SAP ABAP Table PPH_FIN_OUT_MAT_BERID_CTRL_2 (output)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PP-MRP (Application Component) Material Requirements Planning
     PPH_ACCESS_HANA (Package) PP on HANA: Access to HANA objects
Basic Data
Table Category INTTAB    Structure 
Structure PPH_FIN_OUT_MAT_BERID_CTRL_2   Table Relationship Diagram
Short Description output    
Delivery and Maintenance
Pool/cluster      
Delivery Class      
Data Browser/Table View Maintenance     Display/Maintenance Allowed with Restrictions 
Components
     
Field Key Data Element Domain Data
Type
Length Decimal
Places
Short Description Check
table
1 MATNR MATNR MATNR CHAR 18   0   Material Number *
2 WERKS WERKS_D WERKS CHAR 4   0   Plant *
3 BERID BERID BERID CHAR 10   0   MRP Area *
4 BERTY BERTY BERTY NUMC 2   0   Type of MRP area  
5 SATNR SATNR MATNR CHAR 18   0   Cross-Plant Configurable Material *
6 ATTYP ATTYP ATTYP CHAR 2   0   Material Category  
7 MEINS MEINS MEINS UNIT 3   0   Base Unit of Measure *
8 ANDEC     DEC 5   0    
9 BESKZ BESKZ BESKZ CHAR 1   0   Procurement Type  
10 KZAUS KZAUS KZAUS CHAR 1   0   Discontinuation indicator  
11 AUSDT AUSDT DATUM DATS 8   0   Effective-out date  
12 DISGR DISGR DISGR CHAR 4   0   MRP Group *
13 MISKZ MISKZ MISKZ CHAR 1   0   Mixed MRP indicator  
14 AHDIS AHDIS AHDIS CHAR 1   0   MRP relevancy for dependent requirements  
15 VRMOD VRMOD VRMOD CHAR 1   0   Consumption mode  
16 VINT1 VINT1 VRINT NUMC 3   0   Consumption period: backward  
17 VINT2 VINT2 VRINT NUMC 3   0   Consumption period: forward  
18 STDPD STDPD MATNR CHAR 18   0   Configurable material *
19 CUOBV CUOBV CUOBJ NUMC 18   0   Internal object number of configurable material for planning  
20 BEARZ BEARZ DEC3_2 DEC 5   2   Processing time  
21 RUEZT RUEZT DEC3_2 DEC 5   2   Setup and teardown time  
22 TRANZ TRANZ DEC3_2 DEC 5   2   Interoperation time  
23 WEBAZ WEBAZ DEC3 DEC 3   0   Goods receipt processing time in days  
24 PLIFZ PLIFZ DEC3 DEC 3   0   Planned delivery time in days  
25 DZEIT DZEIT DEC3 DEC 3   0   In-house production time  
26 WZEIT WZEIT DEC3 DEC 3   0   Total replenishment lead time (in workdays)  
27 SHFLG SHFLG SHFLG CHAR 1   0   Safety time indicator (with or without safety time)  
28 SHZET SHZET NUMC2 NUMC 2   0   Safety time (in workdays)  
29 SHPRO SHPRO SHPRO CHAR 3   0   Period profile for safety time *
30 QMATV QMATV XFELD CHAR 1   0   Inspection Setup Exists for Material/Plant  
31 CUOBJ CUOBJ CUOBJ NUMC 18   0   Configuration (internal object number)  
32 RESVP RESVP RESVP DEC 3   0   Period of adjustment for planned independent requirements  
33 UMLMC UMLME MENG13V QUAN 13   3   Stock in transfer (plant to plant)  
34 EISBE EISBE MENG13 QUAN 13   3   Safety stock  
35 DISLS DISLS DISLS CHAR 2   0   Lot size (materials planning) *
36 MRPPP MRPPP MRPPP CHAR 3   0   PPC planning calendar *
37 FXHOR     DEC 3   0    
38 DISMM DISMM DISMM CHAR 2   0   MRP Type *
39 PERKZ PERKZ PERKZ CHAR 1   0   Period indicator  
40 DISVF DISVF DISVF CHAR 1   0   MRP procedure  
41 BBBED BBBED XFELD CHAR 1   0   Material staging reqmts (subcontr. reqmts) MRP element BB  
42 FXART FXART FXART CHAR 1   0   Firming Type of the Planning Result  
43 PROOS PROOS PROOS CHAR 1   0   MRP indicator of forecast  
44 PRRED PRRED PRPED CHAR 1   0   Reduce forecast requirements  
45 RYBED RYBED XFELD CHAR 1   0   Time-phased planning with requirements (MRP)  
46 GRREL GRREL XFELD CHAR 1   0   Relevant for requirements grouping for project stock  
47 RVPKZ RVPKZ RVPKZ CHAR 1   0   Adjustment of Planned Independent Requirements  
48 SCFLG FLAG FLAG CHAR 1   0   General Flag  
49 XFAN1 XFAN1 XFELD CHAR 1   0   Indicator: blocked stock available for planning  
50 GTERM GTERM XFELD CHAR 1   0   Scheduling according to purchasing info record or agreement  
51 REFWK REFWK WERKS CHAR 4   0   Reference plant *
52 NFVBC NFVBC XFELD CHAR 1   0   Take restricted-use stock into account (only for batches)  
53 KZUMB KZUMB XFLAG CHAR 1   0   Indicator: stock in transfer available for planning  
54 BZTEK     DEC 3   0    
55 FABKL FABKL WFCID CHAR 2   0   Factory calendar key *
56 KKOWK KKOWK KKOWK CHAR 1   0   Indicator: Conditions at plant level  
57 MENGU MENGU XFELD CHAR 1   0   Quantity Updating in Material Master Record  
58 WERTU WERTU XFELD CHAR 1   0   Value Updating in Material Master Record  
59 MFXDT MFXDT DATUM DATS 8   0   Manual firming date  
60 MFHKZ MFHKZ XFELD CHAR 1   0   Planning time fence set manually (MFXDT)  
61 FIXTR FIXTR DATUM DATS 8   0   End of planning time fence (date)  
62 DISFG DISFG XFELD CHAR 1   0   Activate MRP areas at client level  
History
Last changed by/on SAP  20130529 
SAP Release Created in 616