SAP ABAP Table COCF_ORDER_HDR (PP Order header)
Hierarchy
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
   PP-SFC-IS (Application Component) Information System
     COCF_MANDASH (Package) Manufacturind dashboards for mid-market
Basic Data
Table Category INTTAB    Structure 
Structure COCF_ORDER_HDR   Table Relationship Diagram
Short Description PP Order header    
Delivery and Maintenance
Pool/cluster      
Delivery Class      
Data Browser/Table View Maintenance     Display/Maintenance Allowed with Restrictions 
Components
     
Field Key Data Element Domain Data
Type
Length Decimal
Places
Short Description Check
table
1 APPLID COCF_MD_APPLID COCF_MD_APPLID CHAR 14   0   Application ID for Manufacturing Dashboard  
2 GRPVAR RALDB_VARI RALDB_VARI CHAR 14   0   Variant Name  
3 INDVAR RALDB_VARI RALDB_VARI CHAR 14   0   Variant Name  
4 AUFNR AUFNR AUFNR CHAR 12   0   Order Number *
5 AUFPL CO_AUFPL AUFPL NUMC 10   0   Routing number of operations in the order  
6 AUART AUFART AUFART CHAR 4   0   Order Type *
7 AUTYP AUFTYP AUFTYP NUMC 2   0   Order category  
8 ERDAT AUFERFDAT DATUM DATS 8   0   Created on  
9 AEDAT AUFAEDAT DATUM DATS 8   0   Change date for Order Master  
10 OBJNR J_OBJNR J_OBJNR CHAR 22   0   Object number *
11 BUKRS BUKRS BUKRS CHAR 4   0   Company Code *
12 WERKS WERKS_D WERKS CHAR 4   0   Plant *
13 PLGRP VAGRP VAGRP CHAR 3   0   Responsible planner group/department *
14 DISPO CO_DISPO DISPO CHAR 3   0   MRP controller for the order *
15 FEVOR FEVOR FEVOR CHAR 3   0   Production Supervisor *
16 GLTRP CO_GLTRP DATUM DATS 8   0   Basic finish date  
17 GSTRP CO_GSTRP DATUM DATS 8   0   Basic start date  
18 FTRMS CO_FTRMS DATUM DATS 8   0   Scheduled release date  
19 GLTRS CO_GLTRS DATUM DATS 8   0   Scheduled finish  
20 GSTRS CO_GSTRS DATUM DATS 8   0   Scheduled start  
21 GSTRI CO_GSTRI DATUM DATS 8   0   Actual start date  
22 GETRI CO_GETRI DATUM DATS 8   0   Confirmed Order Finish Date  
23 GLTRI CO_GLTRI DATUM DATS 8   0   Actual finish date  
24 FTRMI CO_FTRMI DATUM DATS 8   0   Actual release date  
25 FTRMP CO_FTRMP DATUM DATS 8   0   Planned release date  
26 GASMG MC_GASMG MENGV15 QUAN 15   3   Total Scrap Quantity in the Order  
27 GAMNG MC_GAMNG MENGV15 QUAN 15   3   Total order quantity  
28 GMEIN MEINS MEINS UNIT 3   0   Base Unit of Measure *
29 VERID VERID VERID CHAR 4   0   Production Version *
30 MDV01 MDV01 MDVXX CHAR 8   0   Production line *
31 MDV02 MDV02 MDVXX CHAR 8   0   Planning identification 2 *
32 AMEIN CO_AUFME MEINS UNIT 3   0   Unit of measure for in-house production *
33 KUNUM KUNUM KUNNR CHAR 10   0   Customer Number *
34 VDATU MC_VDATUM DATUM DATS 8   0   Date of update for statistics updating  
35 TERKZ TERMKZ TERART CHAR 1   0   Scheduling type *
36 FA_FREI MC_FA_FREI X CHAR 1   0   Order has status RELEASED  
37 FA_GLFT MC_FA_GLFT X CHAR 1   0   Order has status DELIVERED  
