SAP ABAP Data Element CO_IAMNG (Expected surplus/deficit for goods receipt)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ CO (Package) R/3 Application development: PP Production orders
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ CO (Package) R/3 Application development: PP Production orders
Basic Data
Data Element | CO_IAMNG |
Short Description | Expected surplus/deficit for goods receipt |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | MENG13V | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 13 | |
Decimal Places | 3 | |
Output Length | 18 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | ExpVarRcpt |
Medium | 15 | ExpectVarRecipt |
Long | 20 | ExpectVarianceRecept |
Heading | 18 | ExpectVarianceRcpt |
Documentation
Definition
This quantity indicates by how much the goods receipt of the finished product will probably deviate from the planned goods receipt.
It is updated when the operations are finally confirmed as soon as an operation quantity that varies from the plan is confirmed as the yield.
Example
If a production order is to manufacture 100 pieces and a quantity of 5 pieces is displayed in this field then you can expect anen Lagerzugang von 95 Stück erwarten.
Dependencies
If this value is negative that means that you have produced more than you originally planned. In this case you can expect a correspondingly high goods receipt for the finished product.
History
Last changed by/on | SAP | 19981210 |
SAP Release Created in |