SAP ABAP Data Element RVPTR (End of adjustment period for planned independent reqmts)
Hierarchy
☛
SAP_ABA (Software Component) Cross-Application Component
⤷
CA-GTF-TS (Application Component) Technical Application Support
⤷
BMG (Package) Material Master: Componentization Interfaces

⤷

⤷

Basic Data
Data Element | RVPTR |
Short Description | End of adjustment period for planned independent reqmts |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | END_ADJUSTMENT_PERIOD | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | EndAdjust. |
Medium | 16 | End adjst.period |
Long | 22 | End adjustment period |
Heading | 0 |
Documentation
Definition
This date indicates the end of the period of adjustment.
If the adjustment of the planned independent requirements is determined and you have maintained a period of adjustment, then the system will not create new order proposals for planned indepedent requirements in the period of adjustment. This means that, in this period, only customer requirements are included in the planning run.
History
Last changed by/on | SAP | 19990629 |
SAP Release Created in |