Data Element list used by SAP ABAP Table /MRSS/T_RMI_ROLE_NW (Role)
SAP ABAP Table /MRSS/T_RMI_ROLE_NW (Role) is using
pages: 1 2 
# Object Type Object Name Object Description Note
     
1 Data Element  /MRSS/T_GUID GUID
2 Data Element  /MRSS/T_RM_ABLIPKZ Indicator: simultaneous teardown and wait
3 Data Element  /MRSS/T_RM_ABRUE Teardown
4 Data Element  /MRSS/T_RM_ACTIVITY_TYPE Process variant
5 Data Element  /MRSS/T_RM_ADDCOMPARE_CORE Reference Element PM/PS
6 Data Element  /MRSS/T_RM_AFAKT Execution Factor
7 Data Element  /MRSS/T_RM_ANFKO Requesting cost center
8 Data Element  /MRSS/T_RM_ANFKOKRS Controlling area of the requesting cost center
9 Data Element  /MRSS/T_RM_ANLZU Syst.Condition
10 Data Element  /MRSS/T_RM_ANZMS Number of employees
11 Data Element  /MRSS/T_RM_ARUZE Unit of measure for teardown
12 Data Element  /MRSS/T_RM_ASSIGNMENTTYPE_NW Assignment Types
13 Data Element  /MRSS/T_RM_ASVRG Operation scrap
14 Data Element  /MRSS/T_RM_AUFAEDAT_NW Change date for Order Master
15 Data Element  /MRSS/T_RM_AUFAENAM_NW Last changed by
16 Data Element  /MRSS/T_RM_AUFERFDAT_NW Created on
17 Data Element  /MRSS/T_RM_AUFERFNAM_NW Entered by
18 Data Element  /MRSS/T_RM_AUFERFNAM_NW Entered by
19 Data Element  /MRSS/T_RM_AUFLOEKZ Deletion flag
20 Data Element  /MRSS/T_RM_AUMNG Scrap quantity
21 Data Element  /MRSS/T_RM_AUMNG Scrap quantity
22 Data Element  /MRSS/T_RM_AUSCHUFAK Scrap factor
23 Data Element  /MRSS/T_RM_BAGRP Assembly
24 Data Element  /MRSS/T_RM_BAUGR Material number of higher-level assembly
25 Data Element  /MRSS/T_RM_BEARZEIT Processing time
26 Data Element  /MRSS/T_RM_BEAZEP Unit of processing time (Forecast)
27 Data Element  /MRSS/T_RM_BEDID ID of the capacity requirements record
28 Data Element  /MRSS/T_RM_BILLING_OBJ_TYPE_NW Billing Object Type
29 Data Element  /MRSS/T_RM_BILLING_RATE Billing rate to Customer - Amount
30 Data Element  /MRSS/T_RM_BILLING_RATE_UNT_NW Billing Rate Unit (hour or day)
31 Data Element  /MRSS/T_RM_BILL_OBJ SO/IO/CC Number
32 Data Element  /MRSS/T_RM_BMSCH Base Quantity
33 Data Element  /MRSS/T_RM_BUDGET_NW Budget
34 Data Element  /MRSS/T_RM_CALC_COST_RATE Calculated Cost Rate
35 Data Element  /MRSS/T_RM_CANDIDATESUMMARY_NW Candidate Summary
36 Data Element  /MRSS/T_RM_CIM_COUNT Internal counter
37 Data Element  /MRSS/T_RM_CK_KALNR Cost Estimate Number for Cost Est. w/o Qty Structure
38 Data Element  /MRSS/T_RM_CK_KLVAR Costing Variant
39 Data Element  /MRSS/T_RM_CN_AUTH Ind.: Authorization exists
40 Data Element  /MRSS/T_RM_CN_AUTH Ind.: Authorization exists
41 Data Element  /MRSS/T_RM_CN_AUTH Ind.: Authorization exists
42 Data Element  /MRSS/T_RM_CN_AUTH Ind.: Authorization exists
43 Data Element  /MRSS/T_RM_CN_AUTH Ind.: Authorization exists
44 Data Element  /MRSS/T_RM_CN_AUTH Ind.: Authorization exists
45 Data Element  /MRSS/T_RM_CN_AUTH Ind.: Authorization exists
46 Data Element  /MRSS/T_RM_CN_KZFIX Indicator: Purchasing info record data are fixed
47 Data Element  /MRSS/T_RM_CN_RFPNT Reference point for BOM transfer
48 Data Element  /MRSS/T_RM_CN_RPIP Reference Point for Relationship Between iPPE and PS
49 Data Element  /MRSS/T_RM_CO_APLZL General counter for order
50 Data Element  /MRSS/T_RM_CO_APLZL General counter for order
51 Data Element  /MRSS/T_RM_CO_APLZL General counter for order
52 Data Element  /MRSS/T_RM_CO_AUFPL Routing number of operations in the order
53 Data Element  /MRSS/T_RM_CO_AUFPL Routing number of operations in the order
54 Data Element  /MRSS/T_RM_CO_BANFN Purchase requisition number
55 Data Element  /MRSS/T_RM_CO_BANFN Purchase requisition number
56 Data Element  /MRSS/T_RM_CO_BNFPO Item number of the purchase requisition in the order
57 Data Element  /MRSS/T_RM_CO_BNFPO Item number of the purchase requisition in the order
58 Data Element  /MRSS/T_RM_CO_FRDLB Indicator: Externally processed op. with subcontracting
59 Data Element  /MRSS/T_RM_CO_IPRZS Confirmed quantity/work for business process
