SAP ABAP Package MD03 (Appl. development R/3 MPS/determin. requirements planning)
Basic Data
Package | ![]() |
MD03 | |
Short Description | Appl. development R/3 MPS/determin. requirements planning | ||
Super package | ![]() |
CRM_APPLICATION | All CRM Components Without Special Structure Packages |
Main package indicator | Development Package | ||
Created on/by | ![]() |
00000000 | SAP |
Package Content
Table Name | Short Description | Table Category | Delivery Class |
---|---|---|---|
![]() |
Document log header | TRANSP | A |
![]() |
Document log item | TRANSP | A |
![]() |
Material Index MRP Area for Forecast | TRANSP | A |
![]() |
Planning File Entry, MRP Area, Long-Term Planning | TRANSP | A |
![]() |
Planning File Entry, MRP Area | TRANSP | A |
![]() |
Material Consumption for MRP Area | TRANSP | A |
![]() |
Blocking argument for MRP | TRANSP | L |
![]() |
Individual Customer Plng File Entry, MRP Area Long-Term Plng | TRANSP | A |
![]() |
Individual Customer Planning File Entry, MRP Area | TRANSP | A |
![]() |
Index customer order -> planned order | TRANSP | A |
![]() |
Individual Customer Planning File Entry, Long-Term Planning | TRANSP | A |
![]() |
Individual Customer Planning File Entry | TRANSP | A |
![]() |
User Settings for Graphic in MRP | TRANSP | A |
![]() |
Table with Range of Coverage Information | TRANSP | A |
![]() |
Mapping Table for External User for MRP Evaluations | TRANSP | C |
![]() |
Mapping Table for External User/Vendor with Default Setting | TRANSP | C |
![]() |
MRP firming date | TRANSP | A |
![]() |
Firming Data of MRP - MRP Area | TRANSP | A |
![]() |
Cluster Table BOMs Explosion (Shared Buffer) | TRANSP | A |
![]() |
Header Data for MRP Document | TRANSP | A |
![]() |
Customizing: MRP Area Storage Location | TRANSP | C |
![]() |
Customizing: MRP Area Subcontractor | TRANSP | C |
![]() |
Customizing MRP Area | TRANSP | C |
![]() |
Customizing: MRP Area Plants | TRANSP | C |
![]() |
MRP Area for Material | TRANSP | A |
![]() |
Multilevel Delay Calculated via Order Report | TRANSP | A |
![]() |
Intra-Material Parallelization: Affected Materials MOD | TRANSP | A |
![]() |
Simulative dependent requirements | TRANSP | A |
![]() |
Cluster Table Initial Screen SRList/MRP List (Shared Buffer) | TRANSP | A |
![]() |
Aggregated MRP table items | TRANSP | A |
![]() |
Key User Table for Parallel Import in MD07 | TRANSP | C |
![]() |
Conversion table for PKPS / please do not use | TRANSP | L |
![]() |
Long-term planning: Independent requirements versions | TRANSP | A |
![]() |
Long-term planning: Plants of planning scenario | TRANSP | A |
![]() |
Index of the production/delivery plant in the planned order | TRANSP | A |
![]() |
Planning scenarios in long-term planning | TRANSP | A |
![]() |
Index project -> planned order | TRANSP | A |
![]() |
Project number new key assignment (structure) | TRANSP | A |
![]() |
Header record for requirements total records in MRP | TRANSP | A |
![]() |
Item record for requirements total records in MRP | TRANSP | A |
![]() |
Changed revision levels (for creating MRP records RM61SR00) | TRANSP | A |
![]() |
BOM explosion number | TRANSP | A |
![]() |
New key assignment: BOM explosion no.->New BOM explosion no. | TRANSP | A |
![]() |
Range of coverage profile | TRANSP | C |
![]() |
PPplanning periods: header table | TRANSP | C |
![]() |
PP planning periods: long texts | TRANSP | C |
![]() |
PP planning periods: schedule lines (periods) | POOL | C |
![]() |
PP planning periods: calculation rule | POOL | C |
![]() |
Planning file entries for goods movements | TRANSP | C |
![]() |
Start times for MRP background programs | TRANSP | G |
![]() |
Control: activity reqmts transfer MRP/SOP -> CO | TRANSP | C |
![]() |
Control of sequence of the extended header in the MRP list | TRANSP | G |
![]() |
User Settings: Sort for Table | TRANSP | L |
![]() |
User-Setting For Field Sequence To Display A Table | TRANSP | L |
![]() |
User Parameters for Traffic Lights Settings in MD04/MD05 | TRANSP | S |
![]() |
User exit material selection - MRP | TRANSP | C |
![]() |
MPS evaluation: evaluation profile | POOL | E |
![]() |
MPS evaluation: hierarchy of MRP elements | POOL | E |
![]() |
MPS evaluations: long texts | POOL | E |
![]() |
MPS evaluation: user-specific layout | POOL | E |
![]() |
MPS evaluation: user-specific schedule lines | POOL | L |
![]() |
MPS evaluation: receipts/issues texts | POOL | E |
![]() |
Logical Destination for Parallel Processing | TRANSP | C |
![]() |
Evaluation Profile Ranges of Coverage | TRANSP | C |
