SAP ABAP Table RCJ_PS_PLAN (Object Structure for Project Reporting)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PS-ST-OPR-PPB (Application Component) Project Planning Board
⤷
CN_PPT_GRAFIK (Package) Project Planning Board

⤷

⤷

Basic Data
Table Category | INTTAB | Structure |
Structure | RCJ_PS_PLAN |
![]() |
Short Description | Object Structure for Project Reporting |
Delivery and Maintenance
Pool/cluster | ||
Delivery Class | ||
Data Browser/Table View Maintenance | Display/Maintenance Allowed with Restrictions |
Components
![]() |
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
---|---|---|---|---|---|---|---|---|---|
1 | ![]() |
OBJEKT_ID | CHAR30 | CHAR | 30 | 0 | ID/Object key | ||
2 | ![]() |
KURZTEXT | TEXT40 | CHAR | 40 | 0 | Short text/description of the object | ||
3 | ![]() |
OTEXT | TEXT25 | CHAR | 25 | 0 | Object Type Text | ||
4 | ![]() |
PS_ECKST | DATUM | DATS | 8 | 0 | Basic start date | ||
5 | ![]() |
PS_ECKEN | DATUM | DATS | 8 | 0 | Finish date (from basic dates) | ||
6 | ![]() |
PS_PROGST | DATUM | DATS | 8 | 0 | Forecast start date | ||
7 | ![]() |
PS_PROGEN | DATUM | DATS | 8 | 0 | Forecast finish date | ||
8 | ![]() |
PS_TESTFR | DATUM | DATS | 8 | 0 | Earliest scheduled start (from basic dates) | ||
9 | ![]() |
PS_TEENFR | DATUM | DATS | 8 | 0 | Earliest scheduled finish (from basic dates) | ||
10 | ![]() |
PS_TESTSP | DATUM | DATS | 8 | 0 | Latest scheduled start (from basic dates) | ||
11 | ![]() |
PS_TEENSP | DATUM | DATS | 8 | 0 | Latest scheduled finish (from basic dates) | ||
12 | ![]() |
PS_TPSTFR | DATUM | DATS | 8 | 0 | Earliest scheduled start (from forecast dates) | ||
13 | ![]() |
PS_TPENFR | DATUM | DATS | 8 | 0 | Earliest scheduled finish (from forecast dates) | ||
14 | ![]() |
PS_TPSTSP | DATUM | DATS | 8 | 0 | Latest scheduled start (from forecast dates) | ||
15 | ![]() |
PS_TPENSP | DATUM | DATS | 8 | 0 | Latest scheduled finish (from forecast dates) | ||
16 | ![]() |
PS_ISTST | DATUM | DATS | 8 | 0 | Actual start date | ||
17 | ![]() |
PS_ISTEN | DATUM | DATS | 8 | 0 | Actual finish date | ||
18 | ![]() |
PS_DATFS | DATUM | DATS | 8 | 0 | Earliest start date | ||
19 | ![]() |
PS_DATSE | DATUM | DATS | 8 | 0 | Latest finish date | ||
20 | ![]() |
PS_EDAUER | DAUER_4_1 | QUAN | 5 | 1 | Duration | ||
21 | ![]() |
PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | T006 | |
22 | ![]() |
PS_PDAUER | DAUER_4_1 | QUAN | 5 | 1 | Forecast duration | ||
23 | ![]() |
PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | T006 | |
24 | ![]() |
PS_VDAUER | DAUER_4_1 | QUAN | 5 | 1 | Tentative duration | ||
25 | ![]() |
PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | T006 | |
26 | ![]() |
PS_IDAUER | DAUER_4_1 | QUAN | 5 | 1 | Actual duration | ||
27 | ![]() |
PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | T006 | |
28 | ![]() |
PS_RDAUER | DAUER_4_1 | QUAN | 5 | 1 | Remaining duration | ||
29 | ![]() |
PS_DAUEH | MEINS | UNIT | 3 | 0 | Actual duration unit | T006 | |
30 | ![]() |
PS_ABARBD | CO_ABARB | NUMC | 3 | 0 | Processing % of duration | ||
31 | ![]() |
PS_EARBEI | PS_ARBEIT | QUAN | 9 | 1 | Work | ||
32 | ![]() |
PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | T006 | |
33 | ![]() |
PS_PARBEI | PS_ARBEIT | QUAN | 9 | 1 | Forecast work | ||
34 | ![]() |
PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | T006 | |
35 | ![]() |
PS_VARBEI | PS_ARBEIT | QUAN | 9 | 1 | Tentative work | ||
36 | ![]() |
PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | T006 | |
37 | ![]() |
PS_IARBEI | PS_ARBEIT | QUAN | 9 | 1 | Actual work | ||
38 | ![]() |
PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | T006 | |
39 | ![]() |
PS_RARBEI | PS_ARBEIT | QUAN | 9 | 1 | Remaining work | ||
40 | ![]() |
PS_ARBEH | MEINS | UNIT | 3 | 0 | Unit for work | T006 | |
41 | ![]() |
PS_ABARBA | CO_ABARB | NUMC | 3 | 0 | Percent of completion for work | ||
42 | ![]() |
USRCHAR20 | USRCHAR20 | CHAR | 20 | 0 | User field with 20 characters | ||
43 | ![]() |
USRCHAR20 | USRCHAR20 | CHAR | 20 | 0 | User field with 20 characters | ||
44 | ![]() |
USRCHAR10 | USRCHAR10 | CHAR | 10 | 0 | User field with 10 characters | ||
45 | ![]() |
USRCHAR10 | USRCHAR10 | CHAR | 10 | 0 | User field with 10 characters | ||
46 | ![]() |
USRQUAN13 | USRQUAN13 | QUAN | 13 | 3 | User field for quantity (length 10.3) | ||
47 | ![]() |
USRUNIT | MEINS | UNIT | 3 | 0 | User field: Unit for quantity fields | T006 | |
48 | ![]() |
USRQUAN13 | USRQUAN13 | QUAN | 13 | 3 | User field for quantity (length 10.3) | ||
49 | ![]() |
USRUNIT | MEINS | UNIT | 3 | 0 | User field: Unit for quantity fields | T006 | |
50 | ![]() |
USRCURR13 | USRCURR13 | CURR | 13 | 3 | User-defined field for values (length 10,3) | ||
51 | ![]() |
USRCUKY | WAERS | CUKY | 5 | 0 | User field: Unit for value fields | TCURC | |
52 | ![]() |
USRCURR13 | USRCURR13 | CURR | 13 | 3 | User-defined field for values (length 10,3) | ||
53 | ![]() |
USRCUKY | WAERS | CUKY | 5 | 0 | User field: Unit for value fields | TCURC | |
54 | ![]() |
USRDATE | USRDATE | DATS | 8 | 0 | User field for date | ||
55 | ![]() |
USRDATE | USRDATE | DATS | 8 | 0 | User field for date | ||
56 | ![]() |
USRFLAG | FLAG | CHAR | 1 | 0 | User-defined field: Indicator for reports | ||
57 | ![]() |
USRFLAG | FLAG | CHAR | 1 | 0 | User-defined field: Indicator for reports | ||
58 | ![]() |
PS_VERNR_C | CHAR8 | CHAR | 8 | 0 | Number of responsible person (project mgr)/MRP controller | ||
59 | ![]() |
PS_VERNA | PS_VERNA | CHAR | 25 | 0 | Name of responsible person (Project manager) | ||
60 | ![]() |
ARBPL | ARBPL | CHAR | 8 | 0 | Work center | ||
61 | ![]() |
NW_PRIO | NW_PRIO | CHAR | 1 | 0 | Priority | TCN07 | |
62 | ![]() |
STATUSTEXT | CHAR40 | CHAR | 40 | 0 | Edited status text | ||
63 | ![]() |
PS_STUFE | INT1 | INT1 | 3 | 0 | Level in project hierarchy | ||
64 | ![]() |
FRUEHER | DAUER_4_1 | QUAN | 5 | 1 | Actual start is before earliest scheduled start | ||
65 | ![]() |
SPAETER | DAUER_4_1 | QUAN | 5 | 1 | Actual Finish/Planned Finish After Latest Scheduled Finish | ||
66 | ![]() |
VERZUG | DAUER_4_1 | QUAN | 5 | 1 | Duration After Latest Scheduled Finish | ||
67 | ![]() |
VORBEI | DAUER_4_1 | QUAN | 5 | 1 | Duration After Latest Scheduled Start | ||
68 | ![]() |
VERZ_EINHT | MEINS | UNIT | 3 | 0 | Unit for Duration of the Delay | T006 | |
69 | ![]() |
WAERS | WAERS | CUKY | 5 | 0 | Currency Key | TCURC | |
70 | ![]() |
OWAERS | WAERS | CUKY | 5 | 0 | Object currency for network activity | * | |
71 | ![]() |
PUFFR_GESM | PUFFER | DEC | 3 | 0 | Total float | ||
72 | ![]() |
PUFFR_FREI | PUFFER | DEC | 3 | 0 | Free float | ||
73 | ![]() |
PPUFF_GESM | PUFFER | DEC | 3 | 0 | Total float (from forecast) | ||
74 | ![]() |
PPUFF_FREI | PUFFER | DEC | 3 | 0 | Free float (from forecast) | ||
75 | ![]() |
PS_PGSBR | GSBER | CHAR | 4 | 0 | Business area for WBS element | * | |
76 | ![]() |
