SAP ABAP Table BAPI_MRP_CONTROL_PARAM (MRP: Control Parameters for Material)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
MD03 (Package) Appl. development R/3 MPS/determin. requirements planning

⤷

⤷

⤷

Basic Data
Table Category | INTTAB | Structure |
Structure | BAPI_MRP_CONTROL_PARAM |
![]() |
Short Description | MRP: Control Parameters for Material |
Delivery and Maintenance
Pool/cluster | ||
Delivery Class | ||
Data Browser/Table View Maintenance | Display/Maintenance Allowed with Restrictions |
Components
![]() |
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
---|---|---|---|---|---|---|---|---|---|
1 | ![]() |
BANER | BANER | CHAR | 1 | 0 | Creation Indicator for Purchase Requisitions | ||
2 | ![]() |
LIFKZ | LIFKZ | CHAR | 1 | 0 | Automatic Schedule Lines (Scheduling Agreements) | ||
3 | ![]() |
DISER | DISER | CHAR | 1 | 0 | Creation Indicator for MRP Lists | ||
4 | ![]() |
WERTU | XFELD | CHAR | 1 | 0 | Value Updating in Material Master Record | ||
5 | ![]() |
MENGU | XFELD | CHAR | 1 | 0 | Quantity Updating in Material Master Record | ||
6 | ![]() |
ANDEC | ANDEC | INT2 | 5 | 0 | No. of decimal places to which rounding should be performed | ||
7 | ![]() |
USEQU | USEQU | CHAR | 1 | 0 | Quota arrangement usage | * | |
8 | ![]() |
SBDIS | NUM03 | NUMC | 3 | 0 | Share of safety stock which can be used for planning | ||
9 | ![]() |
ICBED | ICBED | CHAR | 1 | 0 | Reorder point planning with external requirements | ||
10 | ![]() |
FXART | FXART | CHAR | 1 | 0 | Firming Type of the Planning Result | ||
11 | ![]() |
FXHOR | FXHOR | NUMC | 3 | 0 | Planning time fence | ||
12 | ![]() |
FIXTR | DATUM | DATS | 8 | 0 | End of planning time fence (date) | ||
13 | ![]() |
MFHKZ | XFELD | CHAR | 1 | 0 | Planning time fence set manually (MFXDT) | ||
14 | ![]() |
RESPL | RESPL | CHAR | 1 | 0 | Indicator: delete firm planned orders | ||
15 | ![]() |
RESHZ | RESHZ | DEC | 2 | 0 | Roll forward period for the master plan | ||
16 | ![]() |
RSTER | DATUM | DATS | 8 | 0 | End of roll forward period | ||
17 | ![]() |
UMTHZ | NUM03 | NUMC | 3 | 0 | Rescheduling horizon | ||
18 | ![]() |
UMTER | DATUM | DATS | 8 | 0 | End of rescheduling horizon (date) | ||
19 | ![]() |
VWVOR | NUM02 | NUMC | 2 | 0 | Tolerance value for bringing forward receipt elements | ||
20 | ![]() |
VWVER | NUM02 | NUMC | 2 | 0 | Tolerance value for displacement in the future | ||
21 | ![]() |
PLAHZ | NUM03 | NUMC | 3 | 0 | Planning horizon | ||
22 | ![]() |
PLTER | DATUM | DATS | 8 | 0 | End of planning horizon | ||
23 | ![]() |
WZTER | DATUM | DATS | 8 | 0 | End of replenishment lead time | ||
24 | ![]() |
KZREG | XFELD | CHAR | 1 | 0 | Indicator: plan material regularly | ||
25 | ![]() |
ANDIS | INT2 | INT2 | 5 | 0 | Number of Days After Which the Material Must Be Planned | ||
26 | ![]() |
RHDAT | DATUM | DATS | 8 | 0 | Next planning date for time-phased planning | ||
27 | ![]() |
RHEND | DATUM | DATS | 8 | 0 | End of the requirements period for time-phased MRP | ||
28 | ![]() |
RYBED | XFELD | CHAR | 1 | 0 | Time-phased planning with requirements (MRP) | ||
