SAP ABAP Data Element FHORI (Scheduling Margin Key for Floats)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
MG (Package) Application development R/3 material master prior to 3.0
⤷
⤷
⤷
Basic Data
| Data Element | FHORI |
| Short Description | Scheduling Margin Key for Floats |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | FHORI | |
| Data Type | CHAR | Character String |
| Length | 3 | |
| Decimal Places | 0 | |
| Output Length | 3 | |
| Value Table | T436A |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | SM_KEY | |
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | SM key |
| Medium | 15 | SchedMargin key |
| Long | 20 | SchedMargin key |
| Heading | 5 | SMKey |
Documentation
Definition
Key that the system uses to determine the floats required for scheduling an order. You define the following floats with the scheduling margin key:
- opening period
- float after production (only in the case of in-house production)
- float before production (only in the case of in-house production)
- release period (only in the case of production order management)
Floats are maintained in workdays.
Supplementary Documentation - FHORI 0001
Use
Procedure
Examples
Dependencies
You maintain the floats grouped together in the scheduling margin key in "Requirements Planning" Customizing.
History
| Last changed by/on | SAP | 19981210 |
| SAP Release Created in |