SAP ABAP Data Element CO_FTRMS (Scheduled release date)
Hierarchy
SAP_ABA (Software Component) Cross-Application Component
   CA-GTF-PS (Application Component) Cross-Application Objects in Project System
     BC (Package) Cross-Application Objects PP/PS
Basic Data
Data Element CO_FTRMS
Short Description Scheduled release date  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DATUM    
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name SCHED_RELEASE_DATE   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Release 
Medium 15 Release 
Long 20 Sched. release date 
Heading 55 Scheduled release date 
Documentation

Definition

Scheduled release date

Supplementary Documentation - CO_FTRMS 0001

Use

Date on which the order is to be released (as specified by release period).

Supplementary Documentation - CO_FTRMS 0400

Procedure

If you want to select production orders to be released by their release date, enter the desired date interval in this field.

Supplementary Documentation - CO_FTRMS 1000

Definition

Date that refers to the scheduled start and that takes the release period into account

Use

You can use this date as a recommended release date in order to leave enough time between release and starting production for necessary preparations to be carried out.

The scheduled release date can be used in the collective release function and the order information system as a selection criterion. You can, for instance, in a collective release, select and release all the orders that have today's date as the scheduled rtelease date.

Procedure

Examples

Dependencies

Supplementary Documentation - CO_FTRMS 2120

Dependencies

The scheduled release date corresponds to the scheduled start date of the network.

History
Last changed by/on SAP  19990629 
SAP Release Created in