38 FA_RUECK MC_FA_RUECK X CHAR 1   0   Order has status CONFIRMED  
39 FA_TGLI MC_FA_TGLI X CHAR 1   0   Order has Status PDLV  
40 FA_TRUEC MC_FA_TRUEC X CHAR 1   0   Order has status PARTIALLY CONFIRMED  
41 GLUZS CO_GLUZS UHRZT TIMS 6   0   Scheduled finish time  
42 GSUZS CO_GSUZS ATIME TIMS 6   0   Scheduled Start (Time)  
43 GSUZI CO_GSUZI UHRZT TIMS 6   0   Actual start time  
44 GEUZI CO_GEUZI UHRZT TIMS 6   0   Confirmed order finish (time)  
45 PLNME PLNME MEINS UNIT 3   0   Task list unit of measure *
46 LEAD_AUFNR CO_LAUFNR AUFNR CHAR 12   0   Leading order in current processing *
47 MAUFNR MAUFNR AUFNR CHAR 12   0   Number of superior order *
48 .INCLU-_I       0   0   PP Order Item  
49 I_AUFNR_I AUFNR AUFNR CHAR 12   0   Order Number *
50 POSNR_I CO_POSNR CO_POSNR NUMC 4   0   Order item number  
51 MATNR_I MATNR MATNR CHAR 18   0   Material Number *
52 PWERK_I CO_PWERK WERKS CHAR 4   0   Planning plant for the order *
53 ETRMP_I CO_ETRMP DATUM DATS 8   0   Opening date of the planned order  
54 STRMP_I CO_STRMP DATUM DATS 8   0   Start date of the planned order  
55 LTRMP_I CO_LTRMP DATUM DATS 8   0   Delivery date from planned order  
56 LTRMI_I CO_LTRMI DATUM DATS 8   0   Actual delivery/finish date  
57 PAMNG_I MC_AVMNG MENGV15_3 QUAN 15   3   Fixed quantity of scrap from production  
58 PGMNG_I MC_GSMNG MENGV15_3 QUAN 15   3   Total planned order quantity  
59 MEINS_I LAGME MEINS UNIT 3   0   Base Unit of Measure *
60 MCPAMNG_I MC_MCPAMNG MENGV15 QUAN 15   3   Fixed production scrap qty in unit of in-house production  
61 MCPGMNG_I MC_MCPGMNG MENGV15 QUAN 15   3   Total planned order quantity in unit of in-house production  
62 PSAMG_I MC_PSAMG MENGV15_3 QUAN 15   3   Scrap quantity in item  
63 PSMNG_I MC_PSMNG MENGV15_3 QUAN 15   3   Order item quantity  
64 WEMNG_I MC_WEMNG MENGV15_3 QUAN 15   3   Quantity of goods received  
65 IAMNG_I MC_IAMNG MENGV15_3 QUAN 15   3   Actual scrap quantity from an order item  
66 AMEIN_I CO_AUFME MEINS UNIT 3   0   Unit of measure for in-house production *
67 UMREZ_I UMREZ UMBSZ DEC 5   0   Numerator for Conversion to Base Units of Measure  
68 UMREN_I UMREN UMBSN DEC 5   0   Denominator for conversion to base units of measure  
69 DFZEH_I DFZEH EINHEIT UNIT 3   0   Unit of measure for execution time  
70 S_DFZ_I S_DFZ DAUER_6_1V QUAN 7   1   Target execution time  
71 I_DFZ_I I_DFZ DAUER_6_1V QUAN 7   1   Actual execution time  
72 KEINH_I CY_KEINH MEINS UNIT 3   0   Unit of of measure for displaying capacity requirements *
73 KSUMS_I MC_KSUMS DAUER_6_1V QUAN 7   1   Total target capacity requirements  
74 PLNUM_I PLNUM PLNUM CHAR 10   0   Planned order number *
75 KDAUF_I CO_KDAUF VBELN CHAR 10   0   Sales order number *
76 KDPOS_I CO_KDPOS POSNR NUMC 6   0   Sales order item *
77 KDEIN_I KDEIN NUM04 NUMC 4   0   Delivery schedule for sales order  
78 LGORT_I LGORT_D LGORT CHAR 4   0   Storage location *
79 SAFNR_I SA_AUFNR SA_AUFNR CHAR 12   0   Run schedule header number *
