Data Element list used by SAP ABAP Table PPH_MAT_CTRL_PARAMS (Structure for Material Data used in Database)
SAP ABAP Table PPH_MAT_CTRL_PARAMS (Structure for Material Data used in Database) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
1 | Data Element | AHDIS | MRP relevancy for dependent requirements | |
2 | Data Element | ANDEC | No. of decimal places to which rounding should be performed | |
3 | Data Element | ATTYP | Material Category | |
4 | Data Element | AUSDT | Effective-out date | |
5 | Data Element | BBBED | Material staging reqmts (subcontr. reqmts) MRP element BB | |
6 | Data Element | BEARZ | Processing time | |
7 | Data Element | BERID | MRP Area | |
8 | Data Element | BERTY | Type of MRP area | |
9 | Data Element | BESKZ | Procurement Type | |
10 | Data Element | CUOBJ | Configuration (internal object number) | |
11 | Data Element | CUOBV | Internal object number of configurable material for planning | |
12 | Data Element | DISFG | Activate MRP areas at client level | |
13 | Data Element | DISGR | MRP Group | |
14 | Data Element | DISLS | Lot size (materials planning) | |
15 | Data Element | DISMM | MRP Type | |
16 | Data Element | DISVF | MRP procedure | |
17 | Data Element | DZEIT | In-house production time | |
18 | Data Element | EISBE | Safety stock | |
19 | Data Element | FABKL | Factory calendar key | |
20 | Data Element | FIXTR | End of planning time fence (date) | |
21 | Data Element | FXART | Firming Type of the Planning Result | |
22 | Data Element | GRREL | Relevant for requirements grouping for project stock | |
23 | Data Element | GTERM | Scheduling according to purchasing info record or agreement | |
24 | Data Element | INTEGER1 | Integer 1 | |
25 | Data Element | INTEGER2 | Integer 2 | |
26 | Data Element | KKOWK | Indicator: Conditions at plant level | |
27 | Data Element | KZAUS | Discontinuation indicator | |
28 | Data Element | KZUMB | Indicator: stock in transfer available for planning | |
29 | Data Element | MANDT | Client | |
30 | Data Element | MATNR | Material Number | |
31 | Data Element | MD_SCFLG | Indicator: General Subcontracting Logic | |
32 | Data Element | MEINS | Base Unit of Measure | |
33 | Data Element | MENGU | Quantity Updating in Material Master Record | |
34 | Data Element | MFHKZ | Planning time fence set manually (MFXDT) | |
35 | Data Element | MFXDT | Manual firming date | |
36 | Data Element | MISKZ | Mixed MRP indicator | |
37 | Data Element | MRPPP | PPC planning calendar | |
38 | Data Element | NFVBC | Take restricted-use stock into account (only for batches) | |
39 | Data Element | PLIFZ | Planned delivery time in days | |
40 | Data Element | QMATV | Inspection Setup Exists for Material/Plant | |
41 | Data Element | REFWK | Reference plant | |
42 | Data Element | RESVP | Period of adjustment for planned independent requirements | |
43 | Data Element | RUEZT | Setup and teardown time | |
44 | Data Element | RVPKZ | Adjustment of Planned Independent Requirements | |
45 | Data Element | SATNR | Cross-Plant Configurable Material | |
46 | Data Element | SHFLG | Safety time indicator (with or without safety time) | |
47 | Data Element | SHPRO | Period profile for safety time | |
48 | Data Element | SHZET | Safety time (in workdays) | |
49 | Data Element | STDPD | Configurable material | |
50 | Data Element | TRANZ | Interoperation time | |
51 | Data Element | UMLME | Stock in transfer (plant to plant) | |
52 | Data Element | VINT1 | Consumption period: backward | |
53 | Data Element | VINT2 | Consumption period: forward | |
54 | Data Element | VRMOD | Consumption mode | |
55 | Data Element | WEBAZ | Goods receipt processing time in days | |
56 | Data Element | WERKS_D | Plant | |
57 | Data Element | WERTU | Value Updating in Material Master Record | |
58 | Data Element | WZEIT | Total replenishment lead time (in workdays) | |
59 | Data Element | XFAN1 | Indicator: blocked stock available for planning |