SAP ABAP Table STRUCR (Object Structure for Project Reporting)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PS-IS (Application Component) Information System
⤷
CNIS (Package) Application development R/3 PS information system

⤷

⤷

Basic Data
Table Category | INTTAB | Structure |
Structure | STRUCR |
![]() |
Short Description | Object Structure for Project Reporting |
Delivery and Maintenance
Pool/cluster | ||
Delivery Class | ||
Data Browser/Table View Maintenance | Display/Maintenance Allowed with Restrictions |
Components
![]() |
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
---|---|---|---|---|---|---|---|---|---|
1 | ![]() |
0 | 0 | Object Structure for Project Reporting | |||||
2 | ![]() |
ADMI_RUN_D | ADMI_RUN | CHAR | 6 | 0 | Archiving Session Number | ||
3 | ![]() |
VSGRUPPE | TEXT20 | CHAR | 20 | 0 | Group for a project version | ||
4 | ![]() |
VSNMR | VSNMR | CHAR | 12 | 0 | Number or description of a version | ||
5 | ![]() |
PS_IS_ID | CHAR40 | CHAR | 40 | 0 | ID/Object key | ||
6 | ![]() |
KURZTEXT | TEXT40 | CHAR | 40 | 0 | Short text/description of the object | ||
7 | ![]() |
OTEXT | TEXT25 | CHAR | 25 | 0 | Object Type Text | ||
8 | ![]() |
0 | 0 | Object Structure for Project Reporting | |||||
9 | ![]() |
PS_ECKST | DATUM | DATS | 8 | 0 | Basic start date | ||
10 | ![]() |
PS_ECKEN | DATUM | DATS | 8 | 0 | Finish date (from basic dates) | ||
11 | ![]() |
PS_PROGST | DATUM | DATS | 8 | 0 | Forecast start date | ||
12 | ![]() |
PS_PROGEN | DATUM | DATS | 8 | 0 | Forecast finish date | ||
13 | ![]() |
PS_TESTFR | DATUM | DATS | 8 | 0 | Earliest scheduled start (from basic dates) | ||
14 | ![]() |
PS_TEENFR | DATUM | DATS | 8 | 0 | Earliest scheduled finish (from basic dates) | ||
15 | ![]() |
PS_TESTSP | DATUM | DATS | 8 | 0 | Latest scheduled start (from basic dates) | ||
16 | ![]() |
PS_TEENSP | DATUM | DATS | 8 | 0 | Latest scheduled finish (from basic dates) | ||
17 | ![]() |
PS_TPSTFR | DATUM | DATS | 8 | 0 | Earliest scheduled start (from forecast dates) | ||
18 | ![]() |
PS_TPENFR | DATUM | DATS | 8 | 0 | Earliest scheduled finish (from forecast dates) | ||
19 | ![]() |
PS_TPSTSP | DATUM | DATS | 8 | 0 | Latest scheduled start (from forecast dates) | ||
20 | ![]() |
PS_TPENSP | DATUM | DATS | 8 | 0 | Latest scheduled finish (from forecast dates) | ||
21 | ![]() |
PS_VORLST | DATUM | DATS | 8 | 0 | Tentative start date | ||
22 | ![]() |
PS_VORLEN | DATUM | DATS | 8 | 0 | Tentative finish date | ||
23 | ![]() |
PS_ISTST | DATUM | DATS | 8 | 0 | Actual start date | ||
24 | ![]() |
PS_ISTEN | DATUM | DATS | 8 | 0 | Actual finish date | ||
25 | ![]() |
PS_DATFS | DATUM | DATS | 8 | 0 | Earliest start date | ||
26 | ![]() |
PS_DATSE | DATUM | DATS | 8 | 0 | Latest finish date | ||
27 | ![]() |
0 | 0 | Object Structure for Project Reporting | |||||
28 | ![]() |
PS_EDAUER_2 | DAUER_9_1 | QUAN | 10 | 1 | Duration | ||
29 | ![]() |
PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | * | |
30 | ![]() |
PS_PDAUER_VZ | PS_DAUER_VZ | QUAN | 10 | 1 | Forecast duration | ||
31 | ![]() |
PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | * | |
32 | ![]() |
PS_VDAUER_VZ | PS_DAUER_VZ | QUAN | 10 | 1 | Tentative duration | ||
