SAP ABAP Table PPH_FIN_OUT_MAT_BERID_CTRL_2 (output)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PP-MRP (Application Component) Material Requirements Planning
⤷
PPH_ACCESS_HANA (Package) PP on HANA: Access to HANA objects

⤷

⤷

Basic Data
Table Category | INTTAB | Structure |
Structure | PPH_FIN_OUT_MAT_BERID_CTRL_2 |
![]() |
Short Description | output |
Delivery and Maintenance
Pool/cluster | ||
Delivery Class | ||
Data Browser/Table View Maintenance | Display/Maintenance Allowed with Restrictions |
Components
![]() |
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
---|---|---|---|---|---|---|---|---|---|
1 | ![]() |
MATNR | MATNR | CHAR | 18 | 0 | Material Number | * | |
2 | ![]() |
WERKS_D | WERKS | CHAR | 4 | 0 | Plant | * | |
3 | ![]() |
BERID | BERID | CHAR | 10 | 0 | MRP Area | * | |
4 | ![]() |
BERTY | BERTY | NUMC | 2 | 0 | Type of MRP area | ||
5 | ![]() |
SATNR | MATNR | CHAR | 18 | 0 | Cross-Plant Configurable Material | * | |
6 | ![]() |
ATTYP | ATTYP | CHAR | 2 | 0 | Material Category | ||
7 | ![]() |
MEINS | MEINS | UNIT | 3 | 0 | Base Unit of Measure | * | |
8 | ![]() |
DEC | 5 | 0 | |||||
9 | ![]() |
BESKZ | BESKZ | CHAR | 1 | 0 | Procurement Type | ||
10 | ![]() |
KZAUS | KZAUS | CHAR | 1 | 0 | Discontinuation indicator | ||
11 | ![]() |
AUSDT | DATUM | DATS | 8 | 0 | Effective-out date | ||
12 | ![]() |
DISGR | DISGR | CHAR | 4 | 0 | MRP Group | * | |
13 | ![]() |
MISKZ | MISKZ | CHAR | 1 | 0 | Mixed MRP indicator | ||
14 | ![]() |
AHDIS | AHDIS | CHAR | 1 | 0 | MRP relevancy for dependent requirements | ||
15 | ![]() |
VRMOD | VRMOD | CHAR | 1 | 0 | Consumption mode | ||
16 | ![]() |
VINT1 | VRINT | NUMC | 3 | 0 | Consumption period: backward | ||
17 | ![]() |
VINT2 | VRINT | NUMC | 3 | 0 | Consumption period: forward | ||
18 | ![]() |
STDPD | MATNR | CHAR | 18 | 0 | Configurable material | * | |
19 | ![]() |
CUOBV | CUOBJ | NUMC | 18 | 0 | Internal object number of configurable material for planning | ||
20 | ![]() |
BEARZ | DEC3_2 | DEC | 5 | 2 | Processing time | ||
21 | ![]() |
RUEZT | DEC3_2 | DEC | 5 | 2 | Setup and teardown time | ||
22 | ![]() |
TRANZ | DEC3_2 | DEC | 5 | 2 | Interoperation time | ||
23 | ![]() |
WEBAZ | DEC3 | DEC | 3 | 0 | Goods receipt processing time in days | ||
24 | ![]() |
PLIFZ | DEC3 | DEC | 3 | 0 | Planned delivery time in days | ||
25 | ![]() |
DZEIT | DEC3 | DEC | 3 | 0 | In-house production time | ||
26 | ![]() |
WZEIT | DEC3 | DEC | 3 | 0 | Total replenishment lead time (in workdays) | ||
27 | ![]() |
SHFLG | SHFLG | CHAR | 1 | 0 | Safety time indicator (with or without safety time) | ||
28 | ![]() |
SHZET | NUMC2 | NUMC | 2 | 0 | Safety time (in workdays) | ||
29 | ![]() |
SHPRO | SHPRO | CHAR | 3 | 0 | Period profile for safety time | * | |
