SAP ABAP Table E3T438M (Segment for control param. for requirements plng - mat.level)
Hierarchy
☛ BBPCRM (Software Component) BBPCRM
   ⤷ CRM-MD-PCT (Application Component) Product Catalog
     ⤷ WEDI (Package) IDoc and segment definition
Basic Data
Table Category INTTAB    Structure 
Structure E3T438M   Table Relationship Diagram
Short Description Segment for control param. for requirements plng - mat.level    
Delivery and Maintenance
Pool/cluster      
Delivery Class      
Data Browser/Table View Maintenance     Display/Maintenance Allowed with Restrictions 
Components
     
Field Key Data Element Domain Data
Type
Length Decimal
Places
Short Description Check
table
1 MSGFN MSGFN MSGFN CHAR 3   0   Function  
2 WERKS WERKS_D WERKS CHAR 4   0   Plant *
3 MTART DISGR DISGR CHAR 4   0   MRP Group *
4 BANER BANER BANER CHAR 1   0   Creation Indicator for Purchase Requisitions  
5 DISER DISER DISER CHAR 1   0   Creation Indicator for MRP Lists  
6 UMTHZ UMTHZ NUM03 NUMC 3   0   Rescheduling horizon  
7 FIXHZ FIXHZ NUM03 NUMC 3   0   Planning time fence  
8 PLAHZ PLAHZ NUM03 NUMC 3   0   Planning horizon  
9 SBDIS SBDIS NUM03 NUMC 3   0   Share of safety stock which can be used for planning  
10 LIFKZ LIFKZ LIFKZ CHAR 1   0   Automatic Schedule Lines (Scheduling Agreements)  
11 GTERM GTERM XFELD CHAR 1   0   Scheduling according to purchasing info record or agreement  
12 KZDRB KZDRB KZDRB CHAR 1   0   Indicator: direct procurement/production MRP  
13 XFAT1 XFAT1 XFELD CHAR 1   0   Firm Only Schedule Lines Transmitted to Vendor by Purchasing  
14 XFAT2 XFAT2 XFELD CHAR 1   0   Fant. 2  
15 VWVOR VWVOR NUM02 NUMC 2   0   Tolerance value for bringing forward receipt elements  
16 VWVER VWVER NUM02 NUMC 2   0   Tolerance value for displacement in the future  
17 PRREG PRREG PRREG CHAR 2   0   Checking rule for the availability check *
18 VRMOD VRMOD VRMOD CHAR 1   0   Consumption mode  
19 VINT1 VINT1 VRINT NUMC 3   0   Consumption period: backward  
20 VINT2 VINT2 VRINT NUMC 3   0   Consumption period: forward  
21 STRGR STRGR STRGR CHAR 2   0   Planning strategy group *
22 RESHZ RESHZ RESHZ DEC 2   0   Roll forward period for the master plan  
23 ANDIS ANDIS INT2 INT2 5   0   Number of Days After Which the Material Must Be Planned  
24 AUART AUFART AUFART CHAR 4   0   Order Type *
25 AUAR2 AUAR2 AUFART CHAR 4   0   Order type for process order *
26 PLSEL PLSEL PLSEL CHAR 1   0   Issue Storage Location Selection  
27 RVPKZ RVPKZ RVPKZ CHAR 1   0   Adjustment of Planned Independent Requirements  
28 RESVP RESVP RESVP DEC 3   0   Period of adjustment for planned independent requirements  
History
Last changed by/on SAP  20130529 
SAP Release Created in