SAP ABAP Data Element FHORI (Scheduling Margin Key for Floats)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MG (Package) Application development R/3 material master prior to 3.0
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MG (Package) Application development R/3 material master prior to 3.0
Basic Data
Data Element | FHORI |
Short Description | Scheduling Margin Key for Floats |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | FHORI | |
Data Type | CHAR | Character String |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table | T436A |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | SM_KEY | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | SM key |
Medium | 15 | SchedMargin key |
Long | 20 | SchedMargin key |
Heading | 5 | SMKey |
Documentation
Definition
Key that the system uses to determine the floats required for scheduling an order. You define the following floats with the scheduling margin key:
- opening period
- float after production (only in the case of in-house production)
- float before production (only in the case of in-house production)
- release period (only in the case of production order management)
Floats are maintained in workdays.
Supplementary Documentation - FHORI 0001
Use
Procedure
Examples
Dependencies
You maintain the floats grouped together in the scheduling margin key in "Requirements Planning" Customizing.
History
Last changed by/on | SAP | 19981210 |
SAP Release Created in |