Data Element list used by SAP ABAP Table BAPI_MRP_CONTROL_PARAM (MRP: Control Parameters for Material)
SAP ABAP Table
BAPI_MRP_CONTROL_PARAM (MRP: Control Parameters for Material) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | A1BED | Dependent reservation - standard orders | ||
| 2 | A2BED | Dependent reservation - plant maintenance orders and network | ||
| 3 | AGRES | Aggregated dependent requirements | ||
| 4 | AHDIS | MRP relevancy for dependent requirements | ||
| 5 | ANDEC | No. of decimal places to which rounding should be performed | ||
| 6 | ANDIS | Number of Days After Which the Material Must Be Planned | ||
| 7 | BANER | Creation Indicator for Purchase Requisitions | ||
| 8 | BBBED | Material staging reqmts (subcontr. reqmts) MRP element BB | ||
| 9 | BBSRT_LB | MRP: Document type purchase requisition for subcontracting | ||
| 10 | BBSRT_NB | MRP:doc.type purchase requisitions for standard purchase ord | ||
| 11 | BBSRT_UL | MRP: purchase requisition for stock transfer - document type | ||
| 12 | BESAL | Determine Explosion Date for BOM and Routing | ||
| 13 | CHAR1 | Single-Character Flag | ||
| 14 | CHAR1 | Single-Character Flag | ||
| 15 | CHAR1 | Single-Character Flag | ||
| 16 | DISER | Creation Indicator for MRP Lists | ||
| 17 | EXSGT | Do Not Explode Bulk Material Items | ||
| 18 | FIXTR | End of planning time fence (date) | ||
| 19 | FKOBS | ATP check by full confirmation logic | ||
| 20 | FXART | Firming Type of the Planning Result | ||
| 21 | FXHOR | Planning time fence | ||
| 22 | GRREL | Relevant for requirements grouping for project stock | ||
| 23 | GTERM | Scheduling according to purchasing info record or agreement | ||
| 24 | ICBED | Reorder point planning with external requirements | ||
| 25 | KZBED | Indicator for Requirements Grouping | ||
| 26 | KZDRB | Indicator: direct procurement/production MRP | ||
| 27 | KZREG | Indicator: plan material regularly | ||
| 28 | LIFKZ | Automatic Schedule Lines (Scheduling Agreements) | ||
| 29 | MD_SCFLG | Indicator: General Subcontracting Logic | ||
| 30 | MD_UMLDB | Indicator for Stock Transfer with MRP Areas | ||
| 31 | MENGU | Quantity Updating in Material Master Record | ||
| 32 | MFDAT | Set manual firming date: Date to set | ||
| 33 | MFHKZ | Planning time fence set manually (MFXDT) | ||
| 34 | MFNAM | Set manual firming date: User | ||
| 35 | MFXDT | Manual firming date | ||
| 36 | MFXKZ | Indicator: MFXDT changed | ||
| 37 | MGV_CONF_MATERIAL_EXTERNAL | Long Material Number (Future Development) for CONF_ Field | ||
| 38 | MGV_CONF_MATERIAL_GUID | External GUID (Future Development) for CONF_MATERIAL Field | ||
| 39 | MGV_CONF_MATERIAL_VERSION | Version Number (Future Development) for CONF_MATERI Field | ||
| 40 | NODUM | No requirements for phantom assembly | ||
| 41 | OPFDT | Date of firm planned order last copied from MRP | ||
| 42 | OPFKZ | Indicator:OPFDT changed | ||
| 43 | OSELT | Above selection date | ||
| 44 | PLAHZ | Planning horizon | ||
| 45 | PLIFZ | Planned delivery time in days | ||
| 46 | PLNKZ | Planning Indicator | ||
| 47 | PLSEL | Issue Storage Location Selection | ||
| 48 | PLTER | End of planning horizon | ||
| 49 | PRREG | Checking rule for the availability check | ||
| 50 | PSTMP | Last Change to Planned Order: Time Stamp | ||
| 51 | RESHZ | Roll forward period for the master plan | ||
| 52 | RESPL | Indicator: delete firm planned orders | ||
| 53 | RESVP | Period of adjustment for planned independent requirements | ||
| 54 | RHDAT | Next planning date for time-phased planning | ||
| 55 | RHEND | End of the requirements period for time-phased MRP | ||
| 56 | RSTER | End of roll forward period | ||
| 57 | RVPKZ | Adjustment of Planned Independent Requirements | ||
| 58 | RVPTR | End of adjustment period for planned independent reqmts | ||
| 59 | RW1DT | Planning horizon for range of coverage 01 | ||
| 60 | RW1TG | Target Range of Coverage in Period 01 | ||
| 61 | RW1TG | Target Range of Coverage in Period 01 | ||
| 62 | RW1TG | Target Range of Coverage in Period 01 | ||
| 63 | RW1TG | Target Range of Coverage in Period 01 | ||
| 64 | RW1TG | Target Range of Coverage in Period 01 | ||
| 65 | RW1TG | Target Range of Coverage in Period 01 | ||
| 66 | RW1TG | Target Range of Coverage in Period 01 | ||
| 67 | RW2DT | Planning horizon for range of coverage 02 | ||
| 68 | RW2TG | Target Range of Coverage in Period 02 | ||
| 69 | RW3TG | Target Range of Coverage in the Rest of the Period | ||
| 70 | RWANZ | Number of periods for determining the average | ||
| 71 | RWART | Period length type for calculating the average | ||
| 72 | RWFLG | Calculate safety stock based on range of coverage | ||
| 73 | RWNTG | Number of days per range of coverage period | ||
| 74 | RWPER | Period for Calculating the Dynamic Safety Stock | ||
| 75 | RYBED | Time-phased planning with requirements (MRP) | ||
| 76 | SBDIS | Share of safety stock which can be used for planning | ||
| 77 | STDPD | Configurable material | ||
| 78 | SUMAU | Total sales order requirements | ||
| 79 | U1BED | Release for stock transfer order | ||
| 80 | U2BED | Delivery schedule for a stock transfer requisition | ||
| 81 | U4BED | Delivery schedule for stock transport scheduling agreement | ||
| 82 | UMTER | End of rescheduling horizon (date) | ||
| 83 | UMTHZ | Rescheduling horizon | ||
| 84 | USEQU | Quota arrangement usage | ||
| 85 | VERTR | Start date of order proposals allowed in the past | ||
| 86 | VINT1 | Consumption period: backward | ||
| 87 | VINT2 | Consumption period: forward | ||
| 88 | VRMOD | Consumption mode | ||
| 89 | VWVER | Tolerance value for displacement in the future | ||
| 90 | VWVOR | Tolerance value for bringing forward receipt elements | ||
| 91 | WERTU | Value Updating in Material Master Record | ||
| 92 | WZTER | End of replenishment lead time | ||
| 93 | WZTER | End of replenishment lead time | ||
| 94 | XFAT1 | Firm Only Schedule Lines Transmitted to Vendor by Purchasing | ||
| 95 | XVPLB | Planning Variant |