60 Data Element  /MRSS/T_RM_CO_LEIKZ Indicator: No remaining activity expected
61 Data Element  /MRSS/T_RM_CO_LEIKZ Indicator: No remaining activity expected
62 Data Element  /MRSS/T_RM_CO_LEIKZ Indicator: No remaining activity expected
63 Data Element  /MRSS/T_RM_CO_LEIKZ Indicator: No remaining activity expected
64 Data Element  /MRSS/T_RM_CO_LEIKZ Indicator: No remaining activity expected
65 Data Element  /MRSS/T_RM_CO_LEIKZ Indicator: No remaining activity expected
66 Data Element  /MRSS/T_RM_CO_PEDZ Forecast finish time of operation from confirmation
67 Data Element  /MRSS/T_RM_CO_PRZNR Business Process
68 Data Element  /MRSS/T_RM_CO_RUMNG Previously confirmed activity
69 Data Element  /MRSS/T_RM_CO_RUMNG Previously confirmed activity
70 Data Element  /MRSS/T_RM_CO_RUMNG Previously confirmed activity
71 Data Element  /MRSS/T_RM_CO_RUMNG Previously confirmed activity
72 Data Element  /MRSS/T_RM_CO_RUMNG Previously confirmed activity
73 Data Element  /MRSS/T_RM_CO_RUMNG Previously confirmed activity
74 Data Element  /MRSS/T_RM_CO_SCHAETZ Forecast value used to update the standard value
75 Data Element  /MRSS/T_RM_CO_SCHAETZ Forecast value used to update the standard value
76 Data Element  /MRSS/T_RM_CO_SCHAETZ Forecast value used to update the standard value
77 Data Element  /MRSS/T_RM_CO_SCHAETZ Forecast value used to update the standard value
78 Data Element  /MRSS/T_RM_CO_SCHAETZ Forecast value used to update the standard value
79 Data Element  /MRSS/T_RM_CO_SCHAETZ Forecast value used to update the standard value
80 Data Element  /MRSS/T_RM_CO_SELKZ Selection indicator for costing line items
81 Data Element  /MRSS/T_RM_CP_OBZOFFB Reference date for start of sub-operation
82 Data Element  /MRSS/T_RM_CP_OBZOFFE Reference date for finish of sub-operation
83 Data Element  /MRSS/T_RM_CP_OEHOFFB Unit for offset to start
84 Data Element  /MRSS/T_RM_CP_OEHOFFE Unit for offset to finish
85 Data Element  /MRSS/T_RM_CP_OOFFSTB Offset to sub-operation start
86 Data Element  /MRSS/T_RM_CP_OOFFSTE Offset to sub-operation finish
87 Data Element  /MRSS/T_RM_CP_UMREN Denominator for converting rtg and op units of measure
88 Data Element  /MRSS/T_RM_CP_UMREZ Numerator for converting task list and oper. un. of measure
89 Data Element  /MRSS/T_RM_CR_OBJID Object ID of the resource
90 Data Element  /MRSS/T_RM_CR_OBJID_I Actual operating resources object identification
91 Data Element  /MRSS/T_RM_CR_PDEST Printer for shop papers
92 Data Element  /MRSS/T_RM_CR_RS_ANZ Number of confirmation slips
93 Data Element  /MRSS/T_RM_CS_ITMID External identification of an item
94 Data Element  /MRSS/T_RM_CY_SEQNRV Sequence number operation
95 Data Element  /MRSS/T_RM_DEM_COUNT Counter for Demands in Operation
96 Data Element  /MRSS/T_RM_DKCHG Ind. : Document assignment to material component changed
97 Data Element  /MRSS/T_RM_DZCODE Reference number for standard value code
98 Data Element  /MRSS/T_RM_DZEIER Unit for the break time
99 Data Element  /MRSS/T_RM_DZEILM Unit for the maximum wait time
100 Data Element  /MRSS/T_RM_DZEILP Unit for the required wait time
101 Data Element  /MRSS/T_RM_DZEIMB Unit for the minimum processing time
102 Data Element  /MRSS/T_RM_DZEIMU Unit for the minimum overlap time
103 Data Element  /MRSS/T_RM_DZEITM Unit for the minimum move time
104 Data Element  /MRSS/T_RM_DZEITN Unit for the standard move time
105 Data Element  /MRSS/T_RM_DZEIWM Unit for the minumum queue time
106 Data Element  /MRSS/T_RM_DZEIWN Unit for the standard queue time
107 Data Element  /MRSS/T_RM_DZERMA Type of standard value calculation
108 Data Element  /MRSS/T_RM_DZGDAT Date when the standard value was calculated
109 Data Element  /MRSS/T_RM_DZLMAX Maximum wait time
110 Data Element  /MRSS/T_RM_DZLPRO Minimum wait time
111 Data Element  /MRSS/T_RM_DZMERH Break
112 Data Element  /MRSS/T_RM_DZMINB Minimum processing time
113 Data Element  /MRSS/T_RM_DZMINU Minimum overlap time
114 Data Element  /MRSS/T_RM_DZTMIN Minimum move time