29 | ![]() |
VRMOD | VRMOD | CHAR | 1 | 0 | Consumption mode | ||
30 | ![]() |
VINT1 | VRINT | NUMC | 3 | 0 | Consumption period: backward | ||
31 | ![]() |
VINT2 | VRINT | NUMC | 3 | 0 | Consumption period: forward | ||
32 | ![]() |
CHAR1 | CHAR1 | CHAR | 1 | 0 | Single-Character Flag | ||
33 | ![]() |
CHAR1 | CHAR1 | CHAR | 1 | 0 | Single-Character Flag | ||
34 | ![]() |
XVPLB | XFELD | CHAR | 1 | 0 | Planning Variant | ||
35 | ![]() |
STDPD | MATNR | CHAR | 18 | 0 | Configurable material | * | |
36 | ![]() |
RVPKZ | RVPKZ | CHAR | 1 | 0 | Adjustment of Planned Independent Requirements | ||
37 | ![]() |
RESVP | RESVP | DEC | 3 | 0 | Period of adjustment for planned independent requirements | ||
38 | ![]() |
RVPTR | DATUM | DATS | 8 | 0 | End of adjustment period for planned independent reqmts | ||
39 | ![]() |
EXSGT | XFLAG | CHAR | 1 | 0 | Do Not Explode Bulk Material Items | ||
40 | ![]() |
BESAL | BESAL | CHAR | 1 | 0 | Determine Explosion Date for BOM and Routing | ||
41 | ![]() |
GTERM | XFELD | CHAR | 1 | 0 | Scheduling according to purchasing info record or agreement | ||
42 | ![]() |
KZDRB | KZDRB | CHAR | 1 | 0 | Indicator: direct procurement/production MRP | ||
43 | ![]() |
CHAR1 | CHAR1 | CHAR | 1 | 0 | Single-Character Flag | ||
44 | ![]() |
PLNKZ | PLNKZ | CHAR | 1 | 0 | Planning Indicator | ||
45 | ![]() |
OSELT | DATUM | DATS | 8 | 0 | Above selection date | ||
46 | ![]() |
PRREG | PRREG | CHAR | 2 | 0 | Checking rule for the availability check | * | |
47 | ![]() |
SUMAU | SUMBD | CHAR | 1 | 0 | Total sales order requirements | ||
48 | ![]() |
RWFLG | XFELD | CHAR | 1 | 0 | Calculate safety stock based on range of coverage | ||
49 | ![]() |
RWPER | RWPER | CHAR | 1 | 0 | Period for Calculating the Dynamic Safety Stock | ||
50 | ![]() |
RWANZ | NUMC2 | NUMC | 2 | 0 | Number of periods for determining the average | ||
51 | ![]() |
RWART | RWART | CHAR | 1 | 0 | Period length type for calculating the average | ||
52 | ![]() |
RWNTG | NUMC2 | NUMC | 2 | 0 | Number of days per range of coverage period | ||
53 | ![]() |
RW1TG | RWTAG | NUMC | 2 | 0 | Target Range of Coverage in Period 01 | ||
54 | ![]() |
RW1DT | DATUM | DATS | 8 | 0 | Planning horizon for range of coverage 01 | ||
55 | ![]() |
RW2TG | RWTAG | NUMC | 2 | 0 | Target Range of Coverage in Period 02 | ||
56 | ![]() |
RW2DT | DATUM | DATS | 8 | 0 | Planning horizon for range of coverage 02 | ||
57 | ![]() |
RW3TG | RWTAG | NUMC | 2 | 0 | Target Range of Coverage in the Rest of the Period | ||
58 | ![]() |
RW1TG | RWTAG | NUMC | 2 | 0 | Target Range of Coverage in Period 01 | ||
59 | ![]() |
RW1TG | RWTAG | NUMC | 2 | 0 | Target Range of Coverage in Period 01 | ||
60 | ![]() |
RW1TG | RWTAG | NUMC | 2 | 0 | Target Range of Coverage in Period 01 | ||
61 | ![]() |
RW1TG | RWTAG | NUMC | 2 | 0 | Target Range of Coverage in Period 01 | ||
62 | ![]() |
RW1TG | RWTAG | NUMC | 2 | 0 | Target Range of Coverage in Period 01 | ||
63 | ![]() |
RW1TG | RWTAG | NUMC | 2 | 0 | Target Range of Coverage in Period 01 | ||
64 | ![]() |
XFAT1 | XFELD | CHAR | 1 | 0 | Firm Only Schedule Lines Transmitted to Vendor by Purchasing | ||
