Data Element list used by SAP ABAP Table PPH_MAT_CTRL_PARAMS (Structure for Material Data used in Database)
SAP ABAP Table
PPH_MAT_CTRL_PARAMS (Structure for Material Data used in Database) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AHDIS | MRP relevancy for dependent requirements | ||
| 2 | ANDEC | No. of decimal places to which rounding should be performed | ||
| 3 | ATTYP | Material Category | ||
| 4 | AUSDT | Effective-out date | ||
| 5 | BBBED | Material staging reqmts (subcontr. reqmts) MRP element BB | ||
| 6 | BEARZ | Processing time | ||
| 7 | BERID | MRP Area | ||
| 8 | BERTY | Type of MRP area | ||
| 9 | BESKZ | Procurement Type | ||
| 10 | CUOBJ | Configuration (internal object number) | ||
| 11 | CUOBV | Internal object number of configurable material for planning | ||
| 12 | DISFG | Activate MRP areas at client level | ||
| 13 | DISGR | MRP Group | ||
| 14 | DISLS | Lot size (materials planning) | ||
| 15 | DISMM | MRP Type | ||
| 16 | DISVF | MRP procedure | ||
| 17 | DZEIT | In-house production time | ||
| 18 | EISBE | Safety stock | ||
| 19 | FABKL | Factory calendar key | ||
| 20 | FIXTR | End of planning time fence (date) | ||
| 21 | FXART | Firming Type of the Planning Result | ||
| 22 | GRREL | Relevant for requirements grouping for project stock | ||
| 23 | GTERM | Scheduling according to purchasing info record or agreement | ||
| 24 | INTEGER1 | Integer 1 | ||
| 25 | INTEGER2 | Integer 2 | ||
| 26 | KKOWK | Indicator: Conditions at plant level | ||
| 27 | KZAUS | Discontinuation indicator | ||
| 28 | KZUMB | Indicator: stock in transfer available for planning | ||
| 29 | MANDT | Client | ||
| 30 | MATNR | Material Number | ||
| 31 | MD_SCFLG | Indicator: General Subcontracting Logic | ||
| 32 | MEINS | Base Unit of Measure | ||
| 33 | MENGU | Quantity Updating in Material Master Record | ||
| 34 | MFHKZ | Planning time fence set manually (MFXDT) | ||
| 35 | MFXDT | Manual firming date | ||
| 36 | MISKZ | Mixed MRP indicator | ||
| 37 | MRPPP | PPC planning calendar | ||
| 38 | NFVBC | Take restricted-use stock into account (only for batches) | ||
| 39 | PLIFZ | Planned delivery time in days | ||
| 40 | QMATV | Inspection Setup Exists for Material/Plant | ||
| 41 | REFWK | Reference plant | ||
| 42 | RESVP | Period of adjustment for planned independent requirements | ||
| 43 | RUEZT | Setup and teardown time | ||
| 44 | RVPKZ | Adjustment of Planned Independent Requirements | ||
| 45 | SATNR | Cross-Plant Configurable Material | ||
| 46 | SHFLG | Safety time indicator (with or without safety time) | ||
| 47 | SHPRO | Period profile for safety time | ||
| 48 | SHZET | Safety time (in workdays) | ||
| 49 | STDPD | Configurable material | ||
| 50 | TRANZ | Interoperation time | ||
| 51 | UMLME | Stock in transfer (plant to plant) | ||
| 52 | VINT1 | Consumption period: backward | ||
| 53 | VINT2 | Consumption period: forward | ||
| 54 | VRMOD | Consumption mode | ||
| 55 | WEBAZ | Goods receipt processing time in days | ||
| 56 | WERKS_D | Plant | ||
| 57 | WERTU | Value Updating in Material Master Record | ||
| 58 | WZEIT | Total replenishment lead time (in workdays) | ||
| 59 | XFAN1 | Indicator: blocked stock available for planning |