SAP ABAP Data Element RVPKZ (Adjustment of Planned Independent Requirements)
Hierarchy
☛
SAP_ABA (Software Component) Cross-Application Component
⤷ CA-GTF-TS (Application Component) Technical Application Support
⤷ BMG (Package) Material Master: Componentization Interfaces
⤷ CA-GTF-TS (Application Component) Technical Application Support
⤷ BMG (Package) Material Master: Componentization Interfaces
Basic Data
Data Element | RVPKZ |
Short Description | Adjustment of Planned Independent Requirements |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | RVPKZ | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ADJUSTMENT_INDICATOR | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Adj.in.req |
Medium | 15 | Adj.ind.reqmts |
Long | 20 | Adj. plnd ind.reqmts |
Heading | 10 | Adj.in.req |
Documentation
Definition
This indicator determines whether planned independent that lie within the period of adjustment are included in the net requirements calculation. If you have set one of the indicators for adjustment and if you have maintained a period of adjustment, then the system does not create new order proposals for planned independent requirements in the planning run. This means that only customer requirements are included in planning in this period.
The folowing options exist for adjusting the planned inedependent requirements:
- Adjusting in the past, that is the period of adjustment is calculated backwards - the system starts from today's date and calculates backwards by the number of days specified. Thus, planned independent requirements that lie before the date calculated by the system are not included in the planning run.
- Adjusting in the future, that is, the period of adjustment is calculated forwards starting from today's date. All planned independent requirements that lie before the date cylculated by the system are not included in the planning run.
With these two indicators, all the planned independent requirements, irrespective of the planning strategy, are not included in the planning run during the period specified.
You can also determine;
- whether the adjustment of planned independent requirements is valid for all strategies
- or, whether it is only valid for planned independent requirements that are planned with a strategy which includes the consumption of customer and independent requirements
History
Last changed by/on | SAP | 19990629 |
SAP Release Created in |