80 VERID_I VERID VERID CHAR 4   0   Production Version *
81 SERNR_I SERNR SERNR CHAR 8   0   BOM explosion number *
82 CHARG_I CHARG_D CHARG CHAR 10   0   Batch Number *
83 GSBER_I GSBER GSBER CHAR 4   0   Business Area *
84 SOPNR_I SAFNR SAFNR CHAR 10   0   SOP order number  
85 PLCHK1P_I MC_PLCHK1P CHAR1 CHAR 1   0   Plausibility check: item w/o actual start  
86 PLCHK2P_I MC_PLCHK2P CHAR1 CHAR 1   0   Plausibility Check: Actual Finish Date before Start Date  
87 DFZEXEH_I DFZEXEH EINHEIT UNIT 3   0   Unit for execution time (exact)  
88 S_DFZ_EX_I S_DFZ_EX DAUER_10_2V QUAN 12   2   Target execution time (exact)  
89 I_DFZ_EX_I I_DFZ_EX DAUER_10_2V QUAN 12   2   Actual execution time (exact)  
90 S_DLZ_EX_I S_DLZ_EX DAUER_10_2V QUAN 12   2   Target lead time (exact)  
91 I_DLZ_EX_I I_DLZ_EX DAUER_10_2V QUAN 12   2   Actual lead time (exact)  
92 BUDAT_I MC_LTRMI DATUM DATS 8   0   Posting date delivery/finish date, actual  
93 GRUND_I SA_GRUND CO_AGRND CHAR 4   0   Reason for scrap *
94 PSPNR_I REM_PSPNR PS_POSNR NUMC 8   0   Production lot (WBS element) *
95 P_DLZ_I P_DLZ DAUER_6_1V QUAN 7   1   Planned lead time  
96 S_DLZ_I S_DLZ DAUER_6_1V QUAN 7   1   Target lead time  
97 I_DLZ_I I_DLZ DAUER_6_1V QUAN 7   1   Actual lead time  
98 PS_FREI_I PS_FREI DAUER_6_1V QUAN 7   1   Planned/target deviation in scheduled release date  
99 PI_FREI_I PI_FREI DAUER_6_1V QUAN 7   1   Planned/actual deviation in scheduled release date  
100 SI_FREI_I DSI_FREI DAUER_6_1V QUAN 7   1   Target/actual deviation in scheduled release date  
101 PS_STAR_I PS_STAR DAUER_6_1V QUAN 7   1   Planned/target deviation in start date  
102 PI_STAR_I PI_STAR DAUER_6_1V QUAN 7   1   Planned/actual deviation in scheduled start date  
103 SI_STAR_I DSI_STAR DAUER_6_1V QUAN 7   1   Target/actual schedule deviation in start date  
104 PS_LIEF_I PS_LIEF DAUER_6_1V QUAN 7   1   Planned/target deviation in scheduled delivery date  
105 PI_LIEF_I PI_LIEF DAUER_6_1V QUAN 7   1   Planned/actual deviation in scheduled delivery date  
106 SI_LIEF_I DSI_LIEF DAUER_6_1V QUAN 7   1   Target/actual deviation in scheduled delivery date  
107 .INCLU-_O       0   0   PP Order Operation  
108 AUFPL_O CO_AUFPL AUFPL NUMC 10   0   Routing number of operations in the order  
109 APLZL_O CIM_COUNT CIM_COUNT NUMC 8   0   Internal counter  
110 ZAEHL_O CIM_COUNT CIM_COUNT NUMC 8   0   Internal counter  
111 PLNFL_O PLNFOLGE PLNFOLGE CHAR 6   0   Sequence  
112 VORNR_O VORNR VORNR CHAR 4   0   Operation/Activity Number  
113 ARBID_O OBJEKTID NUM08 NUMC 8   0   Object ID  
114 KAPAR_O KAPART KAPART CHAR 3   0   Capacity category *
115 KAPID_O KAPID KAPID NUMC 8   0   Capacity ID *
116 ARBPL_O ARBPL ARBPL CHAR 8   0   Work center  
117 WERKS_O WERKS_D WERKS CHAR 4   0   Plant *
118 STEUS_O STEUS STEUS CHAR 4   0   Control key *
119 OBJNR_O J_OBJNR J_OBJNR CHAR 22   0   Object number *
