SAP ABAP Table ACTR (Order Activity Structure for Project Reporting)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PS-IS (Application Component) Information System
⤷ CNIS (Package) Application development R/3 PS information system
⤷ PS-IS (Application Component) Information System
⤷ CNIS (Package) Application development R/3 PS information system
Basic Data
Table Category | INTTAB | Structure |
Structure | ACTR | Table Relationship Diagram |
Short Description | Order Activity Structure for Project Reporting |
Delivery and Maintenance
Pool/cluster | ||
Delivery Class | ||
Data Browser/Table View Maintenance | Display/Maintenance Allowed with Restrictions |
Components
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
|
---|---|---|---|---|---|---|---|---|---|
1 | ARNUMMER | ADMI_RUN_D | ADMI_RUN | CHAR | 6 | 0 | Archiving Session Number | ||
2 | VSGRUPPE | VSGRUPPE | TEXT20 | CHAR | 20 | 0 | Group for a project version | ||
3 | VSNUMMER | VSNMR | VSNMR | CHAR | 12 | 0 | Number or description of a version | ||
4 | PRCTR | PRCTR | PRCTR | CHAR | 10 | 0 | Profit Center | CEPC | |
5 | PRNAM | IM_PRNAM | IM_PRNAM | CHAR | 8 | 0 | Investment program name | IMTP | |
6 | PRPOS | IM_POSID | IM_POSID | CHAR | 24 | 0 | Identification for an investment program position | ||
7 | PSPID | PS_PSPID | PS_PSPID | CHAR | 24 | 0 | Project definition | ||
8 | POSID | PS_POSID | PS_POSID | CHAR | 24 | 0 | Work Breakdown Structure Element (WBS Element) | ||
9 | KDAUF | VBELN_VA | VBELN | CHAR | 10 | 0 | Sales Document | VBUK | |
10 | KDPOS | POSNR_VA | POSNR | NUMC | 6 | 0 | Sales Document Item | VBUP | |
11 | AUFNR | AUF_NETNR | AUFNR | CHAR | 12 | 0 | Order/Network number | AUFK | |
12 | VORNR | CN_VORNR | VORNR | CHAR | 4 | 0 | Activity number in network and standard network | ||
13 | UVORN | CN_ELEMENT | VORNR | CHAR | 4 | 0 | Activity element number (work/external/general costs) | ||
14 | AUTYPTXT | AUTYPTEXT | TEXT40 | CHAR | 40 | 0 | Display field for order category description | ||
15 | STEUS | STEUS | STEUS | CHAR | 4 | 0 | Control key | T430 | |
16 | STEUTXT | STEUTXT | TEXT40 | CHAR | 40 | 0 | Control key description | ||
17 | ARBPL | ARBPL | ARBPL | CHAR | 8 | 0 | Work center | ||
18 | ARBTXT | PS_ARBTEXT | TEXT40 | CHAR | 40 | 0 | Short text for the CIM operating resource | ||
19 | WERKS | WERKS_D | WERKS | CHAR | 4 | 0 | Plant | T001W | |
20 | KTSCH | KTSCH | KTSCH | CHAR | 7 | 0 | Standard text key | T435 | |
21 | LTXA1 | LTXA1 | TEXT40 | CHAR | 40 | 0 | Operation short text | ||
22 | TXTSP | SPRAS | SPRAS | LANG | 1 | 0 | Language Key | T002 | |
23 | RSTRA | RSTRA | RSTRA | CHAR | 2 | 0 | Reduction strategy per operation/activity | T499Q | |
24 | SORTL | SORTI | CHAR10 | CHAR | 10 | 0 | Sort Term for Non-Stock Info Records | ||
25 | LIFNR | LIFNR | LIFNR | CHAR | 10 | 0 | Account Number of Vendor or Creditor | LFA1 | |
26 | PREIS | PREIS | WERT11 | CURR | 11 | 2 | Price | ||
27 | PEINH | PEINH | PACK3 | DEC | 5 | 0 | Price unit | ||
28 | SAKTO | KSTAR | KSTAR | CHAR | 10 | 0 | Cost Element | CSKA | |
29 | WAERS | WAERS | WAERS | CUKY | 5 | 0 | Currency Key | TCURC | |
30 | INFNR | INFNR | INFNR | CHAR | 10 | 0 | Number of purchasing info record | EINA | |
