SAP ABAP Data Element MCABRUEI (Actual teardown)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-IS (Application Component) Information System
⤷ MCF (Package) R/3 application development: Shop Floor Information System
⤷ PP-IS (Application Component) Information System
⤷ MCF (Package) R/3 application development: Shop Floor Information System
Basic Data
Data Element | MCABRUEI |
Short Description | Actual teardown |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DAUER_6_1V | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 7 | |
Decimal Places | 1 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Actl trdwn |
Medium | 15 | Actual teardown |
Long | 20 | Actual teardown |
Heading | 12 | Actl teardwn |
Documentation
Definition
Time it takes to return the work center to its normal state after the after the operations have been processed.
The actual teardown time is derived from the difference in time between the actual teardown start and the actual teardown finish.
In the calculation, the break times are deducted in accordance with the shift schedule.
History
Last changed by/on | SAP | 20010329 |
SAP Release Created in |