Data Element list used by SAP ABAP Table PPH_FIN_OUT_MAT_BERID_CTRL_2 (output)
SAP ABAP Table PPH_FIN_OUT_MAT_BERID_CTRL_2 (output) is using
# Object Type Object Name Object Description Note
     
1 Data Element  AHDIS MRP relevancy for dependent requirements
2 Data Element  ATTYP Material Category
3 Data Element  AUSDT Effective-out date
4 Data Element  BBBED Material staging reqmts (subcontr. reqmts) MRP element BB
5 Data Element  BEARZ Processing time
6 Data Element  BERID MRP Area
7 Data Element  BERTY Type of MRP area
8 Data Element  BESKZ Procurement Type
9 Data Element  CUOBJ Configuration (internal object number)
10 Data Element  CUOBV Internal object number of configurable material for planning
11 Data Element  DISFG Activate MRP areas at client level
12 Data Element  DISGR MRP Group
13 Data Element  DISLS Lot size (materials planning)
14 Data Element  DISMM MRP Type
15 Data Element  DISVF MRP procedure
16 Data Element  DZEIT In-house production time
17 Data Element  EISBE Safety stock
18 Data Element  FABKL Factory calendar key
19 Data Element  FIXTR End of planning time fence (date)
20 Data Element  FLAG General Flag
21 Data Element  FXART Firming Type of the Planning Result
22 Data Element  GRREL Relevant for requirements grouping for project stock
23 Data Element  GTERM Scheduling according to purchasing info record or agreement
24 Data Element  KKOWK Indicator: Conditions at plant level
25 Data Element  KZAUS Discontinuation indicator
26 Data Element  KZUMB Indicator: stock in transfer available for planning
27 Data Element  MATNR Material Number
28 Data Element  MEINS Base Unit of Measure
29 Data Element  MENGU Quantity Updating in Material Master Record
30 Data Element  MFHKZ Planning time fence set manually (MFXDT)
31 Data Element  MFXDT Manual firming date
32 Data Element  MISKZ Mixed MRP indicator
33 Data Element  MRPPP PPC planning calendar
34 Data Element  NFVBC Take restricted-use stock into account (only for batches)
35 Data Element  PERKZ Period indicator
36 Data Element  PLIFZ Planned delivery time in days
37 Data Element  PROOS MRP indicator of forecast
38 Data Element  PRRED Reduce forecast requirements
39 Data Element  QMATV Inspection Setup Exists for Material/Plant
40 Data Element  REFWK Reference plant
41 Data Element  RESVP Period of adjustment for planned independent requirements
42 Data Element  RUEZT Setup and teardown time
43 Data Element  RVPKZ Adjustment of Planned Independent Requirements
44 Data Element  RYBED Time-phased planning with requirements (MRP)
45 Data Element  SATNR Cross-Plant Configurable Material
46 Data Element  SHFLG Safety time indicator (with or without safety time)
47 Data Element  SHPRO Period profile for safety time
48 Data Element  SHZET Safety time (in workdays)
49 Data Element  STDPD Configurable material
50 Data Element  TRANZ Interoperation time
51 Data Element  UMLME Stock in transfer (plant to plant)
52 Data Element  VINT1 Consumption period: backward
53 Data Element  VINT2 Consumption period: forward
54 Data Element  VRMOD Consumption mode
55 Data Element  WEBAZ Goods receipt processing time in days
56 Data Element  WERKS_D Plant
57 Data Element  WERTU Value Updating in Material Master Record
58 Data Element  WZEIT Total replenishment lead time (in workdays)
59 Data Element  XFAN1 Indicator: blocked stock available for planning