SAP ABAP Data Element BERTY (Type of MRP area)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
Basic Data
Data Element | BERTY |
Short Description | Type of MRP area |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | BERTY | |
Data Type | NUMC | Character string with only digits |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | MRPa. type |
Medium | 15 | MRP area type |
Long | 20 | MRP area type |
Heading | 10 | MRPa. type |
Documentation
Definition
The key defines whether the MRP area corresponds to a whole plant or to a storage location or to a subcontractor.
Example
You want to specifically plan the components that are required on a particular assembly line. You therefore define an MRP area of the storage location type and assign the production storage location to it, from which you are taking the components that are required on the assembly line.
Dependencies
- The MRP area of the type plant contains a whole plant. The system automatically creates the plant MRP area when converting the planning file entries.
- The MRP area of the type storage location can contain one or several storage locations. You assign the storage location to the MRP area in the storage location field
A storage location can, however, only be assigned to one MRP area.
- With the subcontractor type the MRP area contains just one subcontractor/vendor. This enables you to specifically plan the components to be provided for this subcontractor. You assign the subcontractor in the subcontractor field.
A subcontractor, however, may only ever be assigned to one MRP area.
History
Last changed by/on | SAP | 19980505 |
SAP Release Created in |