SAP ABAP Data Element DISFG (Activate MRP areas at client level)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
Basic Data
Data Element DISFG
Short Description Activate MRP areas at client level  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 MRPa. act. 
Medium 15 MRP area active 
Long 20 MRP area active 
Heading 50 Activate MRP area at client level 
Documentation

Definition

The indicator activates material requirements planning for MRP areas at client level.

Use

If the indicator is set and the MRP areas have been defined in Customizing, material requirements planning is carried out for MRP areas that have been defined in Customizing and that have been assigned storage locations or subcontractors. Subcontractors/vendors remain in the plant MRP area, whose number is identical to the plant number. Material requirements planning is also carried out separately for this MRP area.

Additionally, the availability check is no longer carried out at plant level. It is carried out separately for each MRP area, if MRP areas have been assigned to the material in the material master record. You can assign MRP areas to materials by creating an MRP area segment in the material master.

The field MRP area is also offered for selection in the applications material requirements planning and production planning.

Dependencies

To be able to activate material requirements planning for MRP areas, you must have converted the existing planning file entires at plant level to planning file entries at MRP area level. To convert the report, you use a report that you start in work step xxxxxxxxxxx.

History
Last changed by/on SAP  19980505 
SAP Release Created in