SAP ABAP Data Element IEDZ (Actual finish: Execution (time))
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-CIC (Application Component) Interaction Center WinClient
     CO (Package) R/3 Application development: PP Production orders
Basic Data
Data Element IEDZ
Short Description Actual finish: Execution (time)  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type ATIME    
Data Type TIMS   Time field (hhmmss), stored as char(6) 
Length 6    
Decimal Places 0    
Output Length 8    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID EZR  
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Act.finish 
Medium 15 Actual finish 
Long 20 Actual finish (time) 
Heading 10 Act.finish 
Documentation

Definition

Time at which the execution or the teardown of the operation or activity (PS) finished.

Supplementary Documentation - IEDZ 2200

Use

  • The field Act. shows the latest finish time of all completion confirmations.
  • The field Confirm. shows the latest time of the current completion confirmation.

History
Last changed by/on SAP  19981210 
SAP Release Created in