SAP ABAP Table PPH_MAT_CTRL_PARAMS (Structure for Material Data used in Database)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-MRP (Application Component) Material Requirements Planning
⤷ PPH_ACCESS_HANA (Package) PP on HANA: Access to HANA objects
⤷ PP-MRP (Application Component) Material Requirements Planning
⤷ PPH_ACCESS_HANA (Package) PP on HANA: Access to HANA objects
Basic Data
Table Category | INTTAB | Structure |
Structure | PPH_MAT_CTRL_PARAMS | Table Relationship Diagram |
Short Description | Structure for Material Data used in Database |
Delivery and Maintenance
Pool/cluster | ||
Delivery Class | ||
Data Browser/Table View Maintenance | Display/Maintenance Allowed with Restrictions |
Components
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
|
---|---|---|---|---|---|---|---|---|---|
1 | MANDT | MANDT | MANDT | CLNT | 3 | 0 | Client | * | |
2 | MATNR | MATNR | MATNR | CHAR | 18 | 0 | Material Number | * | |
3 | WERKS | WERKS_D | WERKS | CHAR | 4 | 0 | Plant | * | |
4 | BERID | BERID | BERID | CHAR | 10 | 0 | MRP Area | * | |
5 | BERTY | BERTY | BERTY | NUMC | 2 | 0 | Type of MRP area | ||
6 | SATNR | SATNR | MATNR | CHAR | 18 | 0 | Cross-Plant Configurable Material | * | |
7 | ATTYP | ATTYP | ATTYP | CHAR | 2 | 0 | Material Category | ||
8 | MEINS | MEINS | MEINS | UNIT | 3 | 0 | Base Unit of Measure | * | |
9 | ANDEC | ANDEC | ANDEC | INT2 | 5 | 0 | No. of decimal places to which rounding should be performed | ||
10 | BESKZ | BESKZ | BESKZ | CHAR | 1 | 0 | Procurement Type | ||
11 | KZAUS | KZAUS | KZAUS | CHAR | 1 | 0 | Discontinuation indicator | ||
12 | AUSDT | AUSDT | DATUM | DATS | 8 | 0 | Effective-out date | ||
13 | DISGR | DISGR | DISGR | CHAR | 4 | 0 | MRP Group | * | |
14 | MISKZ | MISKZ | MISKZ | CHAR | 1 | 0 | Mixed MRP indicator | ||
15 | AHDIS | AHDIS | AHDIS | CHAR | 1 | 0 | MRP relevancy for dependent requirements | ||
16 | VRMOD | VRMOD | VRMOD | CHAR | 1 | 0 | Consumption mode | ||
17 | VINT1 | VINT1 | VRINT | NUMC | 3 | 0 | Consumption period: backward | ||
18 | VINT2 | VINT2 | VRINT | NUMC | 3 | 0 | Consumption period: forward | ||
19 | STDPD | STDPD | MATNR | CHAR | 18 | 0 | Configurable material | * | |
20 | CUOBV | CUOBV | CUOBJ | NUMC | 18 | 0 | Internal object number of configurable material for planning | ||
21 | BEARZ | BEARZ | DEC3_2 | DEC | 5 | 2 | Processing time | ||
22 | RUEZT | RUEZT | DEC3_2 | DEC | 5 | 2 | Setup and teardown time | ||
23 | TRANZ | TRANZ | DEC3_2 | DEC | 5 | 2 | Interoperation time | ||
24 | WEBAZ | WEBAZ | DEC3 | DEC | 3 | 0 | Goods receipt processing time in days | ||
25 | PLIFZ | PLIFZ | DEC3 | DEC | 3 | 0 | Planned delivery time in days | ||
26 | DZEIT | DZEIT | DEC3 | DEC | 3 | 0 | In-house production time | ||
27 | WZEIT | WZEIT | DEC3 | DEC | 3 | 0 | Total replenishment lead time (in workdays) | ||
