SAP ABAP Table U_25708 (Generated Table for View)
Basic Data
| Table Category | VIEW | General view structure |
| General view structure | U_25708 |
|
| Short Description | Generated Table for View |
Delivery and Maintenance
| Pool/cluster | ||
| Delivery Class | ||
| Data Browser/Table View Maintenance | Display/Maintenance Allowed with Restrictions |
Components
| |
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
|---|---|---|---|---|---|---|---|---|---|
| 1 | |
MANDT | MANDT | CLNT | 3 | 0 | Client | T000 | |
| 2 | |
WERKS_D | WERKS | CHAR | 4 | 0 | Plant | T001W | |
| 3 | |
DISGR | DISGR | CHAR | 4 | 0 | MRP Group | ||
| 4 | |
BANER | BANER | CHAR | 1 | 0 | Creation Indicator for Purchase Requisitions | ||
| 5 | |
DISER | DISER | CHAR | 1 | 0 | Creation Indicator for MRP Lists | ||
| 6 | |
UMTHZ | NUM03 | NUMC | 3 | 0 | Rescheduling horizon | ||
| 7 | |
FIXHZ | NUM03 | NUMC | 3 | 0 | Planning time fence | ||
| 8 | |
PLAHZ | NUM03 | NUMC | 3 | 0 | Planning horizon | ||
| 9 | |
SBDIS | NUM03 | NUMC | 3 | 0 | Share of safety stock which can be used for planning | ||
| 10 | |
LIFKZ | LIFKZ | CHAR | 1 | 0 | Automatic Schedule Lines (Scheduling Agreements) | ||
| 11 | |
GTERM | XFELD | CHAR | 1 | 0 | Scheduling according to purchasing info record or agreement | ||
| 12 | |
KZDRB | KZDRB | CHAR | 1 | 0 | Indicator: direct procurement/production MRP | ||
| 13 | |
XFAT1 | XFELD | CHAR | 1 | 0 | Firm Only Schedule Lines Transmitted to Vendor by Purchasing | ||
| 14 | |
XFAT2 | XFELD | CHAR | 1 | 0 | Fant. 2 | ||
| 15 | |
VWVOR | NUM02 | NUMC | 2 | 0 | Tolerance value for bringing forward receipt elements | ||
| 16 | |
VWVER | NUM02 | NUMC | 2 | 0 | Tolerance value for displacement in the future | ||
| 17 | |
PRREG | PRREG | CHAR | 2 | 0 | Checking rule for the availability check | T441R | |
| 18 | |
VRMOD | VRMOD | CHAR | 1 | 0 | Consumption mode | ||
| 19 | |
VINT1 | VRINT | NUMC | 3 | 0 | Consumption period: backward | ||
| 20 | |
VINT2 | VRINT | NUMC | 3 | 0 | Consumption period: forward | ||
| 21 | |
STRGR | STRGR | CHAR | 2 | 0 | Planning strategy group | T461P | |
| 22 | |
RESHZ | RESHZ | DEC | 2 | 0 | Roll forward period for the master plan | ||
| 23 | |
ANDIS | INT2 | INT2 | 5 | 0 | Number of Days After Which the Material Must Be Planned | ||
| 24 | |
AUFART | AUFART | CHAR | 4 | 0 | Order Type | T003O | |
| 25 | |
AUAR2 | AUFART | CHAR | 4 | 0 | Order type for process order | T003O | |
| 26 | |
PLSEL | PLSEL | CHAR | 1 | 0 | Issue Storage Location Selection | ||
| 27 | |
RVPKZ | RVPKZ | CHAR | 1 | 0 | Adjustment of Planned Independent Requirements | ||
| 28 | |
RESVP | RESVP | DEC | 3 | 0 | Period of adjustment for planned independent requirements | ||
| 29 | |
SHFLG | SHFLG | CHAR | 1 | 0 | Safety time indicator (with or without safety time) | ||
| 30 | |
SHZET | NUMC2 | NUMC | 2 | 0 | Safety time (in workdays) | ||
| 31 | |
MDACH | MDACH | CHAR | 2 | 0 | Action control: planned order processing | T46AC | |
| 32 | |
PRASTA | PARAS | CHAR | 5 | 0 | Period split | T459S | |
| 33 | |
EXSGD | EXSGD | CHAR | 1 | 0 | Do not explode bulk material items | ||
| 34 | |
BESAD | BESAD | CHAR | 1 | 0 | Determination of explosion date for BOM and routing | ||
| 35 | |
SPRAS | SPRAS | LANG | 1 | 0 | Language Key | T002 | |
| 36 | |
TEXT40 | TEXT40 | CHAR | 40 | 0 | Text, 40 Characters Long |
Foreign Keys
| |
Source Table | Source Column | Foreign Table | Foreign Column | Dependency Factor | Cardinality left | Cardinality right |
|---|---|---|---|---|---|---|---|
| 1 | U_25708 | AUAR2 | |
|
REF | C | CN |
| 2 | U_25708 | AUART | |
|
REF | C | CN |
| 3 | U_25708 | MANDT | |
|
KEY | 1 | CN |
| 4 | U_25708 | MDACH | |
|
1 | CN | |
| 5 | U_25708 | PRASTA | |
|
REF | C | CN |
| 6 | U_25708 | PRREG | |
|
KEY | 1 | CN |
| 7 | U_25708 | SPRAS | |
|
KEY | 1 | CN |
| 8 | U_25708 | STRGR | |
|
REF | C | CN |
| 9 | U_25708 | WERKS | |
|
KEY | 1 | CN |
History
| Last changed by/on | SAP | 20130529 |
| SAP Release Created in |