SAP ABAP Table PPH_CTRL_FINALIZE_AGG_KPI (Structure for control type fof finalize KPI)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PP-MRP (Application Component) Material Requirements Planning
⤷
PPH_SUPPORT (Package) PP on HANA: Test Entities
⤷
⤷
Basic Data
| Table Category | INTTAB | Structure |
| Structure | PPH_CTRL_FINALIZE_AGG_KPI |
|
| Short Description | Structure for control type fof finalize KPI |
Delivery and Maintenance
| Pool/cluster | ||
| Delivery Class | ||
| Data Browser/Table View Maintenance | Display/Maintenance Allowed with Restrictions |
Components
| |
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
|---|---|---|---|---|---|---|---|---|---|
| 1 | |
MANDT | MANDT | CLNT | 3 | 0 | Client | * | |
| 2 | |
MATNR | MATNR | CHAR | 18 | 0 | Material Number | * | |
| 3 | |
PLWRK | WERKS | CHAR | 4 | 0 | Planning Plant | * | |
| 4 | |
BERID | BERID | CHAR | 10 | 0 | MRP Area | * | |
| 5 | |
BERTY | BERTY | NUMC | 2 | 0 | Type of MRP area | ||
| 6 | |
SATNR | MATNR | CHAR | 18 | 0 | Cross-Plant Configurable Material | * | |
| 7 | |
ATTYP | ATTYP | CHAR | 2 | 0 | Material Category | ||
| 8 | |
MEINS | MEINS | UNIT | 3 | 0 | Base Unit of Measure | * | |
| 9 | |
ANDEC | ANDEC | INT2 | 5 | 0 | No. of decimal places to which rounding should be performed | ||
| 10 | |
BESKZ | BESKZ | CHAR | 1 | 0 | Procurement Type | ||
| 11 | |
KZAUS | KZAUS | CHAR | 1 | 0 | Discontinuation indicator | ||
| 12 | |
AUSDT | DATUM | DATS | 8 | 0 | Effective-out date | ||
| 13 | |
DISGR | DISGR | CHAR | 4 | 0 | MRP Group | * | |
| 14 | |
MISKZ | MISKZ | CHAR | 1 | 0 | Mixed MRP indicator | ||
| 15 | |
AHDIS | AHDIS | CHAR | 1 | 0 | MRP relevancy for dependent requirements | ||
| 16 | |
VRMOD | VRMOD | CHAR | 1 | 0 | Consumption mode | ||
| 17 | |
VINT1 | VRINT | NUMC | 3 | 0 | Consumption period: backward | ||
| 18 | |
VINT2 | VRINT | NUMC | 3 | 0 | Consumption period: forward | ||
| 19 | |
STDPD | MATNR | CHAR | 18 | 0 | Configurable material | * | |
| 20 | |
CUOBV | CUOBJ | NUMC | 18 | 0 | Internal object number of configurable material for planning | ||
| 21 | |
BEARZ | DEC3_2 | DEC | 5 | 2 | Processing time | ||
| 22 | |
RUEZT | DEC3_2 | DEC | 5 | 2 | Setup and teardown time | ||
| 23 | |
TRANZ | DEC3_2 | DEC | 5 | 2 | Interoperation time | ||
| 24 | |
WEBAZ | DEC3 | DEC | 3 | 0 | Goods receipt processing time in days | ||
| 25 | |
PLIFZ | DEC3 | DEC | 3 | 0 | Planned delivery time in days | ||
| 26 | |
DZEIT | DEC3 | DEC | 3 | 0 | In-house production time | ||
| 27 | |
WZEIT | DEC3 | DEC | 3 | 0 | Total replenishment lead time (in workdays) | ||
| 28 | |
SHFLG | SHFLG | CHAR | 1 | 0 | Safety time indicator (with or without safety time) | ||
| 29 | |
SHZET | NUMC2 | NUMC | 2 | 0 | Safety time (in workdays) | ||
| 30 | |
SHPRO | SHPRO | CHAR | 3 | 0 | Period profile for safety time | * | |
| 31 | |
QMATV | XFELD | CHAR | 1 | 0 | Inspection Setup Exists for Material/Plant | ||
| 32 | |
CUOBJ | CUOBJ | NUMC | 18 | 0 | Configuration (internal object number) | ||
| 33 | |
RESVP | RESVP | DEC | 3 | 0 | Period of adjustment for planned independent requirements | ||
| 34 | |
UMLME | MENG13V | QUAN | 13 | 3 | Stock in transfer (plant to plant) | ||
| 35 | |
EISBE | MENG13 | QUAN | 13 | 3 | Safety stock | ||
| 36 | |
DISLS | DISLS | CHAR | 2 | 0 | Lot size (materials planning) | * | |
| 37 | |
MRPPP | MRPPP | CHAR | 3 | 0 | PPC planning calendar | * | |
| 38 | |
FXHOR | FXHOR | NUMC | 3 | 0 | Planning time fence | ||
| 39 | |
DISMM | DISMM | CHAR | 2 | 0 | MRP Type | * | |
| 40 | |
DISVF | DISVF | CHAR | 1 | 0 | MRP procedure | ||
| 41 | |
BBBED | XFELD | CHAR | 1 | 0 | Material staging reqmts (subcontr. reqmts) MRP element BB | ||
| 42 | |
FXART | FXART | CHAR | 1 | 0 | Firming Type of the Planning Result | ||
| 43 | |
GRREL | XFELD | CHAR | 1 | 0 | Relevant for requirements grouping for project stock | ||
| 44 | |
RVPKZ | RVPKZ | CHAR | 1 | 0 | Adjustment of Planned Independent Requirements | ||
| 45 | |
MD_SCFLG | XFELD | CHAR | 1 | 0 | Indicator: General Subcontracting Logic | ||
| 46 | |
XFAN1 | XFELD | CHAR | 1 | 0 | Indicator: blocked stock available for planning | ||
| 47 | |
GTERM | XFELD | CHAR | 1 | 0 | Scheduling according to purchasing info record or agreement | ||
| 48 | |
REFWK | WERKS | CHAR | 4 | 0 | Reference plant | * | |
| 49 | |
NFVBC | XFELD | CHAR | 1 | 0 | Take restricted-use stock into account (only for batches) | ||
| 50 | |
KZUMB | XFLAG | CHAR | 1 | 0 | Indicator: stock in transfer available for planning | ||
| 51 | |
BZTEK | BZTEK | NUMC | 2 | 0 | Processing time required by purchasing department | ||
| 52 | |
FABKL | WFCID | CHAR | 2 | 0 | Factory calendar key | * | |
| 53 | |
KKOWK | KKOWK | CHAR | 1 | 0 | Indicator: Conditions at plant level | ||
| 54 | |
MENGU | XFELD | CHAR | 1 | 0 | Quantity Updating in Material Master Record | ||
| 55 | |
WERTU | XFELD | CHAR | 1 | 0 | Value Updating in Material Master Record | ||
| 56 | |
MFXDT | DATUM | DATS | 8 | 0 | Manual firming date | ||
| 57 | |
MFHKZ | XFELD | CHAR | 1 | 0 | Planning time fence set manually (MFXDT) | ||
| 58 | |
FIXTR | DATUM | DATS | 8 | 0 | End of planning time fence (date) | ||
| 59 | |
DISFG | XFELD | CHAR | 1 | 0 | Activate MRP areas at client level |
History
| Last changed by/on | SAP | 20130529 |
| SAP Release Created in | 616 |