Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
Basic Data
Data Element | MDACH |
Short Description | Action control: planned order processing |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | MDACH | |
Data Type | CHAR | Character String |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table | T46AC |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | PLORD_CTRL | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | ActionCtrl |
Medium | 15 | Action control |
Long | 20 | Action control |
Heading | 2 | AC |
Documentation
Definition
This key is used for the function "Actions in the planned order" and defines the sequence of the actions that can be carried out for the planned order.
Use
Using the function, "actions in the planned order", an interface is provided to external assembly control systems. Thus, work progress on the assembly line as well as activities independent of the assembly line can be transferred to the SAP System via a standard interface or a customized interface.
Using this function, one or more actions can be carried out for a large number of planned orders in one step that, if carried out online, could only be carried out individually per planned order. Moreover, it is possible to carry out customer-specific actions. In Customizing for MRP, you use the action control to define which actions are allowed and the sequence in which they are to be carried out.
An action may be, for example;
- explode BOM
- check material availability
- schedule planned order, and so on...
History
Last changed by/on | SAP | 19991108 |
SAP Release Created in |