Data Element list used by SAP ABAP Table /MRSS/T_RMI_ROLE_NW (Role)
SAP ABAP Table
/MRSS/T_RMI_ROLE_NW (Role) is using
pages: 1 2
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | /MRSS/T_GUID | GUID | ||
| 2 | /MRSS/T_RM_ABLIPKZ | Indicator: simultaneous teardown and wait | ||
| 3 | /MRSS/T_RM_ABRUE | Teardown | ||
| 4 | /MRSS/T_RM_ACTIVITY_TYPE | Process variant | ||
| 5 | /MRSS/T_RM_ADDCOMPARE_CORE | Reference Element PM/PS | ||
| 6 | /MRSS/T_RM_AFAKT | Execution Factor | ||
| 7 | /MRSS/T_RM_ANFKO | Requesting cost center | ||
| 8 | /MRSS/T_RM_ANFKOKRS | Controlling area of the requesting cost center | ||
| 9 | /MRSS/T_RM_ANLZU | Syst.Condition | ||
| 10 | /MRSS/T_RM_ANZMS | Number of employees | ||
| 11 | /MRSS/T_RM_ARUZE | Unit of measure for teardown | ||
| 12 | /MRSS/T_RM_ASSIGNMENTTYPE_NW | Assignment Types | ||
| 13 | /MRSS/T_RM_ASVRG | Operation scrap | ||
| 14 | /MRSS/T_RM_AUFAEDAT_NW | Change date for Order Master | ||
| 15 | /MRSS/T_RM_AUFAENAM_NW | Last changed by | ||
| 16 | /MRSS/T_RM_AUFERFDAT_NW | Created on | ||
| 17 | /MRSS/T_RM_AUFERFNAM_NW | Entered by | ||
| 18 | /MRSS/T_RM_AUFERFNAM_NW | Entered by | ||
| 19 | /MRSS/T_RM_AUFLOEKZ | Deletion flag | ||
| 20 | /MRSS/T_RM_AUMNG | Scrap quantity | ||
| 21 | /MRSS/T_RM_AUMNG | Scrap quantity | ||
| 22 | /MRSS/T_RM_AUSCHUFAK | Scrap factor | ||
| 23 | /MRSS/T_RM_BAGRP | Assembly | ||
| 24 | /MRSS/T_RM_BAUGR | Material number of higher-level assembly | ||
| 25 | /MRSS/T_RM_BEARZEIT | Processing time | ||
| 26 | /MRSS/T_RM_BEAZEP | Unit of processing time (Forecast) | ||
| 27 | /MRSS/T_RM_BEDID | ID of the capacity requirements record | ||
| 28 | /MRSS/T_RM_BILLING_OBJ_TYPE_NW | Billing Object Type | ||
| 29 | /MRSS/T_RM_BILLING_RATE | Billing rate to Customer - Amount | ||
| 30 | /MRSS/T_RM_BILLING_RATE_UNT_NW | Billing Rate Unit (hour or day) | ||
| 31 | /MRSS/T_RM_BILL_OBJ | SO/IO/CC Number | ||
| 32 | /MRSS/T_RM_BMSCH | Base Quantity | ||
| 33 | /MRSS/T_RM_BUDGET_NW | Budget | ||
| 34 | /MRSS/T_RM_CALC_COST_RATE | Calculated Cost Rate | ||
| 35 | /MRSS/T_RM_CANDIDATESUMMARY_NW | Candidate Summary | ||
| 36 | /MRSS/T_RM_CIM_COUNT | Internal counter | ||
| 37 | /MRSS/T_RM_CK_KALNR | Cost Estimate Number for Cost Est. w/o Qty Structure | ||
| 38 | /MRSS/T_RM_CK_KLVAR | Costing Variant | ||
| 39 | /MRSS/T_RM_CN_AUTH | Ind.: Authorization exists | ||
| 40 | /MRSS/T_RM_CN_AUTH | Ind.: Authorization exists | ||
| 41 | /MRSS/T_RM_CN_AUTH | Ind.: Authorization exists | ||
| 42 | /MRSS/T_RM_CN_AUTH | Ind.: Authorization exists | ||
| 43 | /MRSS/T_RM_CN_AUTH | Ind.: Authorization exists | ||
| 44 | /MRSS/T_RM_CN_AUTH | Ind.: Authorization exists | ||
| 45 | /MRSS/T_RM_CN_AUTH | Ind.: Authorization exists | ||
| 46 | /MRSS/T_RM_CN_KZFIX | Indicator: Purchasing info record data are fixed | ||
| 47 | /MRSS/T_RM_CN_RFPNT | Reference point for BOM transfer | ||
| 48 | /MRSS/T_RM_CN_RPIP | Reference Point for Relationship Between iPPE and PS | ||
| 49 | /MRSS/T_RM_CO_APLZL | General counter for order | ||
| 50 | /MRSS/T_RM_CO_APLZL | General counter for order | ||
| 51 | /MRSS/T_RM_CO_APLZL | General counter for order | ||
| 52 | /MRSS/T_RM_CO_AUFPL | Routing number of operations in the order | ||
| 53 | /MRSS/T_RM_CO_AUFPL | Routing number of operations in the order | ||
| 54 | /MRSS/T_RM_CO_BANFN | Purchase requisition number | ||
| 55 | /MRSS/T_RM_CO_BANFN | Purchase requisition number | ||
| 56 | /MRSS/T_RM_CO_BNFPO | Item number of the purchase requisition in the order | ||
| 57 | /MRSS/T_RM_CO_BNFPO | Item number of the purchase requisition in the order | ||
| 58 | /MRSS/T_RM_CO_FRDLB | Indicator: Externally processed op. with subcontracting | ||
| 59 | /MRSS/T_RM_CO_IPRZS | Confirmed quantity/work for business process | ||