31 | ESOKZ | ESOKZ | ESOKZ | CHAR | 1 | 0 | Purchasing info record category | ||
32 | EKORG | EKORG | EKORG | CHAR | 4 | 0 | Purchasing organization | T024E | |
33 | EKGRP | VG_EKGRP | EKGRP | CHAR | 3 | 0 | Purchasing group for external processing | T024 | |
34 | KZLGF | KZLGF | XFELD | CHAR | 1 | 0 | Indicator: fixed lot external processing | ||
35 | KZWRTF | KZWRTF | XFELD | CHAR | 1 | 0 | Indicator: Fixed price for external processing | ||
36 | MATKL | MATKL | MATKL | CHAR | 9 | 0 | Material Group | T023 | |
37 | DDEHN | DAUDEHN | X | CHAR | 1 | 0 | Indicator: flexible duration | ||
38 | ANZZL | ANZKAP | INT1 | INT1 | 3 | 0 | Number of capacities required | ||
39 | PRZNT | APROZENT | INT1 | INT1 | 3 | 0 | Work percentage | ||
40 | MLSTN | MILESTONE | MILESTONE | CHAR | 5 | 0 | Usage | T433 | |
41 | MLSTXT | PS_MLSTTXT | TEXT40 | CHAR | 40 | 0 | Milestone description | ||
42 | BUKRS | BUKRS | BUKRS | CHAR | 4 | 0 | Company Code | T001 | |
43 | ANFKO | ANFKO | KOSTL | CHAR | 10 | 0 | Requesting cost center | CSKS | |
44 | ANFKOKRS | ANFKOKRS | CACCD | CHAR | 4 | 0 | Controlling area of the requesting cost center | TKA01 | |
45 | INDET | INDET | INDET | CHAR | 1 | 0 | Calculation key | ||
46 | LARNT | LSTAR | LSTAR | CHAR | 6 | 0 | Activity Type | CSLA | |
47 | PRKST | PRKST | PRKST | CURR | 11 | 2 | Costs in the activity | ||
48 | RUECK | CO_RUECK | CO_RUECK | NUMC | 10 | 0 | Completion confirmation number for the operation | ||
49 | RMZHL | CIM_COUNT | CIM_COUNT | NUMC | 8 | 0 | Internal counter | ||
50 | BANFN | CO_BANFN | BANFN | CHAR | 10 | 0 | Purchase requisition number | ||
51 | BNFPO | CO_BNFPO | BNFPO | NUMC | 5 | 0 | Item number of the purchase requisition in the order | EBAN | |
52 | KALID | WFCID | WFCID | CHAR | 2 | 0 | Factory Calendar | TFACD | |
53 | VERTL | CR_VERTN | CR_VERTL | CHAR | 8 | 0 | Distr.cap.reqmts (plant maint.,process order, network) | TC29 | |
54 | LEKNW | CO_LEIKZ | XFELD | CHAR | 1 | 0 | Indicator: No remaining activity expected | ||
55 | NPRIO | NW_PRIO | NW_PRIO | CHAR | 1 | 0 | Priority | TCN07 | |
56 | TXJCD | TXJCD | TXJCD | CHAR | 15 | 0 | Tax Jurisdiction | TTXJ | |
57 | SCOPE | SCOPE_CV | SCOPE_CV | CHAR | 2 | 0 | Object Class | ||
58 | GSBER | GSBER | GSBER | CHAR | 4 | 0 | Business Area | TGSB | |
59 | AUDISP | AUDISP | XFELD | CHAR | 1 | 0 | Ind: Reservation applicable to MRP;Purc. req. is created | ||
60 | AENNR | AENNR | AENNR | CHAR | 12 | 0 | Change Number | AENR | |
61 | EVGEW | EV_WEIGHTD | DEC8 | DEC | 8 | 0 | Aggregation weight for POC (PS progress) | ||
62 | CLASF | CLASF | XFELD | CHAR | 1 | 0 | Ind.: Take Activity Into Account for Project Summarization | ||
63 | OWAER | OWAERS | WAERS | CUKY | 5 | 0 | Object currency for network activity | TCURC | |
64 | AFNAM | AFNAM | AFNAM | CHAR | 12 | 0 | Name of requisitioner/requester | ||
65 | KZFIX | CN_KZFIX | XFELD | CHAR | 1 | 0 | Indicator: Purchasing info record data are fixed | ||
66 | PERNR | CO_PERNR | PERNR | NUMC | 8 | 0 | Personnel number | ||
67 | WKURS | WKURS | KURSP | DEC | 9 | 5 | Exchange Rate | ||
68 | FPLNR | FPLNR | FPLNR | CHAR | 10 | 0 | Billing plan number / invoicing plan number | * | |