![]() |
Texts for Minimum Range of Coverage Profile | TRANSP | C |
![]() |
Text Table for Extraction Mode | TRANSP | C |
![]() |
Action control | TRANSP | C |
![]() |
Action code text | TRANSP | E |
![]() |
Action code description | TRANSP | E |
![]() |
List layout and print parameters | TRANSP | C |
![]() |
User Settings for Flexible Transaction Calls | TRANSP | L |
![]() |
User Settings For Flexible Transaction Calls Per MRP Element | TRANSP | L |
![]() |
Default values for MRP | POOL | L |
Transaction Code | Short Description | Program |
---|---|---|
![]() |
MRP | ![]() |
![]() |
MRP - Single-item, Multi-level - | ![]() |
![]() |
Current Material Overview | ![]() |
![]() |
Reorg. MRP Lists | ![]() |
![]() |
Pegging | ![]() |
![]() |
Collective Requirements Display | ![]() |
![]() |
Firm Planned Orders | ![]() |
![]() |
Create Planning Calendar | ![]() |
![]() |
Change Planning Calendar | ![]() |
![]() |
Display Planning Calendar | ![]() |
![]() |
MPS | ![]() |
![]() |
MPS - Single-item, Multi-level - | ![]() |
![]() |
MPS - Single-item, Single-level - | ![]() |
![]() |
MPS - Single-item, Interactive - | ![]() |
![]() |
MPS Evaluation | ![]() |
![]() |
MRP List Evaluation | ![]() |
![]() |
Eval. MRP lists of MRP controller | ![]() |
![]() |
Product Group Planning Evaluation | ![]() |
![]() |
Cross-Plant Evaluation | ![]() |
![]() |
Multilevel Order Report | ![]() |
![]() |
Sales order planning | ![]() |
![]() |
Individual project planning | ![]() |
![]() |
Execute Action for Planned Order | ![]() |
![]() |
BAPI planned order processing | ![]() |
![]() |
MPS - total planning run | ![]() |
![]() |
Start of MD06 via Report | ![]() |
![]() |
Start MD07 by using report | ![]() |
![]() |
MRP Controller Workflow | |
![]() |
Evaluation Report RoCs Online | ![]() |
![]() |
Evaluation Report Ranges of Coverage | ![]() |
![]() |
MRP Data Extractor | ![]() |
![]() |
MPS | ![]() |
![]() |
Mail To Vendor | ![]() |
![]() |
Mail to Vendor | ![]() |
![]() |
Mail to Customer | ![]() |
![]() |
Mail to MRP Controller | ![]() |
![]() |
Workflow: Mail to MRP Controller | ![]() |
![]() |
Calculation of Multilevel Delay | ![]() |
![]() |
Display Serial Numbers | ![]() |
![]() |
Change BOM Explosion Numbers | ![]() |
![]() |
Maintain Project New Key Assignment | ![]() |
![]() |
Assign New Key to WBS Elements | ![]() |
![]() |
Long-term planning | ![]() |
![]() |
Long-Term Planning: Total Planning | ![]() |
![]() |
Long-term plng: single-itm, mult-lvl | ![]() |
![]() |
Long-term plng: singl-itm, singl-lvl | ![]() |
![]() |
Long-term planning: display MRP list | ![]() |
![]() |
Long-term plnng: collective MRP list | ![]() |
![]() |
Long-Term Plng: Material Overview | ![]() |
![]() |
Reorg.MRP Lists for Long-Term Plnng | ![]() |
![]() |
LTP: Create planned order | ![]() |
![]() |
LTP: Change planned order | ![]() |
![]() |
LTP: Display planned order | ![]() |
![]() |
Calculate Sim. Initial Stock | ![]() |
![]() |
Create planning scenario | ![]() |
![]() |
Change planning scenario | ![]() |
![]() |
Display planning scenario | ![]() |
![]() |
Flexible Evaluation Long-Term Plnng | ![]() |
![]() |
Evaluation LTP for Product Group | ![]() |
![]() |
Make-to-order planning (LTP) | ![]() |
![]() |
Project planning (LTP) | ![]() |
![]() |
LTP: set up plnng file entries BATCH | ![]() |
![]() |
LTP: delete plnng file entries BATCH | ![]() |
![]() |
Long-term plng:plng background job | ![]() |
![]() |
Start of MS06 via Report | ![]() |
![]() |
Start MS07 from Report | ![]() |
![]() |
LTP Evaluation Report RoC Online | ![]() |
![]() |
LTP Evaluation Report Coverages | ![]() |
![]() |
EKS Simulation: Material Selection | ![]() |
![]() |
LTP Data Extractor | ![]() |
![]() |
Print MRP List; Long-Term Planning | ![]() |
![]() |
MRP at client level | |
![]() |
MRP User Settings U444B | |
![]() |
Control of CO Integration | |
![]() |
MRP area | |
![]() |
List Profile Component List | ![]() |
![]() |
C M MRP Plant Parameters for MRP | ![]() |
![]() |
C M MRP MRP Group | ![]() |
![]() |
Collective availibility checkProfile | ![]() |
![]() |
IMG Activity: SIMG_CFMENUOPP1OM0K | ![]() |
![]() |
(empty) | ![]() |
![]() |
(empty) | ![]() |
![]() |
(empty) | ![]() |
![]() |
(empty) | ![]() |
![]() |
SAP Standard Variant | |
Hierarchy
Software Component | ![]() |
BBPCRM | BBPCRM |
SAP Release Created in | |||
Application Component | ![]() |
CRM (AEC0000003) | Customer Relationship Management |
Package | ![]() |
MD03 | Appl. development R/3 MPS/determin. requirements planning |