SAP ABAP Data Element ICBED (Reorder point planning with external requirements)
Hierarchy
SAP_ABA (Software Component) Cross-Application Component
   CA-GTF-TS (Application Component) Technical Application Support
     BMG (Package) Material Master: Componentization Interfaces
Basic Data
Data Element ICBED
Short Description Reorder point planning with external requirements  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type ICBED    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name INCLUDE_EXT_REQ   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Incl.reqs 
Medium 15 Include reqmts 
Long 20 Include ext. reqmts 
Heading  
Documentation

Definition

Indicates whether an external requirement (sales order or manual reservation) is included in the net requirements calculation for reorder point planning.

If yes, you can decide whether it is to be included:

Example

The reorder point for a material is 30 pieces and the current warehouse stock is 35. A customer requirement exists for 10 pieces for a requirements date in three weeks. The replenishment lead time for the material is one week.

If indicator 1 External requirements in total horizon is set, the system takes the customer requirements into account in the next planning run. This means, the system creates an order proposal because the system considers the warehouse stock as having fallen below the reorder point (35 pcs - 10 pcs = 25 pcs) even if the requirements date is not until after the replenishment.

If indicator 2 External requirements within the replenishment lead time is set, the system does not include the customer requirement with a requirements date outside the replenishment lead time. In this example, the system would not include the customer requirement in the planning run for two weeks.

History
Last changed by/on SAP  19990629 
SAP Release Created in