28 | SHFLG | SHFLG | SHFLG | CHAR | 1 | 0 | Safety time indicator (with or without safety time) | ||
29 | SHZET | SHZET | NUMC2 | NUMC | 2 | 0 | Safety time (in workdays) | ||
30 | SHPRO | SHPRO | SHPRO | CHAR | 3 | 0 | Period profile for safety time | * | |
31 | QMATV | QMATV | XFELD | CHAR | 1 | 0 | Inspection Setup Exists for Material/Plant | ||
32 | CUOBJ | CUOBJ | CUOBJ | NUMC | 18 | 0 | Configuration (internal object number) | ||
33 | RESVP | RESVP | RESVP | DEC | 3 | 0 | Period of adjustment for planned independent requirements | ||
34 | UMLMC | UMLME | MENG13V | QUAN | 13 | 3 | Stock in transfer (plant to plant) | ||
35 | EISBE | EISBE | MENG13 | QUAN | 13 | 3 | Safety stock | ||
36 | DISLS | DISLS | DISLS | CHAR | 2 | 0 | Lot size (materials planning) | * | |
37 | MRPPP | MRPPP | MRPPP | CHAR | 3 | 0 | PPC planning calendar | * | |
38 | FXHOR | INTEGER2 | INT2 | INT2 | 5 | 0 | Integer 2 | ||
39 | DISMM | DISMM | DISMM | CHAR | 2 | 0 | MRP Type | * | |
40 | DISVF | DISVF | DISVF | CHAR | 1 | 0 | MRP procedure | ||
41 | BBBED | BBBED | XFELD | CHAR | 1 | 0 | Material staging reqmts (subcontr. reqmts) MRP element BB | ||
42 | FXART | FXART | FXART | CHAR | 1 | 0 | Firming Type of the Planning Result | ||
43 | GRREL | GRREL | XFELD | CHAR | 1 | 0 | Relevant for requirements grouping for project stock | ||
44 | RVPKZ | RVPKZ | RVPKZ | CHAR | 1 | 0 | Adjustment of Planned Independent Requirements | ||
45 | SCFLG | MD_SCFLG | XFELD | CHAR | 1 | 0 | Indicator: General Subcontracting Logic | ||
46 | XFAN1 | XFAN1 | XFELD | CHAR | 1 | 0 | Indicator: blocked stock available for planning | ||
47 | GTERM | GTERM | XFELD | CHAR | 1 | 0 | Scheduling according to purchasing info record or agreement | ||
48 | REFWK | REFWK | WERKS | CHAR | 4 | 0 | Reference plant | * | |
49 | NFVBC | NFVBC | XFELD | CHAR | 1 | 0 | Take restricted-use stock into account (only for batches) | ||
50 | KZUMB | KZUMB | XFLAG | CHAR | 1 | 0 | Indicator: stock in transfer available for planning | ||
51 | BZTEK | INTEGER1 | INT1 | INT1 | 3 | 0 | Integer 1 | ||
52 | FABKL | FABKL | WFCID | CHAR | 2 | 0 | Factory calendar key | * | |
53 | KKOWK | KKOWK | KKOWK | CHAR | 1 | 0 | Indicator: Conditions at plant level | ||
54 | MENGU | MENGU | XFELD | CHAR | 1 | 0 | Quantity Updating in Material Master Record | ||
55 | WERTU | WERTU | XFELD | CHAR | 1 | 0 | Value Updating in Material Master Record | ||
56 | MFXDT | MFXDT | DATUM | DATS | 8 | 0 | Manual firming date | ||
57 | MFHKZ | MFHKZ | XFELD | CHAR | 1 | 0 | Planning time fence set manually (MFXDT) | ||
58 | FIXTR | FIXTR | DATUM | DATS | 8 | 0 | End of planning time fence (date) | ||
59 | DISFG | DISFG | XFELD | CHAR | 1 | 0 | Activate MRP areas at client level |
History
Last changed by/on | SAP | 20130529 |
SAP Release Created in | 616 |