| 60 | /MRSS/T_RM_CO_LEIKZ | Indicator: No remaining activity expected | ||
| 61 | /MRSS/T_RM_CO_LEIKZ | Indicator: No remaining activity expected | ||
| 62 | /MRSS/T_RM_CO_LEIKZ | Indicator: No remaining activity expected | ||
| 63 | /MRSS/T_RM_CO_LEIKZ | Indicator: No remaining activity expected | ||
| 64 | /MRSS/T_RM_CO_LEIKZ | Indicator: No remaining activity expected | ||
| 65 | /MRSS/T_RM_CO_LEIKZ | Indicator: No remaining activity expected | ||
| 66 | /MRSS/T_RM_CO_PEDZ | Forecast finish time of operation from confirmation | ||
| 67 | /MRSS/T_RM_CO_PRZNR | Business Process | ||
| 68 | /MRSS/T_RM_CO_RUMNG | Previously confirmed activity | ||
| 69 | /MRSS/T_RM_CO_RUMNG | Previously confirmed activity | ||
| 70 | /MRSS/T_RM_CO_RUMNG | Previously confirmed activity | ||
| 71 | /MRSS/T_RM_CO_RUMNG | Previously confirmed activity | ||
| 72 | /MRSS/T_RM_CO_RUMNG | Previously confirmed activity | ||
| 73 | /MRSS/T_RM_CO_RUMNG | Previously confirmed activity | ||
| 74 | /MRSS/T_RM_CO_SCHAETZ | Forecast value used to update the standard value | ||
| 75 | /MRSS/T_RM_CO_SCHAETZ | Forecast value used to update the standard value | ||
| 76 | /MRSS/T_RM_CO_SCHAETZ | Forecast value used to update the standard value | ||
| 77 | /MRSS/T_RM_CO_SCHAETZ | Forecast value used to update the standard value | ||
| 78 | /MRSS/T_RM_CO_SCHAETZ | Forecast value used to update the standard value | ||
| 79 | /MRSS/T_RM_CO_SCHAETZ | Forecast value used to update the standard value | ||
| 80 | /MRSS/T_RM_CO_SELKZ | Selection indicator for costing line items | ||
| 81 | /MRSS/T_RM_CP_OBZOFFB | Reference date for start of sub-operation | ||
| 82 | /MRSS/T_RM_CP_OBZOFFE | Reference date for finish of sub-operation | ||
| 83 | /MRSS/T_RM_CP_OEHOFFB | Unit for offset to start | ||
| 84 | /MRSS/T_RM_CP_OEHOFFE | Unit for offset to finish | ||
| 85 | /MRSS/T_RM_CP_OOFFSTB | Offset to sub-operation start | ||
| 86 | /MRSS/T_RM_CP_OOFFSTE | Offset to sub-operation finish | ||
| 87 | /MRSS/T_RM_CP_UMREN | Denominator for converting rtg and op units of measure | ||
| 88 | /MRSS/T_RM_CP_UMREZ | Numerator for converting task list and oper. un. of measure | ||
| 89 | /MRSS/T_RM_CR_OBJID | Object ID of the resource | ||
| 90 | /MRSS/T_RM_CR_OBJID_I | Actual operating resources object identification | ||
| 91 | /MRSS/T_RM_CR_PDEST | Printer for shop papers | ||
| 92 | /MRSS/T_RM_CR_RS_ANZ | Number of confirmation slips | ||
| 93 | /MRSS/T_RM_CS_ITMID | External identification of an item | ||
| 94 | /MRSS/T_RM_CY_SEQNRV | Sequence number operation | ||
| 95 | /MRSS/T_RM_DEM_COUNT | Counter for Demands in Operation | ||
| 96 | /MRSS/T_RM_DKCHG | Ind. : Document assignment to material component changed | ||
| 97 | /MRSS/T_RM_DZCODE | Reference number for standard value code | ||
| 98 | /MRSS/T_RM_DZEIER | Unit for the break time | ||
| 99 | /MRSS/T_RM_DZEILM | Unit for the maximum wait time | ||
| 100 | /MRSS/T_RM_DZEILP | Unit for the required wait time | ||
| 101 | /MRSS/T_RM_DZEIMB | Unit for the minimum processing time | ||
| 102 | /MRSS/T_RM_DZEIMU | Unit for the minimum overlap time | ||
| 103 | /MRSS/T_RM_DZEITM | Unit for the minimum move time | ||
| 104 | /MRSS/T_RM_DZEITN | Unit for the standard move time | ||
| 105 | /MRSS/T_RM_DZEIWM | Unit for the minumum queue time | ||
| 106 | /MRSS/T_RM_DZEIWN | Unit for the standard queue time | ||
| 107 | /MRSS/T_RM_DZERMA | Type of standard value calculation | ||
| 108 | /MRSS/T_RM_DZGDAT | Date when the standard value was calculated | ||
| 109 | /MRSS/T_RM_DZLMAX | Maximum wait time | ||
| 110 | /MRSS/T_RM_DZLPRO | Minimum wait time | ||
| 111 | /MRSS/T_RM_DZMERH | Break | ||
| 112 | /MRSS/T_RM_DZMINB | Minimum processing time | ||
| 113 | /MRSS/T_RM_DZMINU | Minimum overlap time | ||