115 Data Element  /MRSS/T_RM_DZTNOR Standard move time
116 Data Element  /MRSS/T_RM_DZULNR Basis for standard value calculation
117 Data Element  /MRSS/T_RM_DZWMIN Minimum queue time
118 Data Element  /MRSS/T_RM_DZWNOR Standard queue time
119 Data Element  /MRSS/T_RM_EBORT Installation Point for Subitem
120 Data Element  /MRSS/T_RM_EPANF Dispatched start date for operation
121 Data Element  /MRSS/T_RM_EPANZ Dispatched start time for operation
122 Data Element  /MRSS/T_RM_EPEND Dispatched finish date
123 Data Element  /MRSS/T_RM_EPENZ Dispatched finish time
124 Data Element  /MRSS/T_RM_ESCALATION_NW Escalation Reason - Role
125 Data Element  /MRSS/T_RM_EV_WEIGHTD Aggregation weight for POC (PS progress)
126 Data Element  /MRSS/T_RM_FE_IND Regulatory indicator
127 Data Element  /MRSS/T_RM_FLAG_NW Indicator
128 Data Element  /MRSS/T_RM_FLAG_NW Indicator
129 Data Element  /MRSS/T_RM_FLAG_NW Indicator
130 Data Element  /MRSS/T_RM_FLAG_NW Indicator
131 Data Element  /MRSS/T_RM_FLAG_NW Indicator
132 Data Element  /MRSS/T_RM_FLAG_NW Indicator
133 Data Element  /MRSS/T_RM_FLAG_NW Indicator
134 Data Element  /MRSS/T_RM_FLAG_NW Indicator
135 Data Element  /MRSS/T_RM_FLEX_START_DATE Flexible Start Date
136 Data Element  /MRSS/T_RM_FLG_CALC Indicator: Order (network etc.) still to be calculated
137 Data Element  /MRSS/T_RM_FLG_PURS Indicator: Purchase order exists
138 Data Element  /MRSS/T_RM_FLG_VAB Indicator: Sub-network exists
139 Data Element  /MRSS/T_RM_FLIESSKZ Indicator: continuous flow production
140 Data Element  /MRSS/T_RM_FOLGENART Sequence category
141 Data Element  /MRSS/T_RM_FORDP Item of framework order
142 Data Element  /MRSS/T_RM_FRSP Earliest possible activity / Latest possible activity
143 Data Element  /MRSS/T_RM_FRUNV Indicator: External procurement data incomplete
144 Data Element  /MRSS/T_RM_FSEDD Earliest scheduled finish: Execution (date)
145 Data Element  /MRSS/T_RM_FSELD Earliest scheduled finish: Wait (date)
146 Data Element  /MRSS/T_RM_FSELZ Earliest scheduled finish: Wait (time)
147 Data Element  /MRSS/T_RM_FSSAD Earliest scheduled start: Teardown (date)
148 Data Element  /MRSS/T_RM_FSSAZ Earliest scheduled start: Teardown (time)
149 Data Element  /MRSS/T_RM_FSSBD Earliest scheduled start: Processing (date)
150 Data Element  /MRSS/T_RM_FSSBZ Earliest scheduled start: Processing (time)
151 Data Element  /MRSS/T_RM_FSSLD Earliest scheduled start: Wait (date)
152 Data Element  /MRSS/T_RM_FSSLZ Earliest scheduled start: Wait (time)
153 Data Element  /MRSS/T_RM_GMNGA Confirmed yield in order unit of measure
154 Data Element  /MRSS/T_RM_GRUND Reason for manual valuation of net assets
155 Data Element  /MRSS/T_RM_IEAVD Actual finish of operation (date)
156 Data Element  /MRSS/T_RM_IEBD Actual finish: Processing(date)
157 Data Element  /MRSS/T_RM_IEBZ Actual processing finish (time)
158 Data Element  /MRSS/T_RM_IEDD Actual finish: Execution (date)
159 Data Element  /MRSS/T_RM_IEDZ Actual finish: Execution (time)
160 Data Element  /MRSS/T_RM_IERD Actual finish: Setup (date)
161 Data Element  /MRSS/T_RM_IERZ Actual finish: Setup (time)
162 Data Element  /MRSS/T_RM_IMMEDIATE_REQ_NW Consultant required in 24 hours
163 Data Element  /MRSS/T_RM_IND Nearshore/Offshore Indicator
164 Data Element  /MRSS/T_RM_INDET Key for calculation
165 Data Element  /MRSS/T_RM_INIT_DONE Internal Initialization Carried Out Once
166 Data Element  /MRSS/T_RM_ISAD Actual start: Teardown (date)
167 Data Element  /MRSS/T_RM_ISAVD Actual operation start (date)
168 Data Element  /MRSS/T_RM_ISAZ Actual start: Teardown (time)
169 Data Element  /MRSS/T_RM_ISBD Actual start: Processing (date)
170 Data Element  /MRSS/T_RM_ISBZ Actual start: Processing (time)
171 Data Element  /MRSS/T_RM_ISDD Actual start: Execution (date)
172 Data Element  /MRSS/T_RM_ISDZ Actual start: Execution/setup (time)
173 Data Element  /MRSS/T_RM_ISERH Confirmed break time
174 Data Element  /MRSS/T_RM_ISTRU Assembly
