SAP ABAP Table BAPICM61M (MRP control indicator -material level-)
Hierarchy
☛
SAP_ABA (Software Component) Cross-Application Component
⤷
CA-GTF-TS (Application Component) Technical Application Support
⤷
BMG (Package) Material Master: Componentization Interfaces
⤷
⤷
Basic Data
| Table Category | INTTAB | Structure |
| Structure | BAPICM61M |
|
| Short Description | MRP control indicator -material level- |
Delivery and Maintenance
| Pool/cluster | ||
| Delivery Class | ||
| Data Browser/Table View Maintenance | Display/Maintenance Allowed with Restrictions |
Components
| |
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
|---|---|---|---|---|---|---|---|---|---|
| 1 | |
BANER | BANER | CHAR | 1 | 0 | Creation Indicator for Purchase Requisitions | ||
| 2 | |
LIFKZ | LIFKZ | CHAR | 1 | 0 | Automatic Schedule Lines (Scheduling Agreements) | ||
| 3 | |
DISER | DISER | CHAR | 1 | 0 | Creation Indicator for MRP Lists | ||
| 4 | |
BMG_WERTU | XFELD | CHAR | 1 | 0 | Value Update in Material Master Record | ||
| 5 | |
BMG_MENGU | XFELD | CHAR | 1 | 0 | Quantity Update in Material Master Record | ||
| 6 | |
ANDEC | ANDEC | INT2 | 5 | 0 | No. of decimal places to which rounding should be performed | ||
| 7 | |
USEQU | USEQU | CHAR | 1 | 0 | Quota arrangement usage | * | |
| 8 | |
SBDIS | NUM03 | NUMC | 3 | 0 | Share of safety stock which can be used for planning | ||
| 9 | |
ICBED | ICBED | CHAR | 1 | 0 | Reorder point planning with external requirements | ||
| 10 | |
FXART | FXART | CHAR | 1 | 0 | Firming Type of the Planning Result | ||
| 11 | |
FXHOR | FXHOR | NUMC | 3 | 0 | Planning time fence | ||
| 12 | |
FIXTR | DATUM | DATS | 8 | 0 | End of planning time fence (date) | ||
| 13 | |
RESPL | RESPL | CHAR | 1 | 0 | Indicator: delete firm planned orders | ||
| 14 | |
RESHZ | RESHZ | DEC | 2 | 0 | Roll forward period for the master plan | ||
| 15 | |
RSTER | DATUM | DATS | 8 | 0 | End of roll forward period | ||
| 16 | |
UMTHZ | NUM03 | NUMC | 3 | 0 | Rescheduling horizon | ||
| 17 | |
UMTER | DATUM | DATS | 8 | 0 | End of rescheduling horizon (date) | ||
| 18 | |
VWVOR | NUM02 | NUMC | 2 | 0 | Tolerance value for bringing forward receipt elements | ||
| 19 | |
VWVER | NUM02 | NUMC | 2 | 0 | Tolerance value for displacement in the future | ||
| 20 | |
PLAHZ | NUM03 | NUMC | 3 | 0 | Planning horizon | ||
| 21 | |
PLTER | DATUM | DATS | 8 | 0 | End of planning horizon | ||
| 22 | |
WZTER | DATUM | DATS | 8 | 0 | End of replenishment lead time | ||
| 23 | |
VRMOD | VRMOD | CHAR | 1 | 0 | Consumption mode | ||
| 24 | |
VINT1 | VRINT | NUMC | 3 | 0 | Consumption period: backward | ||
| 25 | |
VINT2 | VRINT | NUMC | 3 | 0 | Consumption period: forward | ||
| 26 | |
CHAR1 | CHAR1 | CHAR | 1 | 0 | Single-Character Flag | ||
| 27 | |
CHAR1 | CHAR1 | CHAR | 1 | 0 | Single-Character Flag | ||
| 28 | |
RVPKZ | RVPKZ | CHAR | 1 | 0 | Adjustment of Planned Independent Requirements | ||
| 29 | |