| 114 | /MRSS/T_RM_DZTMIN | Minimum move time | ||
| 115 | /MRSS/T_RM_DZTNOR | Standard move time | ||
| 116 | /MRSS/T_RM_DZULNR | Basis for standard value calculation | ||
| 117 | /MRSS/T_RM_DZWMIN | Minimum queue time | ||
| 118 | /MRSS/T_RM_DZWNOR | Standard queue time | ||
| 119 | /MRSS/T_RM_EBORT | Installation Point for Subitem | ||
| 120 | /MRSS/T_RM_EPANF | Dispatched start date for operation | ||
| 121 | /MRSS/T_RM_EPANZ | Dispatched start time for operation | ||
| 122 | /MRSS/T_RM_EPEND | Dispatched finish date | ||
| 123 | /MRSS/T_RM_EPENZ | Dispatched finish time | ||
| 124 | /MRSS/T_RM_ESCALATION_NW | Escalation Reason - Role | ||
| 125 | /MRSS/T_RM_EV_WEIGHTD | Aggregation weight for POC (PS progress) | ||
| 126 | /MRSS/T_RM_FE_IND | Regulatory indicator | ||
| 127 | /MRSS/T_RM_FLAG_NW | Indicator | ||
| 128 | /MRSS/T_RM_FLAG_NW | Indicator | ||
| 129 | /MRSS/T_RM_FLAG_NW | Indicator | ||
| 130 | /MRSS/T_RM_FLAG_NW | Indicator | ||
| 131 | /MRSS/T_RM_FLAG_NW | Indicator | ||
| 132 | /MRSS/T_RM_FLAG_NW | Indicator | ||
| 133 | /MRSS/T_RM_FLAG_NW | Indicator | ||
| 134 | /MRSS/T_RM_FLAG_NW | Indicator | ||
| 135 | /MRSS/T_RM_FLEX_START_DATE | Flexible Start Date | ||
| 136 | /MRSS/T_RM_FLG_CALC | Indicator: Order (network etc.) still to be calculated | ||
| 137 | /MRSS/T_RM_FLG_PURS | Indicator: Purchase order exists | ||
| 138 | /MRSS/T_RM_FLG_VAB | Indicator: Sub-network exists | ||
| 139 | /MRSS/T_RM_FLIESSKZ | Indicator: continuous flow production | ||
| 140 | /MRSS/T_RM_FOLGENART | Sequence category | ||
| 141 | /MRSS/T_RM_FORDP | Item of framework order | ||
| 142 | /MRSS/T_RM_FRSP | Earliest possible activity / Latest possible activity | ||
| 143 | /MRSS/T_RM_FRUNV | Indicator: External procurement data incomplete | ||
| 144 | /MRSS/T_RM_FSEDD | Earliest scheduled finish: Execution (date) | ||
| 145 | /MRSS/T_RM_FSELD | Earliest scheduled finish: Wait (date) | ||
| 146 | /MRSS/T_RM_FSELZ | Earliest scheduled finish: Wait (time) | ||
| 147 | /MRSS/T_RM_FSSAD | Earliest scheduled start: Teardown (date) | ||
| 148 | /MRSS/T_RM_FSSAZ | Earliest scheduled start: Teardown (time) | ||
| 149 | /MRSS/T_RM_FSSBD | Earliest scheduled start: Processing (date) | ||
| 150 | /MRSS/T_RM_FSSBZ | Earliest scheduled start: Processing (time) | ||
| 151 | /MRSS/T_RM_FSSLD | Earliest scheduled start: Wait (date) | ||
| 152 | /MRSS/T_RM_FSSLZ | Earliest scheduled start: Wait (time) | ||
| 153 | /MRSS/T_RM_GMNGA | Confirmed yield in order unit of measure | ||
| 154 | /MRSS/T_RM_GRUND | Reason for manual valuation of net assets | ||
| 155 | /MRSS/T_RM_IEAVD | Actual finish of operation (date) | ||
| 156 | /MRSS/T_RM_IEBD | Actual finish: Processing(date) | ||
| 157 | /MRSS/T_RM_IEBZ | Actual processing finish (time) | ||
| 158 | /MRSS/T_RM_IEDD | Actual finish: Execution (date) | ||
| 159 | /MRSS/T_RM_IEDZ | Actual finish: Execution (time) | ||
| 160 | /MRSS/T_RM_IERD | Actual finish: Setup (date) | ||
| 161 | /MRSS/T_RM_IERZ | Actual finish: Setup (time) | ||
| 162 | /MRSS/T_RM_IMMEDIATE_REQ_NW | Consultant required in 24 hours | ||
| 163 | /MRSS/T_RM_IND | Nearshore/Offshore Indicator | ||
| 164 | /MRSS/T_RM_INDET | Key for calculation | ||
| 165 | /MRSS/T_RM_INIT_DONE | Internal Initialization Carried Out Once | ||
| 166 | /MRSS/T_RM_ISAD | Actual start: Teardown (date) | ||
| 167 | /MRSS/T_RM_ISAVD | Actual operation start (date) | ||
| 168 | /MRSS/T_RM_ISAZ | Actual start: Teardown (time) | ||
| 169 | /MRSS/T_RM_ISBD | Actual start: Processing (date) | ||
| 170 | /MRSS/T_RM_ISBZ | Actual start: Processing (time) | ||
| 171 | /MRSS/T_RM_ISDD | Actual start: Execution (date) | ||
| 172 | /MRSS/T_RM_ISDZ | Actual start: Execution/setup (time) | ||
| 173 | /MRSS/T_RM_ISERH | Confirmed break time | ||
