SAP ABAP Table U_25708 (Generated Table for View)
Basic Data
Table Category VIEW    General view structure 
General view structure U_25708   Table Relationship Diagram
Short Description Generated Table for View    
Delivery and Maintenance
Pool/cluster      
Delivery Class      
Data Browser/Table View Maintenance     Display/Maintenance Allowed with Restrictions 
Components
     
Field Key Data Element Domain Data
Type
Length Decimal
Places
Short Description Check
table
1 MANDT MANDT MANDT CLNT 3   0   Client T000
2 WERKS WERKS_D WERKS CHAR 4   0   Plant T001W
3 MTART DISGR DISGR CHAR 4   0   MRP Group  
4 BANER BANER BANER CHAR 1   0   Creation Indicator for Purchase Requisitions  
5 DISER DISER DISER CHAR 1   0   Creation Indicator for MRP Lists  
6 UMTHZ UMTHZ NUM03 NUMC 3   0   Rescheduling horizon  
7 FIXHZ FIXHZ NUM03 NUMC 3   0   Planning time fence  
8 PLAHZ PLAHZ NUM03 NUMC 3   0   Planning horizon  
9 SBDIS SBDIS NUM03 NUMC 3   0   Share of safety stock which can be used for planning  
10 LIFKZ LIFKZ LIFKZ CHAR 1   0   Automatic Schedule Lines (Scheduling Agreements)  
11 GTERM GTERM XFELD CHAR 1   0   Scheduling according to purchasing info record or agreement  
12 KZDRB KZDRB KZDRB CHAR 1   0   Indicator: direct procurement/production MRP  
13 XFAT1 XFAT1 XFELD CHAR 1   0   Firm Only Schedule Lines Transmitted to Vendor by Purchasing  
14 XFAT2 XFAT2 XFELD CHAR 1   0   Fant. 2  
15 VWVOR VWVOR NUM02 NUMC 2   0   Tolerance value for bringing forward receipt elements  
16 VWVER VWVER NUM02 NUMC 2   0   Tolerance value for displacement in the future  
17 PRREG PRREG PRREG CHAR 2   0   Checking rule for the availability check T441R
18 VRMOD VRMOD VRMOD CHAR 1   0   Consumption mode  
19 VINT1 VINT1 VRINT NUMC 3   0   Consumption period: backward  
20 VINT2 VINT2 VRINT NUMC 3   0   Consumption period: forward  
21 STRGR STRGR STRGR CHAR 2   0   Planning strategy group T461P
22 RESHZ RESHZ RESHZ DEC 2   0   Roll forward period for the master plan  
23 ANDIS ANDIS INT2 INT2 5   0   Number of Days After Which the Material Must Be Planned  
24 AUART AUFART AUFART CHAR 4   0   Order Type T003O
25 AUAR2 AUAR2 AUFART CHAR 4   0   Order type for process order T003O
26 PLSEL PLSEL PLSEL CHAR 1   0   Issue Storage Location Selection  
27 RVPKZ RVPKZ RVPKZ CHAR 1   0   Adjustment of Planned Independent Requirements  
28 RESVP RESVP RESVP DEC 3   0   Period of adjustment for planned independent requirements  
29 SHFLG SHFLG SHFLG CHAR 1   0   Safety time indicator (with or without safety time)  
30 SHZET SHZET NUMC2 NUMC 2   0   Safety time (in workdays)  
31 MDACH MDACH MDACH CHAR 2   0   Action control: planned order processing T46AC
32 PRASTA PRASTA PARAS CHAR 5   0   Period split T459S
33 EXSGT EXSGD EXSGD CHAR 1   0   Do not explode bulk material items  
34 BESAL BESAD BESAD CHAR 1   0   Determination of explosion date for BOM and routing  
35 SPRAS SPRAS SPRAS LANG 1   0   Language Key T002
36 TEXT40 TEXT40 TEXT40 CHAR 40   0   Text, 40 Characters Long  
Foreign Keys
Source Table Source Column Foreign Table Foreign Column Dependency Factor Cardinality left Cardinality right
1 U_25708 AUAR2 T003O AUART REF C CN
2 U_25708 AUART T003O AUART REF C CN
3 U_25708 MANDT T000 MANDT KEY 1 CN
4 U_25708 MDACH T46AC MDACH 1 CN
5 U_25708 PRASTA T459S PRASTA REF C CN
6 U_25708 PRREG T441R PRREG KEY 1 CN
7 U_25708 SPRAS T002 SPRAS KEY 1 CN
8 U_25708 STRGR T461P STRGR REF C CN
9 U_25708 WERKS T001W WERKS KEY 1 CN
History
Last changed by/on SAP  20130529 
SAP Release Created in