175 Data Element  /MRSS/T_RM_JV_JIBCL JIB/JIBE Class
176 Data Element  /MRSS/T_RM_JV_JIBSA JIB/JIBE Subclass A
177 Data Element  /MRSS/T_RM_JV_OR_CO JV original cost object
178 Data Element  /MRSS/T_RM_JV_OTYPE Joint Venture Object Type
179 Data Element  /MRSS/T_RM_KAPT_PUFFR Operation floats after finite scheduling (in seconds)
180 Data Element  /MRSS/T_RM_KNOTE Transportation Connection Points
181 Data Element  /MRSS/T_RM_KRATE_NW K-rate
182 Data Element  /MRSS/T_RM_KTSCH Standard text key
183 Data Element  /MRSS/T_RM_KZKFG Configurable Material
184 Data Element  /MRSS/T_RM_KZLGF Indicator: fixed lot external processing
185 Data Element  /MRSS/T_RM_KZWRTF Indicator: Fixed price for external processing
186 Data Element  /MRSS/T_RM_LANGUAGE_NW Language(s)
187 Data Element  /MRSS/T_RM_LATEST_FEEDBCK_DATE Latest Feedback date
188 Data Element  /MRSS/T_RM_LD_TAKT takt within a line segment
189 Data Element  /MRSS/T_RM_LEKNW Indicator: No Remaining Work Expected
190 Data Element  /MRSS/T_RM_LIEGEZEIT Wait time used for scheduling
191 Data Element  /MRSS/T_RM_LIGZE Unit of measure for wait time
192 Data Element  /MRSS/T_RM_LMNGA Total Yield Confirmed
193 Data Element  /MRSS/T_RM_LOCATION_NW Project Location
194 Data Element  /MRSS/T_RM_LOHNANZ Number of Time Tickets
195 Data Element  /MRSS/T_RM_LOHNGRP Wage group
196 Data Element  /MRSS/T_RM_LTXA1 Operation short text
197 Data Element  /MRSS/T_RM_LTXA2 Second line of the description
198 Data Element  /MRSS/T_RM_MAT_PRKST Material planning in networks: primary costs
199 Data Element  /MRSS/T_RM_MDCI_VERSION_NW Version Number
200 Data Element  /MRSS/T_RM_MEPROFILE External Procurement Profile
201 Data Element  /MRSS/T_RM_MGVRG Operation Quantity
202 Data Element  /MRSS/T_RM_MINWEI Minimum Send-Ahead Quantity
203 Data Element  /MRSS/T_RM_NETZKONT Indicator for the account assignment of a network(hdr/act.)
204 Data Element  /MRSS/T_RM_NO_DISP_PLUS Effective for Materials Planning
205 Data Element  /MRSS/T_RM_NUMBER_DAYS_NW Number of days per week (Working Ratio)
206 Data Element  /MRSS/T_RM_OCM_CH_PROC Process that has lead to the change of an object
207 Data Element  /MRSS/T_RM_OCM_COMP_RES OCM: Result of comparison of two order objects
208 Data Element  /MRSS/T_RM_OCM_OBJ_TYPE Change indicator
209 Data Element  /MRSS/T_RM_OPRE1 Unit for remaining quantity of business process
210 Data Element  /MRSS/T_RM_OPRZ1 Remaining quantity for business process
211 Data Element  /MRSS/T_RM_ORDER_PROB Order Probability ID
212 Data Element  /MRSS/T_RM_ORDER_PROB_NW Order Probability
213 Data Element  /MRSS/T_RM_OWAERS Object currency for network activity
214 Data Element  /MRSS/T_RM_PBEARZEIT Processing time (forecast)
215 Data Element  /MRSS/T_RM_PHFLG Indicator: Phase
216 Data Element  /MRSS/T_RM_PHSEQ Control Recipe Destination
217 Data Element  /MRSS/T_RM_PLIFZ Planned Delivery Time in Days
218 Data Element  /MRSS/T_RM_PLNAL Group Counter
219 Data Element  /MRSS/T_RM_PLNFOLGE Sequence
220 Data Element  /MRSS/T_RM_PLNKN Number of the task list node
221 Data Element  /MRSS/T_RM_PLNNR Key for Task List Group
222 Data Element  /MRSS/T_RM_PRIORITAET Priority
223 Data Element  /MRSS/T_RM_PROD_ACT Indicator: Activity is a production activity
224 Data Element  /MRSS/T_RM_PROJECT_ACTIVITY_NW Project Activity types
225 Data Element  /MRSS/T_RM_PROJECT_PHASE_NW Project Phase
226 Data Element  /MRSS/T_RM_PROJ_COUNTRY_NW Project Country
227 Data Element  /MRSS/T_RM_PSTXCHG Ind.: Changed PS text
228 Data Element  /MRSS/T_RM_PS_SPS_ELE Standard WBS element
229 Data Element  /MRSS/T_RM_QEIFSUBSYS Subsystem Identifier for QM Subsystem Interface
230 Data Element  /MRSS/T_RM_QERFSICHT Recording View
231 Data Element  /MRSS/T_RM_QKZFEAT Indicator Is Not Used Currently
232 Data Element  /MRSS/T_RM_QKZPRFREI Interval Without Reference to Time or Quantity
233 Data Element  /MRSS/T_RM_QKZPRMENG Creation Cycle = Quantity (Quantity-Reference)