RESVP | RESVP | DEC | 3 | 0 | Period of adjustment for planned independent requirements | ||
| 30 | |
RVPTR | DATUM | DATS | 8 | 0 | End of adjustment period for planned independent reqmts | ||
| 31 | |
EXSGT | XFLAG | CHAR | 1 | 0 | Do Not Explode Bulk Material Items | ||
| 32 | |
BESAL | BESAL | CHAR | 1 | 0 | Determine Explosion Date for BOM and Routing | ||
| 33 | |
GTERM | XFELD | CHAR | 1 | 0 | Scheduling according to purchasing info record or agreement | ||
| 34 | |
KZDRB | KZDRB | CHAR | 1 | 0 | Indicator: direct procurement/production MRP | ||
| 35 | |
CHAR1 | CHAR1 | CHAR | 1 | 0 | Single-Character Flag | ||
| 36 | |
PLNKZ | PLNKZ | CHAR | 1 | 0 | Planning Indicator | ||
| 37 | |
OSELT | DATUM | DATS | 8 | 0 | Above selection date | ||
| 38 | |
BMG_PRREG | BMG_PRREG | CHAR | 2 | 0 | Checking Rule for the Availability Check | ||
| 39 | |
SUMAU | SUMBD | CHAR | 1 | 0 | Total sales order requirements | ||
| 40 | |
RWFLG | XFELD | CHAR | 1 | 0 | Calculate safety stock based on range of coverage | ||
| 41 | |
RWPER | RWPER | CHAR | 1 | 0 | Period for Calculating the Dynamic Safety Stock | ||
| 42 | |
RWANZ | NUMC2 | NUMC | 2 | 0 | Number of periods for determining the average | ||
| 43 | |
RWART | RWART | CHAR | 1 | 0 | Period length type for calculating the average | ||
| 44 | |
RWNTG | NUMC2 | NUMC | 2 | 0 | Number of days per range of coverage period | ||
| 45 | |
RW1TG | RWTAG | NUMC | 2 | 0 | Target Range of Coverage in Period 01 | ||
| 46 | |
RW1DT | DATUM | DATS | 8 | 0 | Planning horizon for range of coverage 01 | ||
| 47 | |
RW2TG | RWTAG | NUMC | 2 | 0 | Target Range of Coverage in Period 02 | ||
| 48 | |
RW2DT | DATUM | DATS | 8 | 0 | Planning horizon for range of coverage 02 | ||
| 49 | |
RW3TG | RWTAG | NUMC | 2 | 0 | Target Range of Coverage in the Rest of the Period | ||
| 50 | |
RW1TG | RWTAG | NUMC | 2 | 0 | Target Range of Coverage in Period 01 | ||
| 51 | |
RW1TG | RWTAG | NUMC | 2 | 0 | Target Range of Coverage in Period 01 | ||
| 52 | |
RW1TG | RWTAG | NUMC | 2 | 0 | Target Range of Coverage in Period 01 | ||
| 53 | |
RW1TG | RWTAG | NUMC | 2 | 0 | Target Range of Coverage in Period 01 | ||
| 54 | |
RW1TG | RWTAG | NUMC | 2 | 0 | Target Range of Coverage in Period 01 | ||
| 55 | |
RW1TG | RWTAG | NUMC | 2 | 0 | Target Range of Coverage in Period 01 | ||
| 56 | |
KZREG | XFELD | CHAR | 1 | 0 | Indicator: plan material regularly | ||
| 57 | |
RHEND | DATUM | DATS | 8 | 0 | End of the requirements period for time-phased MRP | ||
| 58 | |
XFAT1 | XFELD | CHAR | 1 | 0 | Firm Only Schedule Lines Transmitted to Vendor by Purchasing | ||
| 59 | |
ANDIS | INT2 | INT2 | 5 | 0 | Number of Days After Which the Material Must Be Planned | ||
| 60 | |
PLIFZ | DEC3 | DEC | 3 | 0 | Planned delivery time in days | ||
| 61 | |
KZBED | KZBED | CHAR | 1 | 0 | Indicator for Requirements Grouping | ||
| 62 | |
PLSEL | PLSEL | CHAR | 1 | 0 | Issue Storage Location Selection |
History
| Last changed by/on | SAP | 20130604 |
| SAP Release Created in |