SAP ABAP Data Element VERZUG_2 (Duration After Latest Scheduled Finish)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PS-IS (Application Component) Information System
⤷ CNIS (Package) Application development R/3 PS information system
⤷ PS-IS (Application Component) Information System
⤷ CNIS (Package) Application development R/3 PS information system
Basic Data
Data Element | VERZUG_2 |
Short Description | Duration After Latest Scheduled Finish |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DAUER_9_1 | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 10 | |
Decimal Places | 1 | |
Output Length | 13 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Delay |
Medium | 15 | Delay |
Long | 20 | Delay |
Heading | 7 | Delay |
Documentation
Definition
Indicates by how much the planned finish date of an object has been exceeded. At this point an actual finish date does not exist.
Berechnung:
- For milestones:
Today's date minus scheduled date
- For network/order:
Today's date minus basic finish date
- For network activity:
Today's date/time of shift begin minus latest finish date/time of activity.
- For WBS element:
Today's date minus latest finish date/basic finish date
History
Last changed by/on | SAP | 20010820 |
SAP Release Created in | 470 |