SAP ABAP Data Element POCACTCORRAGG1 (Adjusted aggregated actual POC)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ PS-IS-REP-ACC (Application Component) Accounting
⤷ KAP0 (Package) RPSCO recording and infrastructure for this
⤷ PS-IS-REP-ACC (Application Component) Accounting
⤷ KAP0 (Package) RPSCO recording and infrastructure for this
Basic Data
Data Element | POCACTCORRAGG1 |
Short Description | Adjusted aggregated actual POC |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | EV_PROGRES | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 6 | |
Decimal Places | 3 | |
Output Length | 7 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | AAA POC |
Medium | 15 | Adj.agg.act.POC |
Long | 20 | Adj.agg. actual POC |
Heading | 20 | Adj.agg. actual POC |
Documentation
Definition
The percentage of completion (POC) display in the information system distinguishes between:
- Aggregated
- Not aggreagated
- Aggregated, corrected
- Not aggregated, corrected
The corrected/not corrected POCs are used to depict various views of the project.
- Corrected POC
The POC calculated in past periods is displayed with corrections arising from changes to the plan. This view is particular interesting to project managers because it takes account of the effects of plan changes on the POC for past periods too.
- Uncorrected POC
The POC from past periods is not corrected to reflect plan changes.
The uncorrected POC is suitable for reports submitted to the ordering party.
Further notes
In the information system you can display plan and actual POCs from one or two earned value versions.
History
Last changed by/on | SAP | 19990421 |
SAP Release Created in |