SAP ABAP Data Element PRREG (Checking rule for the availability check)
Hierarchy
SAP_ABA (Software Component) Cross-Application Component
   CA-GTF-TS (Application Component) Technical Application Support
     BM (Package) MM Cross-Application Objects
Basic Data
Data Element PRREG
Short Description Checking rule for the availability check  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type PRREG    
Data Type CHAR   Character String 
Length 2    
Decimal Places 0    
Output Length 2    
Value Table T441R    
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID PRR  
Default Component name CHECK_RULE   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Check.rule 
Medium 15 Checking rule 
Long 20 Checking rule 
Heading ChR 
Documentation

Definition

Use 1:

  1. This rule defines the checking procedure to be used for the availability check (or in Inventory Management, the missing parts check) in individual applications.

Use 2:

  1. It defines, together with the checking group, the different MRP elements that make up this key figure in Flexible Planning.

Use 1: Availability Checking

Use

Along with the checking group, the checking rule specifies the final procedure for checking.

Note

Note that you must define checking rules for each individual application. Therefore, you define the checking rule for reservations via the configuration menu for production orders, for example. On the other hand, in Sales and Distribution, the checking rule is specified internally within the system and cannot be changed.

To check the availability of a material, you must enter a checking group in the material master record (in the field Availability check).

Examples

You can use the checking rule and group to determine:

  • Which receipts (for example, purchase orders or production orders) should be taken into account in the availability check
  • Which issues (for example, sales orders or dependent requirements) should be taken into account in the availability check

Use 2: Flexible Planning

Dependencies

If you use this key to define the MRP elements of this key figure for Flexible Planning, you must also select the indicator Document KF in the Customizing parameters of the information structure.

Supplementary Documentation - PRREG 0001

Use

Procedure

Only enter a checking rule here if you want to use a different checking rule than the rule that is defined as the central checking rule at transaction level for the missing parts check.

Examples

Dependencies

Supplementary Documentation - PRREG 0002

Use

The checking rule entered here is mainly valid for the availability check, but it can also be used for the missing parts check.

Procedure

Enter the checking rule for teh availability check here.

If you want to use an alternative checkling rule for the missing parts check than for the availability check then you can allocate another checking rule at movement type level.

Examples

Dependencies

A checking rule must be defined at transaction level for the missing parts check, even if you defined specific checking rules for the movements types.

History
Last changed by/on SAP  19981111 
SAP Release Created in