33 | ![]() |
PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | * | |
34 | ![]() |
PS_IDAUER_VZ | PS_DAUER_VZ | QUAN | 10 | 1 | Actual duration | ||
35 | ![]() |
PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | * | |
36 | ![]() |
PS_RDAUER_VZ | PS_DAUER_VZ | QUAN | 10 | 1 | Remaining duration | ||
37 | ![]() |
PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | * | |
38 | ![]() |
PS_ABARBD | CO_ABARB | NUMC | 3 | 0 | Processing % of duration | ||
39 | ![]() |
0 | 0 | Object Structure for Project Reporting | |||||
40 | ![]() |
PS_EARBEI_2 | PS_ARBEIT_2 | QUAN | 13 | 3 | Work | ||
41 | ![]() |
PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | * | |
42 | ![]() |
PS_PARBEI_VZ | PS_ARBEIT_VZ | QUAN | 13 | 3 | Forecast work | ||
43 | ![]() |
PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | * | |
44 | ![]() |
PS_VARBEI_VZ | PS_ARBEIT_VZ | QUAN | 13 | 3 | Tentative work | ||
45 | ![]() |
PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | * | |
46 | ![]() |
PS_IARBEI_VZ | PS_ARBEIT_VZ | QUAN | 13 | 3 | Actual work | ||
47 | ![]() |
PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | * | |
48 | ![]() |
PS_RARBEI_VZ | PS_ARBEIT_VZ | QUAN | 13 | 3 | Remaining work | ||
49 | ![]() |
PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | * | |
50 | ![]() |
0 | 0 | Object Structure for Project Reporting | |||||
51 | ![]() |
PS_ABARBA | CO_ABARB | NUMC | 3 | 0 | Percent of completion for work | ||
52 | ![]() |
SLWID | SLWID | CHAR | 7 | 0 | Key word ID for user-defined fields | * | |
53 | ![]() |
USRCHAR20 | USRCHAR20 | CHAR | 20 | 0 | User field with 20 characters | ||
54 | ![]() |
USRCHAR20 | USRCHAR20 | CHAR | 20 | 0 | User field with 20 characters | ||
55 | ![]() |
USRCHAR10 | USRCHAR10 | CHAR | 10 | 0 | User field with 10 characters | ||
56 | ![]() |
USRCHAR10 | USRCHAR10 | CHAR | 10 | 0 | User field with 10 characters | ||
57 | ![]() |
0 | 0 | Object Structure for Project Reporting | |||||
58 | ![]() |
USRQUAN13 | USRQUAN13 | QUAN | 13 | 3 | User field for quantity (length 10.3) | ||
59 | ![]() |
USRUNIT | MEINS | UNIT | 3 | 0 | User field: Unit for quantity fields | * | |
60 | ![]() |
USRQUAN13 | USRQUAN13 | QUAN | 13 | 3 | User field for quantity (length 10.3) | ||
61 | ![]() |
USRUNIT | MEINS | UNIT | 3 | 0 | User field: Unit for quantity fields | * | |
62 | ![]() |
USRCURR13 | USRCURR13 | CURR | 13 | 3 | User-defined field for values (length 10,3) | ||
63 | ![]() |
USRCUKY | WAERS | CUKY | 5 | 0 | User field: Unit for value fields | * | |
64 | ![]() |
USRCURR13 | USRCURR13 | CURR | 13 | 3 | User-defined field for values (length 10,3) | ||
65 | ![]() |
USRCUKY | WAERS | CUKY | 5 | 0 | User field: Unit for value fields | * | |
66 | ![]() |
USRDATE | USRDATE | DATS | 8 | 0 | User field for date | ||
67 | ![]() |
USRDATE | USRDATE | DATS | 8 | 0 | User field for date | ||
68 | ![]() |
0 | 0 | Object Structure for Project Reporting | |||||
69 | ![]() |
USRFLAG | FLAG | CHAR | 1 | 0 | User-defined field: Indicator for reports | ||
70 | ![]() |
USRFLAG | FLAG | CHAR | 1 | 0 | User-defined field: Indicator for reports | ||
71 | ![]() |
PS_VERNR_C | CHAR8 | CHAR | 8 | 0 | Number of responsible person (project mgr)/MRP controller | ||
