SAP ABAP Data Element RYBED (Time-phased planning with requirements (MRP))
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
⤷
⤷
⤷
Basic Data
| Data Element | RYBED |
| Short Description | Time-phased planning with requirements (MRP) |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | XFELD | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | TPL_W_REQ | |
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | TPl.w.reqs |
| Medium | 16 | Tm-phased w.reqs |
| Long | 20 | Time-phased w. reqs |
| Heading | 0 |
Documentation
Definition
If you select this indicator, all the requirement elements are included in the net requirements calculation for time-phased planning that are included in this calculation for MRP.
Note
If this indicator is selected, forecast requirements are only included if the Forecast MRP ind. is set so that forecast values are either included in the calculation as unplanned requirements or as total requirements.
History
| Last changed by/on | SAP | 20040223 |
| SAP Release Created in |