| 174 | /MRSS/T_RM_ISTRU | Assembly | ||
| 175 | /MRSS/T_RM_JV_JIBCL | JIB/JIBE Class | ||
| 176 | /MRSS/T_RM_JV_JIBSA | JIB/JIBE Subclass A | ||
| 177 | /MRSS/T_RM_JV_OR_CO | JV original cost object | ||
| 178 | /MRSS/T_RM_JV_OTYPE | Joint Venture Object Type | ||
| 179 | /MRSS/T_RM_KAPT_PUFFR | Operation floats after finite scheduling (in seconds) | ||
| 180 | /MRSS/T_RM_KNOTE | Transportation Connection Points | ||
| 181 | /MRSS/T_RM_KRATE_NW | K-rate | ||
| 182 | /MRSS/T_RM_KTSCH | Standard text key | ||
| 183 | /MRSS/T_RM_KZKFG | Configurable Material | ||
| 184 | /MRSS/T_RM_KZLGF | Indicator: fixed lot external processing | ||
| 185 | /MRSS/T_RM_KZWRTF | Indicator: Fixed price for external processing | ||
| 186 | /MRSS/T_RM_LANGUAGE_NW | Language(s) | ||
| 187 | /MRSS/T_RM_LATEST_FEEDBCK_DATE | Latest Feedback date | ||
| 188 | /MRSS/T_RM_LD_TAKT | takt within a line segment | ||
| 189 | /MRSS/T_RM_LEKNW | Indicator: No Remaining Work Expected | ||
| 190 | /MRSS/T_RM_LIEGEZEIT | Wait time used for scheduling | ||
| 191 | /MRSS/T_RM_LIGZE | Unit of measure for wait time | ||
| 192 | /MRSS/T_RM_LMNGA | Total Yield Confirmed | ||
| 193 | /MRSS/T_RM_LOCATION_NW | Project Location | ||
| 194 | /MRSS/T_RM_LOHNANZ | Number of Time Tickets | ||
| 195 | /MRSS/T_RM_LOHNGRP | Wage group | ||
| 196 | /MRSS/T_RM_LTXA1 | Operation short text | ||
| 197 | /MRSS/T_RM_LTXA2 | Second line of the description | ||
| 198 | /MRSS/T_RM_MAT_PRKST | Material planning in networks: primary costs | ||
| 199 | /MRSS/T_RM_MDCI_VERSION_NW | Version Number | ||
| 200 | /MRSS/T_RM_MEPROFILE | External Procurement Profile | ||
| 201 | /MRSS/T_RM_MGVRG | Operation Quantity | ||
| 202 | /MRSS/T_RM_MINWEI | Minimum Send-Ahead Quantity | ||
| 203 | /MRSS/T_RM_NETZKONT | Indicator for the account assignment of a network(hdr/act.) | ||
| 204 | /MRSS/T_RM_NO_DISP_PLUS | Effective for Materials Planning | ||
| 205 | /MRSS/T_RM_NUMBER_DAYS_NW | Number of days per week (Working Ratio) | ||
| 206 | /MRSS/T_RM_OCM_CH_PROC | Process that has lead to the change of an object | ||
| 207 | /MRSS/T_RM_OCM_COMP_RES | OCM: Result of comparison of two order objects | ||
| 208 | /MRSS/T_RM_OCM_OBJ_TYPE | Change indicator | ||
| 209 | /MRSS/T_RM_OPRE1 | Unit for remaining quantity of business process | ||
| 210 | /MRSS/T_RM_OPRZ1 | Remaining quantity for business process | ||
| 211 | /MRSS/T_RM_ORDER_PROB | Order Probability ID | ||
| 212 | /MRSS/T_RM_ORDER_PROB_NW | Order Probability | ||
| 213 | /MRSS/T_RM_OWAERS | Object currency for network activity | ||
| 214 | /MRSS/T_RM_PBEARZEIT | Processing time (forecast) | ||
| 215 | /MRSS/T_RM_PHFLG | Indicator: Phase | ||
| 216 | /MRSS/T_RM_PHSEQ | Control Recipe Destination | ||
| 217 | /MRSS/T_RM_PLIFZ | Planned Delivery Time in Days | ||
| 218 | /MRSS/T_RM_PLNAL | Group Counter | ||
| 219 | /MRSS/T_RM_PLNFOLGE | Sequence | ||
| 220 | /MRSS/T_RM_PLNKN | Number of the task list node | ||
| 221 | /MRSS/T_RM_PLNNR | Key for Task List Group | ||
| 222 | /MRSS/T_RM_PRIORITAET | Priority | ||
| 223 | /MRSS/T_RM_PROD_ACT | Indicator: Activity is a production activity | ||
| 224 | /MRSS/T_RM_PROJECT_ACTIVITY_NW | Project Activity types | ||
| 225 | /MRSS/T_RM_PROJECT_PHASE_NW | Project Phase | ||
| 226 | /MRSS/T_RM_PROJ_COUNTRY_NW | Project Country | ||
| 227 | /MRSS/T_RM_PSTXCHG | Ind.: Changed PS text | ||
| 228 | /MRSS/T_RM_PS_SPS_ELE | Standard WBS element | ||
| 229 | /MRSS/T_RM_QEIFSUBSYS | Subsystem Identifier for QM Subsystem Interface | ||
| 230 | /MRSS/T_RM_QERFSICHT | Recording View | ||
| 231 | /MRSS/T_RM_QKZFEAT | Indicator Is Not Used Currently | ||
| 232 | /MRSS/T_RM_QKZPRFREI | Interval Without Reference to Time or Quantity | ||
| 233 | /MRSS/T_RM_QKZPRMENG | Creation Cycle = Quantity (Quantity-Reference) | ||