69 | KLVAR | CK_KLVAR | KLVAR | CHAR | 4 | 0 | Costing Variant | * | |
70 | KALNR | CK_KALNR | CK_KALNR | NUMC | 12 | 0 | Cost Estimate Number for Cost Est. w/o Qty Structure | * | |
71 | PRZ01 | CO_PRZNR | CO_PRZNR | CHAR | 12 | 0 | Business Process | * | |
72 | MEINH | VORME | MEINS | UNIT | 3 | 0 | Unit of measure for activity | T006 | |
73 | PLIFZ | PLIFZ | DEC3 | DEC | 3 | 0 | Planned delivery time in days | ||
74 | DAUNO | DAUNOR | DAUER_4_1 | QUAN | 5 | 1 | Normal duration of the activity | ||
75 | DAUNE | DAUNORE | MEINS | UNIT | 3 | 0 | Normal duration/unit | T006 | |
76 | DAUMI | DAUMIN | DAUER_4_1 | QUAN | 5 | 1 | Minimum activity duration | ||
77 | DAUME | DAUMINE | MEINS | UNIT | 3 | 0 | Unit for the minimum duration | T006 | |
78 | EINSA | EINSCHRA | RESTRIKSTR | CHAR | 1 | 0 | Constraint on the basic start date for the activity | ||
79 | EINSE | EINSCHRE | RESTRIKEND | CHAR | 1 | 0 | Constraint on the finish date of the activity | ||
80 | ARBEI | ARBEIT | ARBEIT | QUAN | 7 | 1 | Work involved in the activity | ||
81 | ARBEH | ARBEITE | MEINS | UNIT | 3 | 0 | Unit for work | T006 | |
82 | MGVRG | MGVRG | MENG13 | QUAN | 13 | 3 | Operation Quantity | ||
83 | ASVRG | ASVRG | MENG13 | QUAN | 13 | 3 | Operation scrap | ||
84 | ISMNW | CO_ISMNW | MENG13 | QUAN | 13 | 3 | Actual work | ||
85 | FSAVD | FSAVD | DATUM | DATS | 8 | 0 | Earliest scheduled start: Execution (date) | ||
86 | FSAVZ | FSAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start: Execution (time) | ||
87 | FSEDD | FSEDD | DATUM | DATS | 8 | 0 | Earliest scheduled finish: Execution (date) | ||
88 | FSEDZ | FSEDZ | ATIME | TIMS | 6 | 0 | Earliest scheduled finish: Execution (time) | ||
89 | SSAVD | SSAVD | DATUM | DATS | 8 | 0 | Latest scheduled start: Execution (date) | ||
90 | SSAVZ | SSAVZ | ATIME | TIMS | 6 | 0 | Latest scheduled start: Execution (time) | ||
91 | SSEDD | SSEDD | DATUM | DATS | 8 | 0 | Latest scheduled finish: Execution (date) | ||
92 | SSEDZ | SSEDZ | ATIME | TIMS | 6 | 0 | Latest scheduled finish: Execution (time) | ||
93 | ISDD | ISDD | DATUM | DATS | 8 | 0 | Actual start: Execution (date) | ||
94 | ISDZ | ISDZ | ATIME | TIMS | 6 | 0 | Actual start: Execution/setup (time) | ||
95 | IEDD | IEDD | DATUM | DATS | 8 | 0 | Actual finish: Execution (date) | ||
96 | IEDZ | IEDZ | ATIME | TIMS | 6 | 0 | Actual finish: Execution (time) | ||
97 | PEDD | CO_PEDD | DATUM | DATS | 8 | 0 | Forecast finish date of operation from confirmation | ||
98 | PEDZ | CO_PEDZ | ATIME | TIMS | 6 | 0 | Forecast finish time of operation from confirmation | ||
99 | PUFFR | PUFFR_FREI | PUFFER | DEC | 3 | 0 | Free float | ||
100 | PUFGS | PUFFR_GESM | PUFFER | DEC | 3 | 0 | Total float | ||
101 | NTANF | VORGABESTD | VORGABESTR | DATS | 8 | 0 | Constraint for activity start (Basic) | ||
102 | NTANZ | VORGABESTZ | ATIME | TIMS | 6 | 0 | Constraint for activity start time (Basic) | ||
103 | NTEND | VORGABEEND | VORGABEEND | DATS | 8 | 0 | Constraint for finish of activity (Basic) | ||
104 | NTENZ | VORGABEENZ | ATIME | TIMS | 6 | 0 | Basic finish time of the activity | ||
105 | EWSTD | EWSTARTD | DATUM | DATS | 8 | 0 | Forecasted start date for the activity | ||
