procedure
Define the production line in the production version:
If you have created a work center instead of a production line, enter the number of of the work center.
If you have maintained a line hierarchy, enter the number of the line hierarchy.
Dependencies
The production line you enter in the production version must also be used in the routing if you want to plan capacities.
The line hierarchy provides you with the possibility of splitting the production line into individual elements, such as processing stations. This means you can control material provision to the individual processing stations or you can plan capacity for one particular bottleneck station in detail. You achieve this situation by creating a work center for the production line and for each individual processing station and you also have to maintain a line hierarchy. In the line hierarchy, you must also define one of the work centers as the scheduling work center. The system uses the scheduling work center for scheduling and capacity planning. Therefore, it also has to be used in the routing.
Supplementary Documentation - SA_LINE1 0001
Use
Procedure
Enter the production line you want to use to limit the selection.
Examples
Dependencies
Supplementary Documentation - SA_LINE1 0002
Use
In this way, you can select all requirements to be produced on this production line.
Procedure
Examples
Dependencies
History
Last changed by/on | SAP | 19991110 |
SAP Release Created in |