120 MEINH_O VORME MEINS UNIT 3   0   Unit of measure for activity *
121 UMREN_O UMREN UMBSN DEC 5   0   Denominator for conversion to base units of measure  
122 UMREZ_O UMREZ UMBSZ DEC 5   0   Numerator for Conversion to Base Units of Measure  
123 BMSCH_O BMSCH BMSCH QUAN 13   3   Base Quantity  
124 VERTL_O VERTEILUNG VERTEILUNG CHAR 2   0   Distribution function for capacity requirements *
125 KALID_O WFCID WFCID CHAR 2   0   Factory Calendar *
126 MGVRG_O MC_MGVRG MENGV15 QUAN 15   3   Operation quantity  
127 ASVRG_O MC_ASVRG MENGV15 QUAN 15   3   Operation scrap  
128 LMNGA_O MC_LMNGA MENGV15 QUAN 15   3   Total quantity confirmed  
129 XMNGA_O MC_XMNGA MENGV15 QUAN 15   3   Total scrap quantity confirmed  
130 GMNGA_O MC_GMNGA MENGV15 QUAN 15   3   Total Delivered Lot Size  
131 SSADD_O SSADD DATUM DATS 8   0   Latest target input date  
132 IADD_O IADD DATUM DATS 8   0   Actual input date  
133 FSAVD_O FSAVD DATUM DATS 8   0   Earliest scheduled start: Execution (date)  
134 SSAVD_O SSAVD DATUM DATS 8   0   Latest scheduled start: Execution (date)  
135 SSAVZ_O SSAVZ ATIME TIMS 6   0   Latest scheduled start: Execution (time)  
136 ISDD_O ISDD DATUM DATS 8   0   Actual start: Execution (date)  
137 ISDZ_O ISDZ ATIME TIMS 6   0   Actual start: Execution/setup (time)  
138 ISAVD_O ISAVD DATUM DATS 8   0   Actual operation start (date)  
139 FSEDD_O FSEDD DATUM DATS 8   0   Earliest scheduled finish: Execution (date)  
140 SSEDD_O SSEDD DATUM DATS 8   0   Latest scheduled finish: Execution (date)  
141 SSEDZ_O SSEDZ ATIME TIMS 6   0   Latest scheduled finish: Execution (time)  
142 IEDD_O IEDD DATUM DATS 8   0   Actual finish: Execution (date)  
143 IEDZ_O IEDZ ATIME TIMS 6   0   Actual finish: Execution (time)  
144 IEAVD_O IEAVD DATUM DATS 8   0   Actual finish of operation (date)  
145 N_IEAVD_O N_IEAVD DATUM DATS 8   0   Actual end of successor operation  
146 WARTZ_O MC_WARTZ DAUER_6_1V QUAN 7   1   Queue time used for scheduling  
147 WRTZE_O WTRZE EINHEIT UNIT 3   0   Unit of measure for queue time  
148 RUEST_O MC_RUEST DAUER_6_1V QUAN 7   1   Scheduled setup time  
149 RSTZE_O RSTZE EINHEIT UNIT 3   0   Unit of measure for setup time  
150 BEARZ_O MC_BEARZ DAUER_6_1V QUAN 7   1   Scheduled processing time  
151 BEAZE_O BEAZE EINHEIT UNIT 3   0   Unit of measure for processing time  
152 ABRUE_O MC_ABRUE DAUER_6_1V QUAN 7   1   Scheduled teardown time  
153 ARUZE_O ARUZE EINHEIT UNIT 3   0   Unit of measure for teardown  
154 LIEGZ_O MC_LIEGZ DAUER_6_1V QUAN 7   1   Wait time used for scheduling  
155 V_LIEGZ_O MC_LIEGZ DAUER_6_1V QUAN 7   1   Wait time used for scheduling  
156 LIGZE_O LIGZE EINHEIT UNIT 3   0   Unit of measure for wait time  
157 TRANZ_O MC_TRANZ DAUER_6_1V QUAN 7   1   Move time used for scheduling  
158 KRUES_O MC_KRUES DAUER_6_1V QUAN 7   1   Scheduled cap. requirements for the op. segment "setup"  
