SAP ABAP Data Element MC_LIEGZ (Wait time used for scheduling)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-IS (Application Component) Information System
⤷ MCF (Package) R/3 application development: Shop Floor Information System
⤷ PP-IS (Application Component) Information System
⤷ MCF (Package) R/3 application development: Shop Floor Information System
Basic Data
Data Element | MC_LIEGZ |
Short Description | Wait time used for scheduling |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DAUER_6_1V | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 7 | |
Decimal Places | 1 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Wait time |
Medium | 15 | Wait time |
Long | 20 | Wait time |
Heading | 7 | Wait |
Documentation
Definition
Time between the end of the execution time and the start of the move time that is used in the production order for scheduling.
The SAP R/3 system differentiates maximum and minimum wait time. In scheduling, only the minimum wait time is taken into account.
Use
In the standard Shop Floor Information System, this key figure is calculated as a mean value when an operation analysis is carried out. It is then updated in the information structure S022.
History
Last changed by/on | SAP | 20010329 |
SAP Release Created in |