106 | EWSTZ | EWSTARTZ | ATIME | TIMS | 6 | 0 | Forecast start time of the activity | ||
107 | EWEND | EWENDED | DATUM | DATS | 8 | 0 | Forecast finish date | ||
108 | EWENZ | EWENDEZ | ATIME | TIMS | 6 | 0 | Forecast finish time for the activity | ||
109 | EWDAN | EWDAN | DAUER_4_1 | QUAN | 5 | 1 | Normal duration (from forecast) of activity | ||
110 | EWDNE | EWDNE | MEINS | UNIT | 3 | 0 | Unit for forecast normal duration | T006 | |
111 | EWDAM | EWDAM | DAUER_4_1 | QUAN | 5 | 1 | Minimum duration (from forecast) for activity | ||
112 | EWDME | EWDME | MEINS | UNIT | 3 | 0 | Unit for forecast minimum duration | T006 | |
113 | EWSTE | PS_RESTE | RESTRIKEND | CHAR | 1 | 0 | Forecast date constraint on activity finish | ||
114 | EWSTA | PS_RESTA | RESTRIKSTR | CHAR | 1 | 0 | Forecast date constraint on activity start | ||
115 | DABEA | CO_DAUBEA | DAUER_6_1 | QUAN | 7 | 1 | Processing time | ||
116 | BEAZE | BEAZE | EINHEIT | UNIT | 3 | 0 | Unit of measure for processing time | ||
117 | OFMNW | OFMNW | ARBEIT | QUAN | 7 | 1 | Forecasted work (actual + remaining) | ||
118 | OFFSTB | CP_OOFFSTB | VNZTV | QUAN | 5 | 0 | Offset to sub-operation start | ||
119 | EHOFFB | CP_OEHOFFB | MEINS | UNIT | 3 | 0 | Unit for offset to start | T006 | |
120 | OFFSTE | CP_OOFFSTE | VNZTV | QUAN | 5 | 0 | Offset to sub-operation finish | ||
121 | EHOFFE | CP_OEHOFFE | MEINS | UNIT | 3 | 0 | Unit for offset to finish | T006 | |
122 | FPAVD | FPAVD | DATUM | DATS | 8 | 0 | Earliest scheduled start date (forecast) | ||
123 | FPAVZ | FPAVZ | ATIME | TIMS | 6 | 0 | Earliest scheduled start time (forecast) | ||
124 | FPEDD | FPEDD | DATUM | DATS | 8 | 0 | Earliest scheduled finish date (forecast) | ||
125 | FPEDZ | FPEDZ | ATIME | TIMS | 6 | 0 | Earliest scheduled finish time (forecast) | ||
126 | SPAVD | SPAVD | DATUM | DATS | 8 | 0 | Latest scheduled start date (forecast) | ||
127 | SPAVZ | SPAVZ | ATIME | TIMS | 6 | 0 | Latest scheduled start time (forecast) | ||
128 | SPEDD | SPEDD | DATUM | DATS | 8 | 0 | Latest scheduled finish date (forecast) | ||
129 | SPEDZ | SPEDZ | ATIME | TIMS | 6 | 0 | Latest scheduled finish time (forecast) | ||
130 | BEAZP | BEAZEP | EINHEIT | UNIT | 3 | 0 | Unit of processing time (Forecast) | ||
131 | PUFGP | PPUFF_GESM | PUFFER | DEC | 3 | 0 | Total float (from forecast) | ||
132 | PUFFP | PPUFF_FREI | PUFFER | DEC | 3 | 0 | Free float (from forecast) | ||
133 | DAPBE | CO_DAUBEAP | DAUER_6_1 | QUAN | 7 | 1 | Duration of processing time (forecast) | ||
134 | EPANF | EPANF | DATUM | DATS | 8 | 0 | Dispatched start date for operation | ||
135 | EPANZ | EPANZ | ATIME | TIMS | 6 | 0 | Dispatched start time for operation | ||
136 | EPEND | EPEND | DATUM | DATS | 8 | 0 | Dispatched finish date | ||
137 | EPENZ | EPENZ | ATIME | TIMS | 6 | 0 | Dispatched finish time | ||
138 | PDAU | PDAU | DAUER_4_1 | QUAN | 5 | 1 | Forecasted duration of activity from confirmation | ||
139 | PDAE | PDAE | MEINS | UNIT | 3 | 0 | Unit of the forecasted duration from the confirmation | T006 | |
140 | SLWID | SLWID | SLWID | CHAR | 7 | 0 | Key word ID for user-defined fields | TCN00 | |
141 | USR00 | USRCHAR20 | USRCHAR20 | CHAR | 20 | 0 | User field with 20 characters | ||