72 | ![]() |
PS_VERNA | PS_VERNA | CHAR | 25 | 0 | Name of responsible person (Project manager) | ||
73 | ![]() |
AENNR | AENNR | CHAR | 12 | 0 | Change Number | * | |
74 | ![]() |
WERKS_D | WERKS | CHAR | 4 | 0 | Plant | * | |
75 | ![]() |
ARBPL | ARBPL | CHAR | 8 | 0 | Work center | ||
76 | ![]() |
WFCID | WFCID | CHAR | 2 | 0 | Factory Calendar | * | |
77 | ![]() |
LTXSP | SPRAS | LANG | 1 | 0 | Language: The long text was stored in this language | * | |
78 | ![]() |
NW_PRIO | NW_PRIO | CHAR | 1 | 0 | Priority | * | |
79 | ![]() |
STATUSTEXT_2 | CHAR80 | CHAR | 80 | 0 | Edited status text | ||
80 | ![]() |
FRUEHER_2 | DAUER_9_1 | QUAN | 10 | 1 | Actual start is before earliest scheduled start | ||
81 | ![]() |
SPAETER_2 | DAUER_9_1 | QUAN | 10 | 1 | Actual Finish/Planned Finish After Latest Scheduled Finish | ||
82 | ![]() |
VERZUG_2 | DAUER_9_1 | QUAN | 10 | 1 | Duration After Latest Scheduled Finish | ||
83 | ![]() |
VORBEI_2 | DAUER_9_1 | QUAN | 10 | 1 | Duration After Earliest Scheduled Start | ||
84 | ![]() |
VERZ_EINHT | MEINS | UNIT | 3 | 0 | Unit for Duration of the Delay | * | |
85 | ![]() |
PUFFR_GESM | PUFFER | DEC | 3 | 0 | Total float | ||
86 | ![]() |
PUFFR_FREI | PUFFER | DEC | 3 | 0 | Free float | ||
87 | ![]() |
PPUFF_GESM | PUFFER | DEC | 3 | 0 | Total float (from forecast) | ||
88 | ![]() |
PPUFF_FREI | PUFFER | DEC | 3 | 0 | Free float (from forecast) | ||
89 | ![]() |
KOKRS | CACCD | CHAR | 4 | 0 | Controlling Area | * | |
90 | ![]() |
BUKRS | BUKRS | CHAR | 4 | 0 | Company Code | * | |
91 | ![]() |
GSBER | GSBER | CHAR | 4 | 0 | Business Area | * | |
92 | ![]() |
WAERS | WAERS | CUKY | 5 | 0 | Currency Key | * | |
93 | ![]() |
OWAERS | WAERS | CUKY | 5 | 0 | Object currency for network activity | * | |
94 | ![]() |
MEINH | MEINS | UNIT | 3 | 0 | Unit of Measure for Display | * | |
95 | ![]() |
0 | 0 | Key Figures for Commercial Reporting in Structure Overview | |||||
96 | ![]() |
0 | 0 | RPSCO_LIS for graphics | |||||
97 | ![]() |
PROKSTPLAN | WERTV8 | CURR | 15 | 2 | Current project cost plan | ||
98 | ![]() |
PROKSTPLN2 | WERTV8 | CURR | 15 | 2 | Project cost plan (version 2) | ||
99 | ![]() |
AUFKSTPLAN | WERTV8 | CURR | 15 | 2 | Current order cost plan | ||
100 | ![]() |
AUFKSTPLN2 | WERTV8 | CURR | 15 | 2 | Order cost plan (version 2) | ||
101 | ![]() |
PROERLPLAN | WERTV8 | CURR | 15 | 2 | Current project revenue plan | ||
102 | ![]() |
PROERLPLN2 | WERTV8 | CURR | 15 | 2 | Project revenue plan (version 2) | ||
103 | ![]() |
AUFERLPLAN | WERTV8 | CURR | 15 | 2 | Current order revenue plan | ||
104 | ![]() |
AUFERLPLN2 | WERTV8 | CURR | 15 | 2 | Order revenue plan (version 2) | ||
105 | ![]() |
KREDFINPLN | WERTV8 | CURR | 15 | 2 | Current financial budget, credit side | ||
106 | ![]() |
DEBFINPLN | WERTV8 | CURR | 15 | 2 | Current cash budget, debit side | ||
107 | ![]() |
BUDGET | WERTV8 | CURR | 15 | 2 | Budget of a Measure (App. Request Variant Was Replaced) | ||
108 | ![]() |
FREIGABE | WERTV8 | CURR | 15 | 2 | Release | ||
109 | ![]() |
AUFTRANF | WERTV8 | CURR | 15 | 2 | Residual order plan | ||
110 | ![]() |
FESTPROBL | WERTV8 | CURR | 15 | 2 | Fixed price commitment | ||
