SAP ABAP Data Element WZTER (End of replenishment lead time)
Hierarchy
SAP_ABA (Software Component) Cross-Application Component
   CA-GTF-TS (Application Component) Technical Application Support
     BMG (Package) Material Master: Componentization Interfaces
Basic Data
Data Element WZTER
Short Description End of replenishment lead time  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DATUM    
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name WZTER   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 EndLeadTme 
Medium 15 End lead time 
Long 20 End repl. lead time 
Heading 10 EndLeadTme 
Documentation

Definition

The end of replenishment lead time is the date on which the material could be available again if production or procurement is started today.

The replenishment lead time is calculated as follows.

  • For materials procured externally:
    • By adding the processing time required by purchasing, the planned delivery time, and the goods receipt processing time.
  • For all other materials:
    • By adding the in-house production time and goods receipt processing time for the material
    • Or, if a Total replenishment lead time has been maintained in the material master record (MRP view), by using the time that is entered in this field - that is, the total replenishment lead time of the product with all BOM levels.

Dependencies

All times are maintained as workdays, with the exception of the planned delivery time which is maintained in calendar days.

Supplementary Documentation - WZTER 0001

Use

Procedure

Examples

Dependencies

History
Last changed by/on SAP  19990629 
SAP Release Created in