| 234 | /MRSS/T_RM_QKZPRZEIT | Interval = Time (Time-Related) | ||
| 235 | /MRSS/T_RM_QKZTLSBEST | Operation with Stock-Related Partial Lot Assignment | ||
| 236 | /MRSS/T_RM_QKZZTMG1 | Quantity Confirmation for Each Partial Lot | ||
| 237 | /MRSS/T_RM_QL_KAPART | Capacity category | ||
| 238 | /MRSS/T_RM_QPART | Inspection Type | ||
| 239 | /MRSS/T_RM_QPPKTABS | Flow Variants for Inspection Point Completion | ||
| 240 | /MRSS/T_RM_QRASTEREH | Grid Unit of Measure | ||
| 241 | /MRSS/T_RM_QRASTMENG | Quantity Between Two Inspections | ||
| 242 | /MRSS/T_RM_QRASTZEHT | Time Unit | ||
| 243 | /MRSS/T_RM_QRASTZFAK | Time Factor | ||
| 244 | /MRSS/T_RM_QUALF | Suitability | ||
| 245 | /MRSS/T_RM_RAP_SUPERVISOR_CNT | Number of Site Supervisors | ||
| 246 | /MRSS/T_RM_REASON_CLOSE_NW | Closed Reason | ||
| 247 | /MRSS/T_RM_RELEVANT_FOR_MRS | Operation Set as MRS-Relevant | ||
| 248 | /MRSS/T_RM_REMOTE_NW | Remote possible | ||
| 249 | /MRSS/T_RM_REM_EFFORT_RES_CNT | Determination of Remaining Demand: No. of Resources | ||
| 250 | /MRSS/T_RM_REQUEST_LOB_NW | Requester Line of Business | ||
| 251 | /MRSS/T_RM_REQU_UPD | Requirements Profile Was Changed Manually | ||
| 252 | /MRSS/T_RM_REQ_PARTNER | Requested Partner | ||
| 253 | /MRSS/T_RM_RMNGA | Total confirmed rework quantity | ||
| 254 | /MRSS/T_RM_ROLE_CATEGORY | Role Category | ||
| 255 | /MRSS/T_RM_ROLE_TYPE_NW | Role Type | ||
| 256 | /MRSS/T_RM_RO_GROUP_ROLE_NW | Role Owner Group - Role | ||
| 257 | /MRSS/T_RM_RSG_BOOLEAN | Boolean Variable | ||
| 258 | /MRSS/T_RM_RSG_BOOLEAN | Boolean Variable | ||
| 259 | /MRSS/T_RM_RSG_REQUID | Profile key | ||
| 260 | /MRSS/T_RM_RSG_TEAM_PLANNING | Team Planning flag for Demand | ||
| 261 | /MRSS/T_RM_RSG_TIME_RULE_ID | Time Rule Id | ||
| 262 | /MRSS/T_RM_RSTRA | Reduction strategy per operation/activity | ||
| 263 | /MRSS/T_RM_RSTUF | Reduction level which reduces operation lead time | ||
| 264 | /MRSS/T_RM_RSTZE | Unit of measure for setup time | ||
| 265 | /MRSS/T_RM_RUEARSCHLU | Setup Type Key | ||
| 266 | /MRSS/T_RM_RUEFAGRP | Setup group category | ||
| 267 | /MRSS/T_RM_RUEFASCHLU | Setup group key | ||
| 268 | /MRSS/T_RM_RUEST | Setup time | ||
| 269 | /MRSS/T_RM_RU_IPRZE | Unit of measurement for conf. quantity for business process | ||
| 270 | /MRSS/T_RM_RU_IPRZK | No remaining quantity expected for business process | ||
| 271 | /MRSS/T_RM_RWFAK | Rework factor (is not used yet) | ||
| 272 | /MRSS/T_RM_SCEND_ACT | Ind.: Purchase requisition at activity finish date | ||
| 273 | /MRSS/T_RM_SCOPE_CV | Object Class | ||
| 274 | /MRSS/T_RM_SERV_PHASE_NW | Resource Management Service Phase | ||
| 275 | /MRSS/T_RM_SFORDN | Framework Order | ||
| 276 | /MRSS/T_RM_SLA_EXCLUDE_NW | Reason code for Exclude from SLA | ||
| 277 | /MRSS/T_RM_SORTI | Sort Term for Non-Stock Info Records | ||
| 278 | /MRSS/T_RM_SPARAMETER | Scheduling Parameters for External Scheduling | ||
| 279 | /MRSS/T_RM_SPARAMETER | Scheduling Parameters for External Scheduling | ||
| 280 | /MRSS/T_RM_SPARAMETER | Scheduling Parameters for External Scheduling | ||
| 281 | /MRSS/T_RM_SPLITTANZ | Maximum number of splits | ||
| 282 | /MRSS/T_RM_SPLITTERM | Actual number of splits | ||
| 283 | /MRSS/T_RM_SPLITTUNG | Required splitting | ||
| 284 | /MRSS/T_RM_SPLIT_QTY | Split quantity in the order split | ||
| 285 | /MRSS/T_RM_SSELD | Latest scheduled finish: Wait time (date) | ||
| 286 | /MRSS/T_RM_SSELZ | Latest scheduled finish: Wait time | ||
| 287 | /MRSS/T_RM_SSSAD | Latest scheduled start: Teardown (date) | ||
| 288 | /MRSS/T_RM_SSSAZ | Latest scheduled start: Teardown (time) | ||
| 289 | /MRSS/T_RM_SSSBD | Latest scheduled start: Processing (date) | ||
| 290 | /MRSS/T_RM_SSSBZ | Latest scheduled start: Processing (time) | ||
