Hierarchy
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ CO (Package) R/3 Application development: PP Production orders
Basic Data
Data Element | CO_PRMBD |
Short Description | Check with requirements |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR1 | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | ChkWthRqts |
Medium | 19 | With reqmts qtys |
Long | 20 | With reqmts quants |
Heading | 0 |
Documentation
Definition
If the indicator "With requirements quantities" is set, the system assumes that the total requirements quantity is taken into account during the availability check, rather than the quantities that have already been committed.
Use
In this session you can simulate the result of the availability check that is generated when the availability check is active with cumulated quantities (shortage check). This check is activated in Customizing for Sales and Distribution:
Basic functions -> Availability Check and Transfer of Requirements -> Availability Check -> Availability Check According to ATP Logic and Against Planning -> Define Checking Groups
Dependencies
A check that takes the requirements quantities into account can only be carried out when a customer order or production order is created. Therefore, the "Cumulation" field in the checking group that has been assigned to the checking rule in Customizing must contain one of the following values:
2 - Required quantity when created, no cumulation when changed
3 - Required quantity when created, committed quantity when changed
History
Last changed by/on | SAP | 19970506 |
SAP Release Created in |