Data Element list used by SAP ABAP Table BAPICM61M (MRP control indicator -material level-)
SAP ABAP Table
BAPICM61M (MRP control indicator -material level-) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | ANDEC | No. of decimal places to which rounding should be performed | ||
| 2 | ANDIS | Number of Days After Which the Material Must Be Planned | ||
| 3 | BANER | Creation Indicator for Purchase Requisitions | ||
| 4 | BESAL | Determine Explosion Date for BOM and Routing | ||
| 5 | BMG_MENGU | Quantity Update in Material Master Record | ||
| 6 | BMG_PRREG | Checking Rule for the Availability Check | ||
| 7 | BMG_WERTU | Value Update in Material Master Record | ||
| 8 | CHAR1 | Single-Character Flag | ||
| 9 | CHAR1 | Single-Character Flag | ||
| 10 | CHAR1 | Single-Character Flag | ||
| 11 | DISER | Creation Indicator for MRP Lists | ||
| 12 | EXSGT | Do Not Explode Bulk Material Items | ||
| 13 | FIXTR | End of planning time fence (date) | ||
| 14 | FXART | Firming Type of the Planning Result | ||
| 15 | FXHOR | Planning time fence | ||
| 16 | GTERM | Scheduling according to purchasing info record or agreement | ||
| 17 | ICBED | Reorder point planning with external requirements | ||
| 18 | KZBED | Indicator for Requirements Grouping | ||
| 19 | KZDRB | Indicator: direct procurement/production MRP | ||
| 20 | KZREG | Indicator: plan material regularly | ||
| 21 | LIFKZ | Automatic Schedule Lines (Scheduling Agreements) | ||
| 22 | OSELT | Above selection date | ||
| 23 | PLAHZ | Planning horizon | ||
| 24 | PLIFZ | Planned delivery time in days | ||
| 25 | PLNKZ | Planning Indicator | ||
| 26 | PLSEL | Issue Storage Location Selection | ||
| 27 | PLTER | End of planning horizon | ||
| 28 | RESHZ | Roll forward period for the master plan | ||
| 29 | RESPL | Indicator: delete firm planned orders | ||
| 30 | RESVP | Period of adjustment for planned independent requirements | ||
| 31 | RHEND | End of the requirements period for time-phased MRP | ||
| 32 | RSTER | End of roll forward period | ||
| 33 | RVPKZ | Adjustment of Planned Independent Requirements | ||
| 34 | RVPTR | End of adjustment period for planned independent reqmts | ||
| 35 | RW1DT | Planning horizon for range of coverage 01 | ||
| 36 | RW1TG | Target Range of Coverage in Period 01 | ||
| 37 | RW1TG | Target Range of Coverage in Period 01 | ||
| 38 | RW1TG | Target Range of Coverage in Period 01 | ||
| 39 | RW1TG | Target Range of Coverage in Period 01 | ||
| 40 | RW1TG | Target Range of Coverage in Period 01 | ||
| 41 | RW1TG | Target Range of Coverage in Period 01 | ||
| 42 | RW1TG | Target Range of Coverage in Period 01 | ||
| 43 | RW2DT | Planning horizon for range of coverage 02 | ||
| 44 | RW2TG | Target Range of Coverage in Period 02 | ||
| 45 | RW3TG | Target Range of Coverage in the Rest of the Period | ||
| 46 | RWANZ | Number of periods for determining the average | ||
| 47 | RWART | Period length type for calculating the average | ||
| 48 | RWFLG | Calculate safety stock based on range of coverage | ||
| 49 | RWNTG | Number of days per range of coverage period | ||
| 50 | RWPER | Period for Calculating the Dynamic Safety Stock | ||
| 51 | SBDIS | Share of safety stock which can be used for planning | ||
| 52 | SUMAU | Total sales order requirements | ||
| 53 | UMTER | End of rescheduling horizon (date) | ||
| 54 | UMTHZ | Rescheduling horizon | ||
| 55 | USEQU | Quota arrangement usage | ||
| 56 | VINT1 | Consumption period: backward | ||
| 57 | VINT2 | Consumption period: forward | ||
| 58 | VRMOD | Consumption mode | ||
| 59 | VWVER | Tolerance value for displacement in the future | ||
| 60 | VWVOR | Tolerance value for bringing forward receipt elements | ||
| 61 | WZTER | End of replenishment lead time | ||
| 62 | XFAT1 | Firm Only Schedule Lines Transmitted to Vendor by Purchasing |