SAP ABAP Data Element BEARZ (Processing time)
Hierarchy
☛
SAP_ABA (Software Component) Cross-Application Component
⤷ CA-GTF-TS (Application Component) Technical Application Support
⤷ BM (Package) MM Cross-Application Objects
⤷ CA-GTF-TS (Application Component) Technical Application Support
⤷ BM (Package) MM Cross-Application Objects
Basic Data
Data Element | BEARZ |
Short Description | Processing time |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DEC3_2 | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 5 | |
Decimal Places | 2 | |
Output Length | 6 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Proc. time |
Medium | 15 | Processing time |
Long | 20 | Processing time |
Heading | 6 | PrTime |
Documentation
Definition
Specifies the time needed to process the material in the operations at the different work centers.
The processing time depends on the order quantity.
Supplementary Documentation - BEARZ 0001
Use
The processing time is required to calculate the lot size dependent in-house production time. The system then uses the in-house production time to determine the planned dates for planned orders in materials planning.
Procedure
You can define work scheduling times in the material master record in one of two ways:
- Either you enter the in-house production time. If required, you can get the system to update this value from the routing.
- Or you enter the setup, teardown, processing, and interoperation times. If you maintain these values, the system determines the in-house production time on the basis of lot size.
History
Last changed by/on | SAP | 19981111 |
SAP Release Created in |