65 | ![]() |
PLIFZ | DEC3 | DEC | 3 | 0 | Planned delivery time in days | ||
66 | ![]() |
KZBED | KZBED | CHAR | 1 | 0 | Indicator for Requirements Grouping | ||
67 | ![]() |
PLSEL | PLSEL | CHAR | 1 | 0 | Issue Storage Location Selection | ||
68 | ![]() |
BBSRT_NB | BSART | CHAR | 4 | 0 | MRP:doc.type purchase requisitions for standard purchase ord | * | |
69 | ![]() |
BBSRT_LB | BSART | CHAR | 4 | 0 | MRP: Document type purchase requisition for subcontracting | * | |
70 | ![]() |
BBSRT_UL | BSART | CHAR | 4 | 0 | MRP: purchase requisition for stock transfer - document type | * | |
71 | ![]() |
AGRES | AGREQ | CHAR | 1 | 0 | Aggregated dependent requirements | ||
72 | ![]() |
OPFDT | DATUM | DATS | 8 | 0 | Date of firm planned order last copied from MRP | ||
73 | ![]() |
MFXDT | DATUM | DATS | 8 | 0 | Manual firming date | ||
74 | ![]() |
MFNAM | UNAME | CHAR | 12 | 0 | Set manual firming date: User | ||
75 | ![]() |
MFDAT | DATUM | DATS | 8 | 0 | Set manual firming date: Date to set | ||
76 | ![]() |
MFXKZ | XFELD | CHAR | 1 | 0 | Indicator: MFXDT changed | ||
77 | ![]() |
OPFKZ | XFELD | CHAR | 1 | 0 | Indicator:OPFDT changed | ||
78 | ![]() |
NODUM | XFELD | CHAR | 1 | 0 | No requirements for phantom assembly | ||
79 | ![]() |
BBBED | XFELD | CHAR | 1 | 0 | Material staging reqmts (subcontr. reqmts) MRP element BB | ||
80 | ![]() |
U1BED | XFELD | CHAR | 1 | 0 | Release for stock transfer order | ||
81 | ![]() |
U2BED | XFELD | CHAR | 1 | 0 | Delivery schedule for a stock transfer requisition | ||
82 | ![]() |
U4BED | XFELD | CHAR | 1 | 0 | Delivery schedule for stock transport scheduling agreement | ||
83 | ![]() |
A1BED | XFELD | CHAR | 1 | 0 | Dependent reservation - standard orders | ||
84 | ![]() |
A2BED | XFELD | CHAR | 1 | 0 | Dependent reservation - plant maintenance orders and network | ||
85 | ![]() |
GRREL | XFELD | CHAR | 1 | 0 | Relevant for requirements grouping for project stock | ||
86 | ![]() |
AHDIS | AHDIS | CHAR | 1 | 0 | MRP relevancy for dependent requirements | ||
87 | ![]() |
VERTR | XFELD | CHAR | 1 | 0 | Start date of order proposals allowed in the past | ||
88 | ![]() |
WZTER | DATUM | DATS | 8 | 0 | End of replenishment lead time | ||
89 | ![]() |
FKOBS | XFELD | CHAR | 1 | 0 | ATP check by full confirmation logic | ||
90 | ![]() |
PSTMP | TZNTSTMPS | DEC | 15 | 0 | Last Change to Planned Order: Time Stamp | ||
91 | ![]() |
MD_SCFLG | XFELD | CHAR | 1 | 0 | Indicator: General Subcontracting Logic | ||
92 | ![]() |
MD_UMLDB | MD_UMLDB | CHAR | 1 | 0 | Indicator for Stock Transfer with MRP Areas | ||
93 | ![]() |
MGV_CONF_MATERIAL_EXTERNAL | MATNR_EXT | CHAR | 40 | 0 | Long Material Number (Future Development) for CONF_ Field | ||
94 | ![]() |
MGV_CONF_MATERIAL_GUID | MATNR_EGUID | CHAR | 32 | 0 | External GUID (Future Development) for CONF_MATERIAL Field | ||
95 | ![]() |
MGV_CONF_MATERIAL_VERSION | MATNR_VERS | CHAR | 10 | 0 | Version Number (Future Development) for CONF_MATERI Field |
History
Last changed by/on | SAP | 20130529 |
SAP Release Created in | 500 |