| 291 | /MRSS/T_RM_SSSLD | Latest scheduled start: Wait time (date) | ||
| 292 | /MRSS/T_RM_SSSLZ | Latest scheduled start: Wait time | ||
| 293 | /MRSS/T_RM_STATUS_IND_NW | STATUS Indicator | ||
| 294 | /MRSS/T_RM_STDKN | Node of operation within reference operation set | ||
| 295 | /MRSS/T_RM_STEUS | Control key | ||
| 296 | /MRSS/T_RM_STLKN | BOM item node number | ||
| 297 | /MRSS/T_RM_STLTY | BOM category | ||
| 298 | /MRSS/T_RM_STLTY | BOM category | ||
| 299 | /MRSS/T_RM_STNUM | Bill of material | ||
| 300 | /MRSS/T_RM_SUMKNTNR | Node number of the superior operation | ||
| 301 | /MRSS/T_RM_SYSTEM_INFO_NW | System Info | ||
| 302 | /MRSS/T_RM_TABIX_D | Field defined as in SY-TABIX | ||
| 303 | /MRSS/T_RM_TIMESTAMP_BEGIN | Time Stamp: Start | ||
| 304 | /MRSS/T_RM_TIMESTAMP_BEGIN | Time Stamp: Start | ||
| 305 | /MRSS/T_RM_TIMESTAMP_END | Time stamp: end | ||
| 306 | /MRSS/T_RM_TIMESTAMP_END | Time stamp: end | ||
| 307 | /MRSS/T_RM_TRANSZEIT | Move time used for scheduling | ||
| 308 | /MRSS/T_RM_TRAZE | Unitof measure for move time | ||
| 309 | /MRSS/T_RM_TXCHG | Indicator: long text changed | ||
| 310 | /MRSS/T_RM_TXTKY | Internal text number (12-character) | ||
| 311 | /MRSS/T_RM_UEKANKZ | Optional overlapping | ||
| 312 | /MRSS/T_RM_UEMUSKZ | Required overlapping | ||
| 313 | /MRSS/T_RM_UPOSZ | Subitem Number | ||
| 314 | /MRSS/T_RM_USCREENCTL_DATACHGD | Data Was Changed in the Controls on the User Screen | ||
| 315 | /MRSS/T_RM_VBKZ | Update Indicator | ||
| 316 | /MRSS/T_RM_VGWRT | Standard Value | ||
| 317 | /MRSS/T_RM_VGWRT | Standard Value | ||
| 318 | /MRSS/T_RM_VGWRT | Standard Value | ||
| 319 | /MRSS/T_RM_VGWRT | Standard Value | ||
| 320 | /MRSS/T_RM_VGWRT | Standard Value | ||
| 321 | /MRSS/T_RM_VGWRT | Standard Value | ||
| 322 | /MRSS/T_RM_VGWRTEH | Unit of measure for the standard value | ||
| 323 | /MRSS/T_RM_VGWRTEH | Unit of measure for the standard value | ||
| 324 | /MRSS/T_RM_VGWRTEH | Unit of measure for the standard value | ||
| 325 | /MRSS/T_RM_VGWRTEH | Unit of measure for the standard value | ||
| 326 | /MRSS/T_RM_VGWRTEH | Unit of measure for the standard value | ||
| 327 | /MRSS/T_RM_VGWRTEH | Unit of measure for the standard value | ||
| 328 | /MRSS/T_RM_VG_EKGRP | Purchasing group for external processing | ||
| 329 | /MRSS/T_RM_VINTV | Increment between referenced operations | ||
| 330 | /MRSS/T_RM_VORGABEEND2 | Constraint for Finish of Activity (Basic) | ||
| 331 | /MRSS/T_RM_VORGSCHL | Standard value key | ||
| 332 | /MRSS/T_RM_VORNR | Role Number | ||
| 333 | /MRSS/T_RM_VPLBFL | Referenced sequence in routing | ||
| 334 | /MRSS/T_RM_VPLNAL | Group counter of the referenced task list | ||
| 335 | /MRSS/T_RM_VPLNNR | Group of the referenced task list | ||
| 336 | /MRSS/T_RM_VPLNTY | Type of the referenced task list | ||
| 337 | /MRSS/T_RM_VSINACT | Version inactive indicator | ||
| 338 | /MRSS/T_RM_VSTGA | Deadline deviation reason | ||
| 339 | /MRSS/T_RM_VSTZW | Deadline function | ||
| 340 | /MRSS/T_RM_WARTEZEIT | Queue timeQueue time used for scheduling | ||
| 341 | /MRSS/T_RM_WEMNG | Quantity of Goods Received | ||
| 342 | /MRSS/T_RM_WERKS_D | plant | ||
| 343 | /MRSS/T_RM_WERKS_I | Actual plant | ||
| 344 | /MRSS/T_RM_WKURS | Exchange Rate | ||
| 345 | /MRSS/T_RM_WTRZE | Unit of measure for queue time | ||
| 346 | /MRSS/T_RM_XCHAR | Batch management indicator (internal) | ||
| 347 | /MRSS/T_RM_XMNGA | Total scrap quantity confirmed | ||
| 348 | /MRSS/T_RM_X_KUM_PER | Cumulative Scrap Qty of Subsequent Reporting Pts (Cur. Per.) | ||
| 349 | ABLAD | Unloading Point | ||
| 350 | AENNR | Change Number | ||
| 351 | AFNAM | Name of requisitioner/requester | ||
| 352 | ANZKAP | Number of capacities required | ||
