Data Element | CO_GLTRP |
Short Description | Basic finish date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | FINISH_DATE | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Basic fin. |
Medium | 15 | Basic fin. date |
Long | 20 | Basic finish date |
Heading | 55 | Basic finish date |
Documentation
Definition
Order finish date
Supplementary Documentation - CO_GLTRP 0001
Definition
Date on which the required quantity of the material is available (that is, the requirements date of the material).
- If, on order creation, a planned order exists for the production order/ process order, the basic dates are copied from the planned order.
- If no planned order exists on order creation, you must specify at least one basic date.
The scheduling type determines the basic dates that you must specify.
Dependencies
The order finish date is accurate to the day. However, for scheduling, production requires a completion date that also specifies the time. To ensure that the material to be manufactured is available on the order finish date, the completion date must be before 00:00 hours on the order finish date.
If, however, an in-house production time of 0 days is maintained in the material master, an exception is made to this rule. In this case, it is assumed that the material can be manufactured in a single workday. The completion date is then before 24:00 hours on the order finish date.
Example
The last operation of an order was completed on Thursday at 5 pm (17:00 hours). No float after production was maintained for the order.
- If an in-house production time greater than 0 days is maintained in the material master record, the order finish date is Friday.
- If an in-house production time of 0 days is maintained in the material master record, the order finish date is Thursday.
Supplementary Documentation - CO_GLTRP 0003
Use
You enter the basic finish date of the refurbishment order in this field.
Procedure
Examples
Dependencies
MRP expects the refurbished repairable spares to be given back on the date entered in this field.
Supplementary Documentation - CO_GLTRP 0050
Procedure
Enter the basic date of the orders for which manufacturing instructions are to be selected.
The way in which the value entered is interpreted (for example, as a single value or as an interval limit) depends on
- whether you maintain the field only in the left column or also in the right
- which selection option you choose for the value
Supplementary Documentation - CO_GLTRP 0051
Procedure
Enter the basic date of the orders here for which manufacturing instructions are to be selected.
Use the selection options to determine how the value entered is to be interpreted (for example, as a single value or as an interval limit).
Supplementary Documentation - CO_GLTRP 2120
Use
Start date for scheduling a network backwards.
A network is always scheduled forwards and backwards.
- Forward scheduling calculates the earliest start and finish dates of the activities and the scheduled finish date of the network.
- Backward scheduling calculates the latest start and finish dates of the activities and the scheduled start date of the network.
Dependencies
You can determine whether a network is first to be scheduled forwards or backwards via the scheduling type.
Supplementary Documentation - CO_GLTRP 3010
Use
In overall scheduling of the network the system calculates
- from all the networks that are linked to one another by relationships or
- from all the orders that are linked to one another
the largest common basic finish date as default value for scheduling.
You can overwrite the default value.