SAP ABAP Data Element CLASF (Ind.: Take Activity Into Account for Project Summarization)
Hierarchy
☛
SAP_ABA (Software Component) Cross-Application Component
⤷
CA-GTF-PS (Application Component) Cross-Application Objects in Project System
⤷
BC (Package) Cross-Application Objects PP/PS
⤷
⤷
Basic Data
| Data Element | CLASF |
| Short Description | Ind.: Take Activity Into Account for Project Summarization |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | XFELD | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | PROJECT_SUMMARIZATION | |
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Proj. sum. |
| Medium | 15 | Project sum. |
| Long | 20 | Proj. summarization |
| Heading | 3 | PSu |
Documentation
Definition
Use this indicator to specify that activities in networks with activity account assignment will be taken into account in project summarization.
Activities are only taken into account (as summarization objects), if they are assigned to a WBS element with a summarization indicator, or if a WBS element with a summarization indicator exists in the path upwards.
History
| Last changed by/on | SAP | 19990629 |
| SAP Release Created in |