| 353 | APROZENT | Work percentage | ||
| 354 | ARBEIT | Work involved in the activity | ||
| 355 | ARBEITE | Unit for work | ||
| 356 | AUFKALSM | Costing Sheet | ||
| 357 | AUFNR | Order Number | ||
| 358 | AUFZSCHL | Overhead key | ||
| 359 | BEAZE | Unit of measure for processing time | ||
| 360 | BEDNR | Requirement Tracking Number | ||
| 361 | BSTME | Order unit | ||
| 362 | BUKRS | Company Code | ||
| 363 | CHAR1 | Single-Character Flag | ||
| 364 | CHAR1 | Single-Character Flag | ||
| 365 | CHAR10 | Character Field Length = 10 | ||
| 366 | CHAR10 | Character Field Length = 10 | ||
| 367 | CHAR19 | 19 Characters | ||
| 368 | CHAR19 | 19 Characters | ||
| 369 | CHAR3 | 3-Byte field | ||
| 370 | CHAR32 | Character field, length 32 | ||
| 371 | CIM_COUNT | Internal counter | ||
| 372 | CIM_COUNT | Internal counter | ||
| 373 | CLASF | Ind.: Take Activity Into Account for Project Summarization | ||
| 374 | CO_ISMNGEH | Unit of measure for the activity to be confirmed | ||
| 375 | CO_ISMNGEH | Unit of measure for the activity to be confirmed | ||
| 376 | CO_ISMNGEH | Unit of measure for the activity to be confirmed | ||
| 377 | CO_ISMNGEH | Unit of measure for the activity to be confirmed | ||
| 378 | CO_ISMNGEH | Unit of measure for the activity to be confirmed | ||
| 379 | CO_ISMNGEH | Unit of measure for the activity to be confirmed | ||
| 380 | CO_ISMNW | Actual work | ||
| 381 | CO_PEDD | Forecast finish date of operation from confirmation | ||
| 382 | CO_RMZHL | Confirmation counter | ||
| 383 | CO_RUECK | Completion confirmation number for the operation | ||
| 384 | CR_VERTN | Distr.cap.reqmts (plant maint.,process order, network) | ||
| 385 | CUOBJ | Configuration (internal object number) | ||
| 386 | DATS | Field of type DATS | ||
| 387 | DATS | Field of type DATS | ||
| 388 | DATS | Field of type DATS | ||
| 389 | DATS | Field of type DATS | ||
| 390 | DAUDEHN | Indicator: flexible duration | ||
| 391 | DAUMIN | Minimum activity duration | ||
| 392 | DAUMINE | Unit for the minimum duration | ||
| 393 | DAUNOR | Normal duration of the activity | ||
| 394 | DAUNORE | Normal duration/unit | ||
| 395 | EBELN | Purchasing Document Number | ||
| 396 | EBELP | Item Number of Purchasing Document | ||
| 397 | EINSCHRA | Constraint on the basic start date for the activity | ||
| 398 | EINSCHRE | Constraint on the finish date of the activity | ||
| 399 | EKORG | Purchasing organization | ||
| 400 | ESOKZ | Purchasing info record category | ||
| 401 | EWDAM | Minimum duration (from forecast) for activity | ||
| 402 | EWDAN | Normal duration (from forecast) of activity | ||
| 403 | EWDME | Unit for forecast minimum duration | ||
| 404 | EWDNE | Unit for forecast normal duration | ||
| 405 | EWENDED | Forecast finish date | ||
| 406 | EWENDEZ | Forecast finish time for the activity | ||
| 407 | EWSTARTD | Forecasted start date for the activity | ||
| 408 | EWSTARTZ | Forecast start time of the activity | ||
| 409 | FKBER | Functional Area | ||
| 410 | FPAVD | Earliest scheduled start date (forecast) | ||
| 411 | FPAVZ | Earliest scheduled start time (forecast) | ||
| 412 | FPEDD | Earliest scheduled finish date (forecast) | ||
| 413 | FPEDZ | Earliest scheduled finish time (forecast) | ||
| 414 | FPLNR | Billing plan number / invoicing plan number | ||
| 415 | FSAVD | Earliest scheduled start: Execution (date) | ||
| 416 | FSAVZ | Earliest scheduled start: Execution (time) | ||
| 417 | FSEDZ | Earliest scheduled finish: Execution (time) | ||
| 418 | GSBER | Business Area | ||
| 419 | INFNR | Number of purchasing info record | ||
| 420 | JV_NAME | Joint venture | ||
| 421 | JV_RECIND | Recovery Indicator | ||
| 422 | J_OBJNR | Object number | ||
| 423 | KNOBJ | Number of Object with Assigned Dependencies | ||