234 Data Element  /MRSS/T_RM_QKZPRZEIT Interval = Time (Time-Related)
235 Data Element  /MRSS/T_RM_QKZTLSBEST Operation with Stock-Related Partial Lot Assignment
236 Data Element  /MRSS/T_RM_QKZZTMG1 Quantity Confirmation for Each Partial Lot
237 Data Element  /MRSS/T_RM_QL_KAPART Capacity category
238 Data Element  /MRSS/T_RM_QPART Inspection Type
239 Data Element  /MRSS/T_RM_QPPKTABS Flow Variants for Inspection Point Completion
240 Data Element  /MRSS/T_RM_QRASTEREH Grid Unit of Measure
241 Data Element  /MRSS/T_RM_QRASTMENG Quantity Between Two Inspections
242 Data Element  /MRSS/T_RM_QRASTZEHT Time Unit
243 Data Element  /MRSS/T_RM_QRASTZFAK Time Factor
244 Data Element  /MRSS/T_RM_QUALF Suitability
245 Data Element  /MRSS/T_RM_RAP_SUPERVISOR_CNT Number of Site Supervisors
246 Data Element  /MRSS/T_RM_REASON_CLOSE_NW Closed Reason
247 Data Element  /MRSS/T_RM_RELEVANT_FOR_MRS Operation Set as MRS-Relevant
248 Data Element  /MRSS/T_RM_REMOTE_NW Remote possible
249 Data Element  /MRSS/T_RM_REM_EFFORT_RES_CNT Determination of Remaining Demand: No. of Resources
250 Data Element  /MRSS/T_RM_REQUEST_LOB_NW Requester Line of Business
251 Data Element  /MRSS/T_RM_REQU_UPD Requirements Profile Was Changed Manually
252 Data Element  /MRSS/T_RM_REQ_PARTNER Requested Partner
253 Data Element  /MRSS/T_RM_RMNGA Total confirmed rework quantity
254 Data Element  /MRSS/T_RM_ROLE_CATEGORY Role Category
255 Data Element  /MRSS/T_RM_ROLE_TYPE_NW Role Type
256 Data Element  /MRSS/T_RM_RO_GROUP_ROLE_NW Role Owner Group - Role
257 Data Element  /MRSS/T_RM_RSG_BOOLEAN Boolean Variable
258 Data Element  /MRSS/T_RM_RSG_BOOLEAN Boolean Variable
259 Data Element  /MRSS/T_RM_RSG_REQUID Profile key
260 Data Element  /MRSS/T_RM_RSG_TEAM_PLANNING Team Planning flag for Demand
261 Data Element  /MRSS/T_RM_RSG_TIME_RULE_ID Time Rule Id
262 Data Element  /MRSS/T_RM_RSTRA Reduction strategy per operation/activity
263 Data Element  /MRSS/T_RM_RSTUF Reduction level which reduces operation lead time
264 Data Element  /MRSS/T_RM_RSTZE Unit of measure for setup time
265 Data Element  /MRSS/T_RM_RUEARSCHLU Setup Type Key
266 Data Element  /MRSS/T_RM_RUEFAGRP Setup group category
267 Data Element  /MRSS/T_RM_RUEFASCHLU Setup group key
268 Data Element  /MRSS/T_RM_RUEST Setup time
269 Data Element  /MRSS/T_RM_RU_IPRZE Unit of measurement for conf. quantity for business process
270 Data Element  /MRSS/T_RM_RU_IPRZK No remaining quantity expected for business process
271 Data Element  /MRSS/T_RM_RWFAK Rework factor (is not used yet)
272 Data Element  /MRSS/T_RM_SCEND_ACT Ind.: Purchase requisition at activity finish date
273 Data Element  /MRSS/T_RM_SCOPE_CV Object Class
274 Data Element  /MRSS/T_RM_SERV_PHASE_NW Resource Management Service Phase
275 Data Element  /MRSS/T_RM_SFORDN Framework Order
276 Data Element  /MRSS/T_RM_SLA_EXCLUDE_NW Reason code for Exclude from SLA
277 Data Element  /MRSS/T_RM_SORTI Sort Term for Non-Stock Info Records
278 Data Element  /MRSS/T_RM_SPARAMETER Scheduling Parameters for External Scheduling
279 Data Element  /MRSS/T_RM_SPARAMETER Scheduling Parameters for External Scheduling
280 Data Element  /MRSS/T_RM_SPARAMETER Scheduling Parameters for External Scheduling
281 Data Element  /MRSS/T_RM_SPLITTANZ Maximum number of splits
282 Data Element  /MRSS/T_RM_SPLITTERM Actual number of splits
283 Data Element  /MRSS/T_RM_SPLITTUNG Required splitting
284 Data Element  /MRSS/T_RM_SPLIT_QTY Split quantity in the order split
285 Data Element  /MRSS/T_RM_SSELD Latest scheduled finish: Wait time (date)
286 Data Element  /MRSS/T_RM_SSELZ Latest scheduled finish: Wait time
287 Data Element  /MRSS/T_RM_SSSAD Latest scheduled start: Teardown (date)
288 Data Element  /MRSS/T_RM_SSSAZ Latest scheduled start: Teardown (time)
289 Data Element  /MRSS/T_RM_SSSBD Latest scheduled start: Processing (date)
290 Data Element  /MRSS/T_RM_SSSBZ Latest scheduled start: Processing (time)
291 Data Element  /MRSS/T_RM_SSSLD Latest scheduled start: Wait time (date)
