Hierarchy
⤷ CRM-MD-PRO (Application Component) Products
⤷ CS (Package) R/3 Application development: PP Bills of Material
Basic Data
Data Element | STLAN |
Short Description | BOM Usage |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | STLAN | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table | T416 |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | CSV | |
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | BOM Usage |
Medium | 15 | Usage |
Long | 20 | BOM Usage |
Heading | 7 | BOM Usg |
Documentation
Definition
This key defines the area (such as engineering/design or production) where a BOM can be used.
Use
By setting various indicators, you can define the maximum configuration of the item status and define whether an item must be or cannot be processed in a particular area (such as production).
Procedure
Examples
A material is used in the areas production and costing in a company. For each area, you maintain a separate BOM with different items:
- Production BOM:
This BOM contains items that are relevant to production. These items are copied to the planned order. Dependent requirements are generated for them, and they are copied to the production order.
- Costing BOM:
This BOM contains items that are relevant to determining the material costs of a product.
When you calculate production costs using a quantity structure, the system automatically determines the BOM and all the BOM items that are relevant to costing, in order to calculate manufacturing costs.
Supplementary Documentation - STLAN 0001
Use
- Data is entered and edited according to organizational area.
- The BOM can be displayed for a specific usage.
Procedure
Enter the usage for which you want to enter or edit the BOM.
Supplementary Documentation - STLAN 0010
Procedure
To allow you to enter PM structure elements or items which are relevant to plant maintenance, you have to create the BOM with a usage for which items which are relevant to plant maintenance are supported.
Supplementary Documentation - STLAN 0011
Procedure
To allow you to enter PM structure elements or items which are relevant to plant maintenance, you have to create the BOM with a usage for which items which are relevant to plant maintenance are supported.
Supplementary Documentation - STLAN 0020
Procedure
If you only want to delete or replace the component in BOMs with a specific usage, enter the usage here.
The system only selects BOMs with this usage.
Supplementary Documentation - STLAN 0060
Procedure
The BOM usage allows you to manage BOMs for a certain object (such as material or equipment) in the following two ways:
- using separate BOMs for different areas within a company (such as engineering/design or production)
- using one BOM for all areas within a company
Supplementary Documentation - STLAN 0200
Definition
BOM usage assigned to the production version, for example, manufacturing or costing.
Supplementary Documentation - STLAN 1000
Use
Procedure
Enter the usage for which all BOMs with the deletion flag are to be deleted.
Examples
Dependencies
History
Last changed by/on | SAP | 19981210 |
SAP Release Created in |