SAP ABAP Data Element DSI_STAR (Target/actual schedule deviation in start date)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-IS (Application Component) Information System
⤷ MCF (Package) R/3 application development: Shop Floor Information System
⤷ PP-IS (Application Component) Information System
⤷ MCF (Package) R/3 application development: Shop Floor Information System
Basic Data
Data Element | DSI_STAR |
Short Description | Target/actual schedule deviation in start date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DAUER_6_1V | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 7 | |
Decimal Places | 1 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | T/AStartDv |
Medium | 15 | T/A start dev. |
Long | 20 | T/A start deviation |
Heading | 7 | T/AStDv |
Documentation
Definition
Temporal difference between the scheduled start date and the recorded start date.
Use
In the standard of the Shop Floor Information System this key figure is calculated as the mean value when the material and the production order analyses are executed and is updated in the information structures S021 and S023.
History
Last changed by/on | SAP | 20010221 |
SAP Release Created in | 470 |