292 Data Element  /MRSS/T_RM_SSSLZ Latest scheduled start: Wait time
293 Data Element  /MRSS/T_RM_STATUS_IND_NW STATUS Indicator
294 Data Element  /MRSS/T_RM_STDKN Node of operation within reference operation set
295 Data Element  /MRSS/T_RM_STEUS Control key
296 Data Element  /MRSS/T_RM_STLKN BOM item node number
297 Data Element  /MRSS/T_RM_STLTY BOM category
298 Data Element  /MRSS/T_RM_STLTY BOM category
299 Data Element  /MRSS/T_RM_STNUM Bill of material
300 Data Element  /MRSS/T_RM_SUMKNTNR Node number of the superior operation
301 Data Element  /MRSS/T_RM_SYSTEM_INFO_NW System Info
302 Data Element  /MRSS/T_RM_TABIX_D Field defined as in SY-TABIX
303 Data Element  /MRSS/T_RM_TIMESTAMP_BEGIN Time Stamp: Start
304 Data Element  /MRSS/T_RM_TIMESTAMP_BEGIN Time Stamp: Start
305 Data Element  /MRSS/T_RM_TIMESTAMP_END Time stamp: end
306 Data Element  /MRSS/T_RM_TIMESTAMP_END Time stamp: end
307 Data Element  /MRSS/T_RM_TRANSZEIT Move time used for scheduling
308 Data Element  /MRSS/T_RM_TRAZE Unitof measure for move time
309 Data Element  /MRSS/T_RM_TXCHG Indicator: long text changed
310 Data Element  /MRSS/T_RM_TXTKY Internal text number (12-character)
311 Data Element  /MRSS/T_RM_UEKANKZ Optional overlapping
312 Data Element  /MRSS/T_RM_UEMUSKZ Required overlapping
313 Data Element  /MRSS/T_RM_UPOSZ Subitem Number
314 Data Element  /MRSS/T_RM_USCREENCTL_DATACHGD Data Was Changed in the Controls on the User Screen
315 Data Element  /MRSS/T_RM_VBKZ Update Indicator
316 Data Element  /MRSS/T_RM_VGWRT Standard Value
317 Data Element  /MRSS/T_RM_VGWRT Standard Value
318 Data Element  /MRSS/T_RM_VGWRT Standard Value
319 Data Element  /MRSS/T_RM_VGWRT Standard Value
320 Data Element  /MRSS/T_RM_VGWRT Standard Value
321 Data Element  /MRSS/T_RM_VGWRT Standard Value
322 Data Element  /MRSS/T_RM_VGWRTEH Unit of measure for the standard value
323 Data Element  /MRSS/T_RM_VGWRTEH Unit of measure for the standard value
324 Data Element  /MRSS/T_RM_VGWRTEH Unit of measure for the standard value
325 Data Element  /MRSS/T_RM_VGWRTEH Unit of measure for the standard value
326 Data Element  /MRSS/T_RM_VGWRTEH Unit of measure for the standard value
327 Data Element  /MRSS/T_RM_VGWRTEH Unit of measure for the standard value
328 Data Element  /MRSS/T_RM_VG_EKGRP Purchasing group for external processing
329 Data Element  /MRSS/T_RM_VINTV Increment between referenced operations
330 Data Element  /MRSS/T_RM_VORGABEEND2 Constraint for Finish of Activity (Basic)
331 Data Element  /MRSS/T_RM_VORGSCHL Standard value key
332 Data Element  /MRSS/T_RM_VORNR Role Number
333 Data Element  /MRSS/T_RM_VPLBFL Referenced sequence in routing
334 Data Element  /MRSS/T_RM_VPLNAL Group counter of the referenced task list
335 Data Element  /MRSS/T_RM_VPLNNR Group of the referenced task list
336 Data Element  /MRSS/T_RM_VPLNTY Type of the referenced task list
337 Data Element  /MRSS/T_RM_VSINACT Version inactive indicator
338 Data Element  /MRSS/T_RM_VSTGA Deadline deviation reason
339 Data Element  /MRSS/T_RM_VSTZW Deadline function
340 Data Element  /MRSS/T_RM_WARTEZEIT Queue timeQueue time used for scheduling
341 Data Element  /MRSS/T_RM_WEMNG Quantity of Goods Received
342 Data Element  /MRSS/T_RM_WERKS_D plant
343 Data Element  /MRSS/T_RM_WERKS_I Actual plant
344 Data Element  /MRSS/T_RM_WKURS Exchange Rate
345 Data Element  /MRSS/T_RM_WTRZE Unit of measure for queue time
346 Data Element  /MRSS/T_RM_XCHAR Batch management indicator (internal)
347 Data Element  /MRSS/T_RM_XMNGA Total scrap quantity confirmed
348 Data Element  /MRSS/T_RM_X_KUM_PER Cumulative Scrap Qty of Subsequent Reporting Pts (Cur. Per.)
349 Data Element  ABLAD Unloading Point
350 Data Element  AENNR Change Number
351 Data Element  AFNAM Name of requisitioner/requester
352 Data Element  ANZKAP Number of capacities required
353 Data Element  APROZENT Work percentage
354 Data Element  ARBEIT Work involved in the activity