111 | ![]() |
KSTOBLGES | WERTV8 | CURR | 15 | 2 | Total cost commitment | ||
112 | ![]() |
ISTKOSTEN | WERTV8 | CURR | 15 | 2 | Actual costs | ||
113 | ![]() |
ISTERLOESE | WERTV8 | CURR | 15 | 2 | Actual revenues | ||
114 | ![]() |
KZHLNG | WERTV8 | CURR | 15 | 2 | Total credit side payments (down payments and payments) | ||
115 | ![]() |
DZHLNG | WERTV8 | CURR | 15 | 2 | Total debit side payments (down payments and payments) | ||
116 | ![]() |
0 | 0 | Append Structure RCJ_RPSCO_LIS | |||||
117 | ![]() |
0 | 0 | RPSCO_LIS for Graphic (Object Currency) | |||||
118 | ![]() |
PROKSTPLANOC | WERTV8 | CURR | 15 | 2 | Current Project Cost Plan in Object Currency | ||
119 | ![]() |
PROKSTPLN2OC | WERTV8 | CURR | 15 | 2 | Project Cost Plan (Version 2) in Object Currency | ||
120 | ![]() |
AUFKSTPLANOC | WERTV8 | CURR | 15 | 2 | Current Order Cost Plan in Object Currency | ||
121 | ![]() |
AUFKSTPLN2OC | WERTV8 | CURR | 15 | 2 | Order Cost Plan (Version 2) in Object Currency | ||
122 | ![]() |
PROERLPLANOC | WERTV8 | CURR | 15 | 2 | Current Project Revenue Plan in Object Currency | ||
123 | ![]() |
PROERLPLN2OC | WERTV8 | CURR | 15 | 2 | Project Revenue Plan (Version 2) in Object Currency | ||
124 | ![]() |
AUFERLPLANOC | WERTV8 | CURR | 15 | 2 | Current Order Revenue Plan in Object Currency | ||
125 | ![]() |
AUFERLPLN2OC | WERTV8 | CURR | 15 | 2 | Order Revenue Plan (Version 2) in Object Currency | ||
126 | ![]() |
KREDFINPLNOC | WERTV8 | CURR | 15 | 2 | Current Credit Side Cash Budget in Object Currency | ||
127 | ![]() |
DEBFINPLNOC | WERTV8 | CURR | 15 | 2 | Current Debit Side Cash Budget in Object Currency | ||
128 | ![]() |
BUDGETOC | WERTV8 | CURR | 15 | 2 | Appropriation Budget (Appr.Request Variant Replaced) in OC | ||
129 | ![]() |
FREIGABEOC | WERTV8 | CURR | 15 | 2 | Release in Object Currency | ||
130 | ![]() |
AUFTRANFOC | WERTV8 | CURR | 15 | 2 | Residual Order Plan in Object Currency | ||
131 | ![]() |
FESTPROBLOC | WERTV8 | CURR | 15 | 2 | Fixed Price Commitment in Object Currency | ||
132 | ![]() |
KSTOBLGESOC | WERTV8 | CURR | 15 | 2 | Total Cost Commitment in Object Currency | ||
133 | ![]() |
ISTKOSTENOC | WERTV8 | CURR | 15 | 2 | Act. Costs in Object Currency | ||
134 | ![]() |
ISTERLOESEOC | WERTV8 | CURR | 15 | 2 | Actual Revenues in Object Currency | ||
135 | ![]() |
KZHLNGOC | WERTV8 | CURR | 15 | 2 | Total Vendor Payments (Down Payments and Payments) OC | ||
136 | ![]() |
DZHLNGOC | WERTV8 | CURR | 15 | 2 | Total Customer Payments (Down Payments and Payments) OC | ||
137 | ![]() |
0 | 0 | Progress Calculation: All | |||||
138 | ![]() |
0 | 0 | Progress Analysis: Values | |||||
139 | ![]() |
EVPLANORG1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work scheduled | ||
140 | ![]() |
EVACTORG1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work performed | ||
141 | ![]() |
EVACTCORR1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work performed, adjusted | ||
142 | ![]() |
0 | 0 | Progress Analysis: Quantities | |||||
143 | ![]() |
EVPLANQUANORG1 | CQUA8 | QUAN | 15 | 3 | Budgeted cost of work scheduled, quantity | ||
144 | ![]() |
EV_PLAN_QUAN_ORG1_UNIT | MEINS | UNIT | 3 | 0 | BCWS, Unit of Measure | * | |
