SAP ABAP Data Element SHZET (Safety time (in workdays))
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
Basic Data
Data Element | SHZET |
Short Description | Safety time (in workdays) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | NUMC2 | |
Data Type | NUMC | Character string with only digits |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | SAFETYTIME | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | SafetyTime |
Medium | 15 | Safety time |
Long | 20 | Safety time/act.cov. |
Heading | 10 | SafetyTime |
Documentation
Definition
In this field, you define the number of workdays for the safety time/actual range of coverage.
If you define a safety time, the requirements in MRP are brought forward on the time axis by the number of workdays you define here.
This does not change the actual requirements dates. However, as the requirements have technically been brought forward, receipts are created for the earlier dates in MRP.
Dependencies
Time-phased materials planning is based on the interval between the MRP date and the availabilty date of the next MRP date. By using the safety time/ actual range of coverage, the number of days to the interval are included in the calculation.
History
Last changed by/on | SAP | 19991108 |
SAP Release Created in |