Data Element list used by SAP ABAP Table BAPICM61M (MRP control indicator -material level-)
SAP ABAP Table
BAPICM61M (MRP control indicator -material level-) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
ANDEC | No. of decimal places to which rounding should be performed | |
2 | ![]() |
ANDIS | Number of Days After Which the Material Must Be Planned | |
3 | ![]() |
BANER | Creation Indicator for Purchase Requisitions | |
4 | ![]() |
BESAL | Determine Explosion Date for BOM and Routing | |
5 | ![]() |
BMG_MENGU | Quantity Update in Material Master Record | |
6 | ![]() |
BMG_PRREG | Checking Rule for the Availability Check | |
7 | ![]() |
BMG_WERTU | Value Update in Material Master Record | |
8 | ![]() |
CHAR1 | Single-Character Flag | |
9 | ![]() |
CHAR1 | Single-Character Flag | |
10 | ![]() |
CHAR1 | Single-Character Flag | |
11 | ![]() |
DISER | Creation Indicator for MRP Lists | |
12 | ![]() |
EXSGT | Do Not Explode Bulk Material Items | |
13 | ![]() |
FIXTR | End of planning time fence (date) | |
14 | ![]() |
FXART | Firming Type of the Planning Result | |
15 | ![]() |
FXHOR | Planning time fence | |
16 | ![]() |
GTERM | Scheduling according to purchasing info record or agreement | |
17 | ![]() |
ICBED | Reorder point planning with external requirements | |
18 | ![]() |
KZBED | Indicator for Requirements Grouping | |
19 | ![]() |
KZDRB | Indicator: direct procurement/production MRP | |
20 | ![]() |
KZREG | Indicator: plan material regularly | |
21 | ![]() |
LIFKZ | Automatic Schedule Lines (Scheduling Agreements) | |
22 | ![]() |
OSELT | Above selection date | |
23 | ![]() |
PLAHZ | Planning horizon | |
24 | ![]() |
PLIFZ | Planned delivery time in days | |
25 | ![]() |
PLNKZ | Planning Indicator | |
26 | ![]() |
PLSEL | Issue Storage Location Selection | |
27 | ![]() |
PLTER | End of planning horizon | |
28 | ![]() |
RESHZ | Roll forward period for the master plan | |
29 | ![]() |
RESPL | Indicator: delete firm planned orders | |
30 | ![]() |
RESVP | Period of adjustment for planned independent requirements | |
31 | ![]() |
RHEND | End of the requirements period for time-phased MRP | |
32 | ![]() |
RSTER | End of roll forward period | |
33 | ![]() |
RVPKZ | Adjustment of Planned Independent Requirements | |
34 | ![]() |
RVPTR | End of adjustment period for planned independent reqmts | |
35 | ![]() |
RW1DT | Planning horizon for range of coverage 01 | |
36 | ![]() |
RW1TG | Target Range of Coverage in Period 01 | |
37 | ![]() |
RW1TG | Target Range of Coverage in Period 01 | |
38 | ![]() |
RW1TG | Target Range of Coverage in Period 01 | |
39 | ![]() |
RW1TG | Target Range of Coverage in Period 01 | |
40 | ![]() |
RW1TG | Target Range of Coverage in Period 01 | |
41 | ![]() |
RW1TG | Target Range of Coverage in Period 01 | |
42 | ![]() |
RW1TG | Target Range of Coverage in Period 01 | |
43 | ![]() |
RW2DT | Planning horizon for range of coverage 02 | |
44 | ![]() |
RW2TG | Target Range of Coverage in Period 02 | |
45 | ![]() |
RW3TG | Target Range of Coverage in the Rest of the Period | |
46 | ![]() |
RWANZ | Number of periods for determining the average | |
47 | ![]() |
RWART | Period length type for calculating the average | |
48 | ![]() |
RWFLG | Calculate safety stock based on range of coverage | |
49 | ![]() |
RWNTG | Number of days per range of coverage period | |
50 | ![]() |
RWPER | Period for Calculating the Dynamic Safety Stock | |
51 | ![]() |
SBDIS | Share of safety stock which can be used for planning | |
52 | ![]() |
SUMAU | Total sales order requirements | |
53 | ![]() |
UMTER | End of rescheduling horizon (date) | |
54 | ![]() |
UMTHZ | Rescheduling horizon | |
55 | ![]() |
USEQU | Quota arrangement usage | |
56 | ![]() |
VINT1 | Consumption period: backward | |
57 | ![]() |
VINT2 | Consumption period: forward | |
58 | ![]() |
VRMOD | Consumption mode | |
59 | ![]() |
VWVER | Tolerance value for displacement in the future | |
60 | ![]() |
VWVOR | Tolerance value for bringing forward receipt elements | |
61 | ![]() |
WZTER | End of replenishment lead time | |
62 | ![]() |
XFAT1 | Firm Only Schedule Lines Transmitted to Vendor by Purchasing |