159 KBEAS_O MC_KBEAS DAUER_6_1V QUAN 7   1   Scheduled cap. requirements for the op. segment "processing"  
160 KABRS_O MC_KABRS DAUER_6_1V QUAN 7   1   Scheduled cap. requirements for the op. segment teardown  
161 KEINH_O CY_KEINH MEINS UNIT 3   0   Unit of of measure for displaying capacity requirements *
162 TRAZE_O TRAZE EINHEIT UNIT 3   0   Unit of measure for move time  
163 DFZEH_O DFZEH EINHEIT UNIT 3   0   Unit of measure for execution time  
164 S_DFZ_O S_DFZ DAUER_6_1V QUAN 7   1   Target execution time  
165 I_DFZ_O I_DFZ DAUER_6_1V QUAN 7   1   Actual execution time  
166 KAPKZ_O KAPKZ X CHAR 1   0   SFIS indicator for cumulative updating of capacity data  
167 PLCHK1V_O MC_PLCHK1V CHAR1 CHAR 1   0   Plausibility check: operation without actual input  
168 PLCHK2V_O MC_PLCHK2V CHAR1 CHAR 1   0   Plausibility Check: Actual Finish of Op. before Actual input  
169 PLCHK3V_O MC_PLCHK3V CHAR1 CHAR 1   0   Plausibility check: invalid milestone confirmation  
170 VDATU_O MC_VDATUM DATUM DATS 8   0   Date of update for statistics updating  
171 BUDAT_O MC_BUCHDAT DATUM DATS 8   0   Posting date of last confirmation  
172 UVORN_O UVORN VORNR CHAR 4   0   Suboperation  
173 VGE01_O MCVGWRTEH1 MEINS UNIT 3   0   Unit of measure for standard value 1 *
174 SMNG1_O MCSMNG1 MENGV15 QUAN 15   3   Quantity to be confirmed for activity type 1  
175 ZMNG1_O MCZMNG1 MENGV15 QUAN 15   3   Target quantity of activity type 1  
176 ZMNG1OZ_O MCZMNG1OZ MENGV15 QUAN 15   3   Target quantity/activity type 1 w/o perfmnce efficiency rate  
177 VGE02_O MCVGWRTEH2 MEINS UNIT 3   0   Unit of measure for standard value 2 *
178 SMNG2_O MCSMNG2 MENGV15 QUAN 15   3   Quantity to be confirmed for activity type 2  
179 ZMNG2_O MCZMNG2 MENGV15 QUAN 15   3   Target quantity of activity type 2  
180 ZMNG2OZ_O MCZMNG2OZ MENGV15 QUAN 15   3   Target quantity/activity type 2 w/o perfmnce efficiency rate  
181 VGE03_O MCVGWRTEH3 MEINS UNIT 3   0   Unit of measure for standard value 3 *
182 SMNG3_O MCSMNG3 MENGV15 QUAN 15   3   Quantity to be confirmed for activity type 3  
183 ZMNG3_O MCZMNG3 MENGV15 QUAN 15   3   Target quantity of activity type 3  
184 ZMNG3OZ_O MCZMNG3OZ MENGV15 QUAN 15   3   Target quantity/activity type 3 w/o perfmnce efficiency rate  
185 VGE04_O MCVGWRTEH4 MEINS UNIT 3   0   Unit of measure for standard value 4 *
186 SMNG4_O MCSMNG4 MENGV15 QUAN 15   3   Quantity to be confirmed for activity type 4  
187 ZMNG4_O MCZMNG4 MENGV15 QUAN 15   3   Target quantity of activity type 4  
188 ZMNG4OZ_O MCZMNG4OZ MENGV15 QUAN 15   3   Target quantity/activity type 4 w/o perfmnce efficiency rate  
189 VGE05_O MCVGWRTEH5 MEINS UNIT 3   0   Unit of measure for standard value 5 *
190 SMNG5_O MCSMNG5 MENGV15 QUAN 15   3   Quantity to be confirmed for activity type 5  
191 ZMNG5_O MCZMNG5 MENGV15 QUAN 15   3   Target quantity of activity type 5  
192 ZMNG5OZ_O MCZMNG5OZ MENGV15 QUAN 15   3   Target quantity/activity type 5 w/o perfmnce efficiency rate  