| 424 | KNTTP | Account assignment category | ||
| 425 | KONNR | Number of principal purchase agreement | ||
| 426 | KSTAR | Cost Element | ||
| 427 | KTPNR | Item number of principal purchase agreement | ||
| 428 | LIFNR | Account Number of Vendor or Creditor | ||
| 429 | LIFNR | Account Number of Vendor or Creditor | ||
| 430 | LOHNART | Wage type | ||
| 431 | LSTAR | Activity Type | ||
| 432 | LSTAR | Activity Type | ||
| 433 | LSTAR | Activity Type | ||
| 434 | LSTAR | Activity Type | ||
| 435 | LSTAR | Activity Type | ||
| 436 | LSTAR | Activity Type | ||
| 437 | LSTAR | Activity Type | ||
| 438 | MANDT | Client | ||
| 439 | MATKL | Material Group | ||
| 440 | MEINS | Base Unit of Measure | ||
| 441 | MEINS | Base Unit of Measure | ||
| 442 | MILESTONE | Usage | ||
| 443 | NW_PRIO | Priority | ||
| 444 | OBJEKTID | Object ID | ||
| 445 | OFMNW | Forecasted work (actual + remaining) | ||
| 446 | OTYPE | Object Type | ||
| 447 | PACKNO | Package number | ||
| 448 | PDAE | Unit of the forecasted duration from the confirmation | ||
| 449 | PDAU | Forecasted duration of activity from confirmation | ||
| 450 | PEINH | Price unit | ||
| 451 | PERNR_D | Personnel Number | ||
| 452 | PERNR_D | Personnel Number | ||
| 453 | PERNR_D | Personnel Number | ||
| 454 | PLNFOLGE | Sequence | ||
| 455 | PPUFF_FREI | Free float (from forecast) | ||
| 456 | PPUFF_GESM | Total float (from forecast) | ||
| 457 | PRCTR | Profit Center | ||
| 458 | PREIS | Price | ||
| 459 | PRKST | Costs in the activity | ||
| 460 | PS_PSP_ELE | Work breakdown structure element (WBS element) | ||
| 461 | PS_RESTA | Forecast date constraint on activity start | ||
| 462 | PS_RESTE | Forecast date constraint on activity finish | ||
| 463 | PUFFR_FREI | Free float | ||
| 464 | PUFFR_GESM | Total float | ||
| 465 | REGIO | Region (State, Province, County) | ||
| 466 | SELKZ | Selection flag | ||
| 467 | SLWID | Key word ID for user-defined fields | ||
| 468 | SPAVD | Latest scheduled start date (forecast) | ||
| 469 | SPAVZ | Latest scheduled start time (forecast) | ||
| 470 | SPEDD | Latest scheduled finish date (forecast) | ||
| 471 | SPEDZ | Latest scheduled finish time (forecast) | ||
| 472 | SPRAS | Language Key | ||
| 473 | SSAVD | Latest scheduled start: Execution (date) | ||
| 474 | SSAVZ | Latest scheduled start: Execution (time) | ||
| 475 | SSEDD | Latest scheduled finish: Execution (date) | ||
| 476 | SSEDZ | Latest scheduled finish: Execution (time) | ||
| 477 | TECHS | Parameter Variant/Standard Variant | ||
| 478 | TIMS | Field of type TIMS | ||
| 479 | TIMS | Field of type TIMS | ||
| 480 | TIMS | Field of type TIMS | ||
| 481 | TIMS | Field of type TIMS | ||
| 482 | TXJCD | Tax Jurisdiction | ||
| 483 | TZNTSTMPLL | Time Stamp - Long Format | ||
| 484 | TZNTSTMPLL | Time Stamp - Long Format | ||
| 485 | USRCHAR10 | User field with 10 characters | ||
| 486 | USRCHAR10 | User field with 10 characters | ||
| 487 | USRCHAR20 | User field with 20 characters | ||
| 488 | USRCHAR20 | User field with 20 characters | ||
| 489 | USRCUKY | User field: Unit for value fields | ||
| 490 | USRCUKY | User field: Unit for value fields | ||
| 491 | USRCURR13 | User-defined field for values (length 10,3) | ||
| 492 | USRCURR13 | User-defined field for values (length 10,3) | ||
| 493 | USRDATE | User field for date | ||
| 494 | USRDATE | User field for date | ||
| 495 | USRFLAG | User-defined field: Indicator for reports | ||
| 496 | USRFLAG | User-defined field: Indicator for reports | ||
| 497 | USRQUAN13 | User field for quantity (length 10.3) | ||
| 498 | USRQUAN13 | User field for quantity (length 10.3) | ||
| 499 | USRUNIT | User field: Unit for quantity fields | ||
| 500 | USRUNIT | User field: Unit for quantity fields |