SAP ABAP Data Element CO_PENDD (Outline finish of collective order (date))
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ CO (Package) R/3 Application development: PP Production orders
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ CO (Package) R/3 Application development: PP Production orders
Basic Data
Data Element | CO_PENDD |
Short Description | Outline finish of collective order (date) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Finish |
Medium | 15 | Finish |
Long | 20 | Finish |
Heading | 10 | Out.finish |
Documentation
Definition
Finish date that is used to schedule
- a subtree within a collective order
- an entire collective order
This date is entered by the user.
Use
During the scheduling run, the system tries to keep all the orders being scheduled within the outline dates.
Dependencies
In order to adhere to the outline dates, the system automatically adapts the basic dates of the individual orders.
History
Last changed by/on | SAP | 19981210 |
SAP Release Created in |