355 Data Element  ARBEITE Unit for work
356 Data Element  AUFKALSM Costing Sheet
357 Data Element  AUFNR Order Number
358 Data Element  AUFZSCHL Overhead key
359 Data Element  BEAZE Unit of measure for processing time
360 Data Element  BEDNR Requirement Tracking Number
361 Data Element  BSTME Order unit
362 Data Element  BUKRS Company Code
363 Data Element  CHAR1 Single-Character Flag
364 Data Element  CHAR1 Single-Character Flag
365 Data Element  CHAR10 Character Field Length = 10
366 Data Element  CHAR10 Character Field Length = 10
367 Data Element  CHAR19 19 Characters
368 Data Element  CHAR19 19 Characters
369 Data Element  CHAR3 3-Byte field
370 Data Element  CHAR32 Character field, length 32
371 Data Element  CIM_COUNT Internal counter
372 Data Element  CIM_COUNT Internal counter
373 Data Element  CLASF Ind.: Take Activity Into Account for Project Summarization
374 Data Element  CO_ISMNGEH Unit of measure for the activity to be confirmed
375 Data Element  CO_ISMNGEH Unit of measure for the activity to be confirmed
376 Data Element  CO_ISMNGEH Unit of measure for the activity to be confirmed
377 Data Element  CO_ISMNGEH Unit of measure for the activity to be confirmed
378 Data Element  CO_ISMNGEH Unit of measure for the activity to be confirmed
379 Data Element  CO_ISMNGEH Unit of measure for the activity to be confirmed
380 Data Element  CO_ISMNW Actual work
381 Data Element  CO_PEDD Forecast finish date of operation from confirmation
382 Data Element  CO_RMZHL Confirmation counter
383 Data Element  CO_RUECK Completion confirmation number for the operation
384 Data Element  CR_VERTN Distr.cap.reqmts (plant maint.,process order, network)
385 Data Element  CUOBJ Configuration (internal object number)
386 Data Element  DATS Field of type DATS
387 Data Element  DATS Field of type DATS
388 Data Element  DATS Field of type DATS
389 Data Element  DATS Field of type DATS
390 Data Element  DAUDEHN Indicator: flexible duration
391 Data Element  DAUMIN Minimum activity duration
392 Data Element  DAUMINE Unit for the minimum duration
393 Data Element  DAUNOR Normal duration of the activity
394 Data Element  DAUNORE Normal duration/unit
395 Data Element  EBELN Purchasing Document Number
396 Data Element  EBELP Item Number of Purchasing Document
397 Data Element  EINSCHRA Constraint on the basic start date for the activity
398 Data Element  EINSCHRE Constraint on the finish date of the activity
399 Data Element  EKORG Purchasing organization
400 Data Element  ESOKZ Purchasing info record category
401 Data Element  EWDAM Minimum duration (from forecast) for activity
402 Data Element  EWDAN Normal duration (from forecast) of activity
403 Data Element  EWDME Unit for forecast minimum duration
404 Data Element  EWDNE Unit for forecast normal duration
405 Data Element  EWENDED Forecast finish date
406 Data Element  EWENDEZ Forecast finish time for the activity
407 Data Element  EWSTARTD Forecasted start date for the activity
408 Data Element  EWSTARTZ Forecast start time of the activity
409 Data Element  FKBER Functional Area
410 Data Element  FPAVD Earliest scheduled start date (forecast)
411 Data Element  FPAVZ Earliest scheduled start time (forecast)
412 Data Element  FPEDD Earliest scheduled finish date (forecast)
413 Data Element  FPEDZ Earliest scheduled finish time (forecast)
414 Data Element  FPLNR Billing plan number / invoicing plan number
415 Data Element  FSAVD Earliest scheduled start: Execution (date)
416 Data Element  FSAVZ Earliest scheduled start: Execution (time)
417 Data Element  FSEDZ Earliest scheduled finish: Execution (time)
418 Data Element  GSBER Business Area
419 Data Element  INFNR Number of purchasing info record
420 Data Element  JV_NAME Joint venture
421 Data Element  JV_RECIND Recovery Indicator
422 Data Element  J_OBJNR Object number
423 Data Element  KNOBJ Number of Object with Assigned Dependencies
424 Data Element  KNTTP Account assignment category