142 | USR01 | USRCHAR20 | USRCHAR20 | CHAR | 20 | 0 | User field with 20 characters | ||
143 | USR02 | USRCHAR10 | USRCHAR10 | CHAR | 10 | 0 | User field with 10 characters | ||
144 | USR03 | USRCHAR10 | USRCHAR10 | CHAR | 10 | 0 | User field with 10 characters | ||
145 | USR04 | USRQUAN13 | USRQUAN13 | QUAN | 13 | 3 | User field for quantity (length 10.3) | ||
146 | USE04 | USRUNIT | MEINS | UNIT | 3 | 0 | User field: Unit for quantity fields | T006 | |
147 | USR05 | USRQUAN13 | USRQUAN13 | QUAN | 13 | 3 | User field for quantity (length 10.3) | ||
148 | USE05 | USRUNIT | MEINS | UNIT | 3 | 0 | User field: Unit for quantity fields | T006 | |
149 | USR06 | USRCURR13 | USRCURR13 | CURR | 13 | 3 | User-defined field for values (length 10,3) | ||
150 | USE06 | USRCUKY | WAERS | CUKY | 5 | 0 | User field: Unit for value fields | TCURC | |
151 | USR07 | USRCURR13 | USRCURR13 | CURR | 13 | 3 | User-defined field for values (length 10,3) | ||
152 | USE07 | USRCUKY | WAERS | CUKY | 5 | 0 | User field: Unit for value fields | TCURC | |
153 | USR08 | USRDATE | USRDATE | DATS | 8 | 0 | User field for date | ||
154 | USR09 | USRDATE | USRDATE | DATS | 8 | 0 | User field for date | ||
155 | USR10 | USRFLAG | FLAG | CHAR | 1 | 0 | User-defined field: Indicator for reports | ||
156 | USR11 | USRFLAG | FLAG | CHAR | 1 | 0 | User-defined field: Indicator for reports | ||
157 | WEMNG_OPR | WEMNG | MENG13 | QUAN | 13 | 3 | Quantity of goods received | ||
158 | WEMEH_OPR | BSTME | MEINS | UNIT | 3 | 0 | Order unit | T006 | |
159 | FLG_PURS | FLG_PURS | KREUZ | CHAR | 1 | 0 | Indicator: Purchase order exists | ||
160 | IDAUR | IDAUR | DAUER_4_1 | QUAN | 5 | 1 | Actual duration for confirmation | ||
161 | IDAUE | IDAURE | MEINS | UNIT | 3 | 0 | Unit for actual duration | T006 | |
162 | ODAUR | ODAUR | DAUER_4_1 | QUAN | 5 | 1 | Remaining duration of activity | ||
163 | ODAUE | ODAUE | MEINS | UNIT | 3 | 0 | Unit for remaining duration | T006 | |
164 | ABARBD | CO_ABARB | CO_ABARB | NUMC | 3 | 0 | Confirmation: Degree of processing | ||
165 | REMNW | REMNW_2 | ARBEIT_2 | QUAN | 8 | 2 | Remaining Work | ||
166 | REMNE | ARBEITE | MEINS | UNIT | 3 | 0 | Unit for work | T006 | |
167 | ABARBA | CO_ABARB | CO_ABARB | NUMC | 3 | 0 | Confirmation: Degree of processing | ||
168 | STATXT | STATUSTEXT_2 | CHAR80 | CHAR | 80 | 0 | Edited status text | ||
169 | FRUEHER | FRUEHER_2 | DAUER_9_1 | QUAN | 10 | 1 | Actual start is before earliest scheduled start | ||
170 | SPAETER | SPAETER_2 | DAUER_9_1 | QUAN | 10 | 1 | Actual Finish/Planned Finish After Latest Scheduled Finish | ||
171 | VERZUG | VERZUG_2 | DAUER_9_1 | QUAN | 10 | 1 | Duration After Latest Scheduled Finish | ||
172 | VORBEI | VORBEI_2 | DAUER_9_1 | QUAN | 10 | 1 | Duration After Earliest Scheduled Start | ||
173 | VEINH | VERZ_EINHT | MEINS | UNIT | 3 | 0 | Unit for Duration of the Delay | T006 | |
174 | VGTYP | VGTYP | VORG_TYP | CHAR | 3 | 0 | Activity or element category | ||
175 | FLG_RCKMLD | PS_RCKMLDB | XFELD | CHAR | 1 | 0 | Indicator: Can be confirmed | ||
176 | FUNC_AREA | FKBER | FKBER | CHAR | 16 | 0 | Functional Area | * | |
177 | .INCLUDE | 0 | 0 | ||||||
178 | .INCLUDE | 0 | 0 |