145 | ![]() |
EVACTQUANORG1 | CQUA8 | QUAN | 15 | 3 | Budgeted cost of work performed, quantity | ||
146 | ![]() |
EV_ACT_QUAN_ORG1_UNIT | MEINS | UNIT | 3 | 0 | BCWP, Unit of Measure | * | |
147 | ![]() |
EVACTQUANCORR1 | CQUA8 | QUAN | 15 | 3 | Budgeted cost of work performed, adjusted quantity | ||
148 | ![]() |
EV_ACT_QUAN_CORR1_UNIT | MEINS | UNIT | 3 | 0 | BCWP, Adjusted Quantity (Unit) | * | |
149 | ![]() |
0 | 0 | Progress Analysis: Percentage of completion (POC) | |||||
150 | ![]() |
POCPLANORGAGG1 | EV_PROGRES | DEC | 6 | 3 | Aggregate planned percentage of completion | ||
151 | ![]() |
POCPLANORGNAGG1 | EV_PROGRES | DEC | 6 | 3 | Non-aggregated planned percentage of completion | ||
152 | ![]() |
POCACTORGAGG1 | EV_PROGRES | DEC | 6 | 3 | Aggregated actual POC | ||
153 | ![]() |
POCACTORGNAGG1 | EV_PROGRES | DEC | 6 | 3 | Non-aggregated actual percentage of completion | ||
154 | ![]() |
POCACTCORRAGG1 | EV_PROGRES | DEC | 6 | 3 | Adjusted aggregated actual POC | ||
155 | ![]() |
POCACTCORRNAGG1 | EV_PROGRES | DEC | 6 | 3 | Adjusted non-aggregated actual percentage of completion | ||
156 | ![]() |
EWALVARORG | WERTV8 | CURR | 15 | 2 | Cost Variance Based on EV_ACT_ORG1 | ||
157 | ![]() |
EVSCHVARORG | WERTV8 | CURR | 15 | 2 | Schedule Variance Based on EV_ACT_ORG1 | ||
158 | ![]() |
EWALINDXORG | DEC5_2 | DEC | 7 | 2 | Cost Index Based on EV_ACT_ORG1 | ||
159 | ![]() |
EVSCHINDXORG | DEC5_2 | DEC | 7 | 2 | Date Index Based on POC_ACT_ORG_AGG1 | ||
160 | ![]() |
EWALVARCORR | WERTV8 | CURR | 15 | 2 | Cost Variance Based on EV_ACT_CORR1 | ||
161 | ![]() |
EVSCHVARCORR | WERTV8 | CURR | 15 | 2 | Schedule Variance Based on EV_ACT_CORR1 | ||
162 | ![]() |
EWALINDXCORR | DEC5_2 | DEC | 7 | 2 | Cost Index Based on EV_ACT_CORR1 | ||
163 | ![]() |
EVSCHINDXCORR | DEC5_2 | DEC | 7 | 2 | Date Index Based on POC_ACT_CORR_AGG1 | ||
164 | ![]() |
0 | 0 | Append Structure: Progress Determination | |||||
165 | ![]() |
0 | 0 | Progress Determination (Object Currency) | |||||
166 | ![]() |
0 | 0 | Progress Analysis: Progress Values (PV; Object Currency) | |||||
167 | ![]() |
EVPLANORG1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work scheduled | ||
168 | ![]() |
EVACTORG1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work performed | ||
169 | ![]() |
EVACTCORR1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work performed, adjusted | ||
170 | ![]() |
EWALVARORG | WERTV8 | CURR | 15 | 2 | Cost Variance Based on EV_ACT_ORG1 | ||
171 | ![]() |
EVSCHVARORG | WERTV8 | CURR | 15 | 2 | Schedule Variance Based on EV_ACT_ORG1 | ||
172 | ![]() |
EWALVARCORR | WERTV8 | CURR | 15 | 2 | Cost Variance Based on EV_ACT_CORR1 | ||
173 | ![]() |
EVSCHVARCORR | WERTV8 | CURR | 15 | 2 | Schedule Variance Based on EV_ACT_CORR1 | ||
174 | ![]() |
0 | 0 | Object Structure for Project Reporting | |||||
175 | ![]() |
EV_METHOD_PLN | CHAR10 | CHAR | 10 | 0 | Measurement method for PS progress analysis (plan) | ||
176 | ![]() |
EV_METHOD_ACT | CHAR10 | CHAR | 10 | 0 | Measurement method in PS progress analysis (actual) | ||
177 | ![]() |
EV_WEIGHTD | DEC8 | DEC | 8 | 0 | Aggregation weight for POC (PS progress) | ||
178 | ![]() |
0 | 0 |