30 | ![]() |
QMATV | XFELD | CHAR | 1 | 0 | Inspection Setup Exists for Material/Plant | ||
31 | ![]() |
CUOBJ | CUOBJ | NUMC | 18 | 0 | Configuration (internal object number) | ||
32 | ![]() |
RESVP | RESVP | DEC | 3 | 0 | Period of adjustment for planned independent requirements | ||
33 | ![]() |
UMLME | MENG13V | QUAN | 13 | 3 | Stock in transfer (plant to plant) | ||
34 | ![]() |
EISBE | MENG13 | QUAN | 13 | 3 | Safety stock | ||
35 | ![]() |
DISLS | DISLS | CHAR | 2 | 0 | Lot size (materials planning) | * | |
36 | ![]() |
MRPPP | MRPPP | CHAR | 3 | 0 | PPC planning calendar | * | |
37 | ![]() |
DEC | 3 | 0 | |||||
38 | ![]() |
DISMM | DISMM | CHAR | 2 | 0 | MRP Type | * | |
39 | ![]() |
PERKZ | PERKZ | CHAR | 1 | 0 | Period indicator | ||
40 | ![]() |
DISVF | DISVF | CHAR | 1 | 0 | MRP procedure | ||
41 | ![]() |
BBBED | XFELD | CHAR | 1 | 0 | Material staging reqmts (subcontr. reqmts) MRP element BB | ||
42 | ![]() |
FXART | FXART | CHAR | 1 | 0 | Firming Type of the Planning Result | ||
43 | ![]() |
PROOS | PROOS | CHAR | 1 | 0 | MRP indicator of forecast | ||
44 | ![]() |
PRRED | PRPED | CHAR | 1 | 0 | Reduce forecast requirements | ||
45 | ![]() |
RYBED | XFELD | CHAR | 1 | 0 | Time-phased planning with requirements (MRP) | ||
46 | ![]() |
GRREL | XFELD | CHAR | 1 | 0 | Relevant for requirements grouping for project stock | ||
47 | ![]() |
RVPKZ | RVPKZ | CHAR | 1 | 0 | Adjustment of Planned Independent Requirements | ||
48 | ![]() |
FLAG | FLAG | CHAR | 1 | 0 | General Flag | ||
49 | ![]() |
XFAN1 | XFELD | CHAR | 1 | 0 | Indicator: blocked stock available for planning | ||
50 | ![]() |
GTERM | XFELD | CHAR | 1 | 0 | Scheduling according to purchasing info record or agreement | ||
51 | ![]() |
REFWK | WERKS | CHAR | 4 | 0 | Reference plant | * | |
52 | ![]() |
NFVBC | XFELD | CHAR | 1 | 0 | Take restricted-use stock into account (only for batches) | ||
53 | ![]() |
KZUMB | XFLAG | CHAR | 1 | 0 | Indicator: stock in transfer available for planning | ||
54 | ![]() |
DEC | 3 | 0 | |||||
55 | ![]() |
FABKL | WFCID | CHAR | 2 | 0 | Factory calendar key | * | |
56 | ![]() |
KKOWK | KKOWK | CHAR | 1 | 0 | Indicator: Conditions at plant level | ||
57 | ![]() |
MENGU | XFELD | CHAR | 1 | 0 | Quantity Updating in Material Master Record | ||
58 | ![]() |
WERTU | XFELD | CHAR | 1 | 0 | Value Updating in Material Master Record | ||
59 | ![]() |
MFXDT | DATUM | DATS | 8 | 0 | Manual firming date | ||
60 | ![]() |
MFHKZ | XFELD | CHAR | 1 | 0 | Planning time fence set manually (MFXDT) | ||
61 | ![]() |
FIXTR | DATUM | DATS | 8 | 0 | End of planning time fence (date) | ||
62 | ![]() |
DISFG | XFELD | CHAR | 1 | 0 | Activate MRP areas at client level |
History
Last changed by/on | SAP | 20130529 |
SAP Release Created in | 616 |