193 VGE06_O MCVGWRTEH6 MEINS UNIT 3   0   Unit of measure for standard value 6 *
194 SMNG6_O MCSMNG6 MENGV15 QUAN 15   3   Quantity to be confirmed for activity type 6  
195 ZMNG6_O MCZMNG6 MENGV15 QUAN 15   3   Target quantity of activity type 6  
196 ZMNG6OZ_O MCZMNG6OZ MENGV15 QUAN 15   3   Target quantity/activity type 6 w/o perfmnce efficiency rate  
197 ILE01_O MCISMEH1 MEINS UNIT 3   0   Unit of measure for 1st activity to be confirmed *
198 ISM01_O MCRUMNG1 MENGV15 QUAN 15   3   Confirmed activity 1 - activity type  
199 ILE02_O MCISMEH2 MEINS UNIT 3   0   Unit of measure for 2nd activity to be confirmed *
200 ISM02_O MCRUMNG2 MENGV15 QUAN 15   3   Confirmed activity 2 - activity type  
201 ILE03_O MCISMEH3 MEINS UNIT 3   0   Unit of measure for 3rd activity to be confirmed *
202 ISM03_O MCRUMNG3 MENGV15 QUAN 15   3   Confirmed activity 3 - activity type  
203 ILE04_O MCISMEH4 MEINS UNIT 3   0   Unit of measure for 4th activity to be confirmed *
204 ISM04_O MCRUMNG4 MENGV15 QUAN 15   3   Confirmed activity 4 - activity type  
205 ILE05_O MCISMEH5 MEINS UNIT 3   0   Unit of measure for 5th activity to be confirmed *
206 ISM05_O MCRUMNG5 MENGV15 QUAN 15   3   Confirmed activity 5 - activity type  
207 ILE06_O MCISMEH6 MEINS UNIT 3   0   Unit of measure for 6th activity to be confirmed *
208 ISM06_O MCRUMNG6 MENGV15 QUAN 15   3   Confirmed activity - activity type 6  
209 LSTEFF1_O MC_LSTEFF1 MENGV15 QUAN 15   3   Efficiency of activity type 1  
210 LSTEFF2_O MC_LSTEFF2 MENGV15 QUAN 15   3   Efficiency of activity type 2  
211 LSTEFF3_O MC_LSTEFF3 MENGV15 QUAN 15   3   Efficiency of activity type 3  
212 LSTEFF4_O MC_LSTEFF4 MENGV15 QUAN 15   3   Efficiency of activity type 4  
213 LSTEFF5_O MC_LSTEFF5 MENGV15 QUAN 15   3   Efficiency of activity type 4  
214 LSTEFF6_O MC_LSTEFF6 MENGV15 QUAN 15   3   Efficiency of activity type 6  
215 ZGR01_O MC_ZGR01 PROZENT101 DEC 11   1   Target performance efficiency rate for activity type 1  
216 ZGR02_O MC_ZGR02 PROZENT101 DEC 11   1   Target performance efficiency rate for activity type 2  
217 ZGR03_O MC_ZGR03 PROZENT101 DEC 11   1   Target performance efficiency rate for activity type 3  
218 ZGR04_O MC_ZGR04 PROZENT101 DEC 11   1   Target performance efficiency rate for activity type 4  
219 ZGR05_O MC_ZGR05 PROZENT101 DEC 11   1   Target performance efficiency rate for activity type 5  
220 ZGR06_O MC_ZGR06 PROZENT101 DEC 11   1   Target performance efficiency rate for activity type 6  
221 VG_FREI_O MC_VG_FREI X CHAR 1   0   Operation has status RELEASED  
222 VG_RUECK_O MC_VG_RUECK X CHAR 1   0   Operation has status CONFIRMED  
223 VG_TRUEC_O MC_VG_TRUEC X CHAR 1   0   Operation has status PARTIALLY CONFIRMED  
224 VG_RMAN_O MC_VG_RMAN X CHAR 1   0   Operation has status RMAN  
225 VERAN_O AP_VERAN AP_VERAN CHAR 3   0   Person responsible for the work center *
226 PLANR_O KAPPLANER KAPPLANER CHAR 3   0   Capacity planner group *
