SAP ABAP Data Element VERZUG_2 (Duration After Latest Scheduled Finish)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PS-IS (Application Component) Information System
     CNIS (Package) Application development R/3 PS information system
Basic Data
Data Element VERZUG_2
Short Description Duration After Latest Scheduled Finish  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DAUER_9_1    
Data Type QUAN   Quantity field, points to a unit field with format UNIT 
Length 10    
Decimal Places 1    
Output Length 13    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Delay 
Medium 15 Delay 
Long 20 Delay 
Heading Delay 
Documentation

Definition

Indicates by how much the planned finish date of an object has been exceeded. At this point an actual finish date does not exist.

Berechnung:

  • For milestones:

    Today's date minus scheduled date

  • For network/order:

    Today's date minus basic finish date

  • For network activity:

    Today's date/time of shift begin minus latest finish date/time of activity.

  • For WBS element:

    Today's date minus latest finish date/basic finish date

History
Last changed by/on SAP  20010820 
SAP Release Created in 470