425 Data Element  KONNR Number of principal purchase agreement
426 Data Element  KSTAR Cost Element
427 Data Element  KTPNR Item number of principal purchase agreement
428 Data Element  LIFNR Account Number of Vendor or Creditor
429 Data Element  LIFNR Account Number of Vendor or Creditor
430 Data Element  LOHNART Wage type
431 Data Element  LSTAR Activity Type
432 Data Element  LSTAR Activity Type
433 Data Element  LSTAR Activity Type
434 Data Element  LSTAR Activity Type
435 Data Element  LSTAR Activity Type
436 Data Element  LSTAR Activity Type
437 Data Element  LSTAR Activity Type
438 Data Element  MANDT Client
439 Data Element  MATKL Material Group
440 Data Element  MEINS Base Unit of Measure
441 Data Element  MEINS Base Unit of Measure
442 Data Element  MILESTONE Usage
443 Data Element  NW_PRIO Priority
444 Data Element  OBJEKTID Object ID
445 Data Element  OFMNW Forecasted work (actual + remaining)
446 Data Element  OTYPE Object Type
447 Data Element  PACKNO Package number
448 Data Element  PDAE Unit of the forecasted duration from the confirmation
449 Data Element  PDAU Forecasted duration of activity from confirmation
450 Data Element  PEINH Price unit
451 Data Element  PERNR_D Personnel Number
452 Data Element  PERNR_D Personnel Number
453 Data Element  PERNR_D Personnel Number
454 Data Element  PLNFOLGE Sequence
455 Data Element  PPUFF_FREI Free float (from forecast)
456 Data Element  PPUFF_GESM Total float (from forecast)
457 Data Element  PRCTR Profit Center
458 Data Element  PREIS Price
459 Data Element  PRKST Costs in the activity
460 Data Element  PS_PSP_ELE Work breakdown structure element (WBS element)
461 Data Element  PS_RESTA Forecast date constraint on activity start
462 Data Element  PS_RESTE Forecast date constraint on activity finish
463 Data Element  PUFFR_FREI Free float
464 Data Element  PUFFR_GESM Total float
465 Data Element  REGIO Region (State, Province, County)
466 Data Element  SELKZ Selection flag
467 Data Element  SLWID Key word ID for user-defined fields
468 Data Element  SPAVD Latest scheduled start date (forecast)
469 Data Element  SPAVZ Latest scheduled start time (forecast)
470 Data Element  SPEDD Latest scheduled finish date (forecast)
471 Data Element  SPEDZ Latest scheduled finish time (forecast)
472 Data Element  SPRAS Language Key
473 Data Element  SSAVD Latest scheduled start: Execution (date)
474 Data Element  SSAVZ Latest scheduled start: Execution (time)
475 Data Element  SSEDD Latest scheduled finish: Execution (date)
476 Data Element  SSEDZ Latest scheduled finish: Execution (time)
477 Data Element  TECHS Parameter Variant/Standard Variant
478 Data Element  TIMS Field of type TIMS
479 Data Element  TIMS Field of type TIMS
480 Data Element  TIMS Field of type TIMS
481 Data Element  TIMS Field of type TIMS
482 Data Element  TXJCD Tax Jurisdiction
483 Data Element  TZNTSTMPLL Time Stamp - Long Format
484 Data Element  TZNTSTMPLL Time Stamp - Long Format
485 Data Element  USRCHAR10 User field with 10 characters
486 Data Element  USRCHAR10 User field with 10 characters
487 Data Element  USRCHAR20 User field with 20 characters
488 Data Element  USRCHAR20 User field with 20 characters
489 Data Element  USRCUKY User field: Unit for value fields
490 Data Element  USRCUKY User field: Unit for value fields
491 Data Element  USRCURR13 User-defined field for values (length 10,3)
492 Data Element  USRCURR13 User-defined field for values (length 10,3)
493 Data Element  USRDATE User field for date
494 Data Element  USRDATE User field for date
495 Data Element  USRFLAG User-defined field: Indicator for reports
496 Data Element  USRFLAG User-defined field: Indicator for reports
497 Data Element  USRQUAN13 User field for quantity (length 10.3)
498 Data Element  USRQUAN13 User field for quantity (length 10.3)
499 Data Element  USRUNIT User field: Unit for quantity fields
500 Data Element  USRUNIT User field: Unit for quantity fields