227 DFZEXEH_O DFZEXEH EINHEIT UNIT 3   0   Unit for execution time (exact)  
228 S_DFZ_EX_O S_DFZ_EX DAUER_10_2V QUAN 12   2   Target execution time (exact)  
229 I_DFZ_EX_O I_DFZ_EX DAUER_10_2V QUAN 12   2   Actual execution time (exact)  
230 SSADZ_O SSADZ ATIME TIMS 6   0   Latest target input (time of day)  
231 IADZ_O IADZ ATIME TIMS 6   0   Actual input (time of day)  
232 REFOP24_O REFOP24 REFOP24 CHAR 24   0   Reference operation set  
233 PLNTY_O PLNTY PLNTY CHAR 1   0   Task List Type *
234 VPLTY_O VPLTY PLNTY CHAR 1   0   Task list type for reference *
235 PLNNR_O PLNNR PLNNR CHAR 8   0   Key for Task List Group  
236 PLNKN_O PLNKN KNTNR NUMC 8   0   Number of the task list node  
237 VPLNR_O VPLNNR PLNNR CHAR 8   0   Group of the referenced task list  
238 STDKN_O STDKN KNTNR NUMC 8   0   Node of operation within reference operation set  
239 I_RUEST_O MCRUESTI DAUER_6_1V QUAN 7   1   Actual setup time  
240 I_BEARZ_O MCBEARZI DAUER_6_1V QUAN 7   1   Actual processing time  
241 I_ABRUE_O MCABRUEI DAUER_6_1V QUAN 7   1   Actual teardown  
242 S_DLZ_EX_O S_DLZ_EX DAUER_10_2V QUAN 12   2   Target lead time (exact)  
243 I_DLZ_EX_O I_DLZ_EX DAUER_10_2V QUAN 12   2   Actual lead time (exact)  
244 LOART_O LOHNART LOART CHAR 4   0   Wage type  
245 QUALF_O QUALF QUALF CHAR 2   0   Suitability *
246 LOGRP_O LOHNGRP LOHNGRP CHAR 3   0   Wage group *
247 GRUND_O CO_AGRND CO_AGRND CHAR 4   0   Reason for Variance *
248 PERNR_O CO_PERNR PERNR NUMC 8   0   Personnel number  
249 ARBII_O CR_OBJID_I CR_OBJID NUMC 8   0   Actual operating resources object identification *
250 WERKSI_O WERKS_D WERKS CHAR 4   0   Plant *
251 ARBPLI_O ARBPL ARBPL CHAR 8   0   Work center  
252 VERANI_O AP_VERAN AP_VERAN CHAR 3   0   Person responsible for the work center *
253 S_DLZ_O S_DLZ DAUER_6_1V QUAN 7   1   Target lead time  
254 I_DLZ_O I_DLZ DAUER_6_1V QUAN 7   1   Actual lead time  
255 Z_TAB_O X_TAB DAUER_6_1V QUAN 7   1   Deviation from scheduled input date  
256 A_TAB_O A_TAB DAUER_6_1V QUAN 7   1   Deviation in scheduled output date  
257 R_TAB_O R_TAB DAUER_6_1V QUAN 7   1   Relative schedule deviation  
258 RUECK_O CO_RUECK CO_RUECK NUMC 10   0   Completion confirmation number for the operation  
259 RMNGA_O RMNGA MENGV13 QUAN 13   3   Total confirmed rework quantity  
260 IPRZ1_O CO_IPRZS MENGV13 QUAN 13   3   Confirmed quantity/work for business process  
261 IPRE1_O RU_IPRZE MEINS UNIT 3   0   Unit of measurement for conf. quantity for business process *
262 LAR01_O MCLSTAR01 LSTAR CHAR 6   0   1. CO activity *
263 LAR02_O MCLSTAR02 LSTAR CHAR 6   0   2. CO activity *
264 LAR03_O MCLSTAR03 LSTAR CHAR 6   0   3. CO activity *
265 LAR04_O MCLSTAR04 LSTAR CHAR 6   0   4. CO activity *
266 LAR05_O MCLSTAR05 LSTAR CHAR 6   0   5. CO activity *
267 LAR06_O MCLSTAR06 LSTAR CHAR 6   0   6. CO activity *
History
Last changed by/on SAP  20130529 
SAP Release Created in 606