PRCTR | PRCTR | CHAR | 10 | 0 | Profit Center | * | |
77 | ![]() |
SAKTO | SAKNR | CHAR | 10 | 0 | Cost Element | * | |
78 | ![]() |
FABKL | WFCID | CHAR | 2 | 0 | Factory calendar key | * | |
79 | ![]() |
WERKS_D | WERKS | CHAR | 4 | 0 | Plant | * | |
80 | ![]() |
BUKRS | BUKRS | CHAR | 4 | 0 | Company Code | * | |
81 | ![]() |
PS_ASTNR | PS_ASTNR | NUMC | 8 | 0 | Applicant number | * | |
82 | ![]() |
AUFKALSM | KALSM | CHAR | 6 | 0 | Costing Sheet | * | |
83 | ![]() |
AUFZSCHL | CHAR6 | CHAR | 6 | 0 | Overhead key | ||
84 | ![]() |
ABGR_SCHL | ABGR_SCHL | CHAR | 6 | 0 | Results Analysis Key | * | |
85 | ![]() |
PS_ZSCHM | PS_ZSCHM | CHAR | 7 | 0 | Interest Profile for Project/Order Interest Calculation | * | |
86 | ![]() |
PS_PLAKZ | XFELD | CHAR | 1 | 0 | Indicator: Planning element | ||
87 | ![]() |
PS_BELKZ | XFELD | CHAR | 1 | 0 | Indicator: Account assignment element | ||
88 | ![]() |
PS_FAKKZ | XFELD | CHAR | 1 | 0 | Indicator: Billing element | ||
89 | ![]() |
0 | 0 | Key Figures for Commercial Reporting in Structure Overview | |||||
90 | ![]() |
0 | 0 | RPSCO_LIS for graphics | |||||
91 | ![]() |
PROKSTPLAN | WERTV8 | CURR | 15 | 2 | Current project cost plan | ||
92 | ![]() |
PROKSTPLN2 | WERTV8 | CURR | 15 | 2 | Project cost plan (version 2) | ||
93 | ![]() |
AUFKSTPLAN | WERTV8 | CURR | 15 | 2 | Current order cost plan | ||
94 | ![]() |
AUFKSTPLN2 | WERTV8 | CURR | 15 | 2 | Order cost plan (version 2) | ||
95 | ![]() |
PROERLPLAN | WERTV8 | CURR | 15 | 2 | Current project revenue plan | ||
96 | ![]() |
PROERLPLN2 | WERTV8 | CURR | 15 | 2 | Project revenue plan (version 2) | ||
97 | ![]() |
AUFERLPLAN | WERTV8 | CURR | 15 | 2 | Current order revenue plan | ||
98 | ![]() |
AUFERLPLN2 | WERTV8 | CURR | 15 | 2 | Order revenue plan (version 2) | ||
99 | ![]() |
KREDFINPLN | WERTV8 | CURR | 15 | 2 | Current financial budget, credit side | ||
100 | ![]() |
DEBFINPLN | WERTV8 | CURR | 15 | 2 | Current cash budget, debit side | ||
101 | ![]() |
BUDGET | WERTV8 | CURR | 15 | 2 | Budget of a Measure (App. Request Variant Was Replaced) | ||
102 | ![]() |
FREIGABE | WERTV8 | CURR | 15 | 2 | Release | ||
103 | ![]() |
AUFTRANF | WERTV8 | CURR | 15 | 2 | Residual order plan | ||
104 | ![]() |
FESTPROBL | WERTV8 | CURR | 15 | 2 | Fixed price commitment | ||
105 | ![]() |
KSTOBLGES | WERTV8 | CURR | 15 | 2 | Total cost commitment | ||
106 | ![]() |
ISTKOSTEN | WERTV8 | CURR | 15 | 2 | Actual costs | ||
107 | ![]() |
ISTERLOESE | WERTV8 | CURR | 15 | 2 | Actual revenues | ||
108 | ![]() |
KZHLNG | WERTV8 | CURR | 15 | 2 | Total credit side payments (down payments and payments) | ||
109 | ![]() |
DZHLNG | WERTV8 | CURR | 15 | 2 | Total debit side payments (down payments and payments) | ||
110 | ![]() |
0 | 0 | Append Structure RCJ_RPSCO_LIS | |||||
111 | ![]() |
0 | 0 | RPSCO_LIS for Graphic (Object Currency) | |||||
112 | ![]() |
PROKSTPLANOC | WERTV8 | CURR | 15 | 2 | Current Project Cost Plan in Object Currency | ||
113 | ![]() |
PROKSTPLN2OC | WERTV8 | CURR | 15 | 2 | Project Cost Plan (Version 2) in Object Currency | ||
114 | ![]() |
AUFKSTPLANOC | WERTV8 | CURR | 15 | 2 | Current Order Cost Plan in Object Currency | ||
115 | ![]() |
AUFKSTPLN2OC | WERTV8 | CURR | 15 | 2 | Order Cost Plan (Version 2) in Object Currency | ||
116 | ![]() |
PROERLPLANOC | WERTV8 | CURR | 15 | 2 | Current Project Revenue Plan in Object Currency | ||
117 | ![]() |
PROERLPLN2OC | WERTV8 | CURR | 15 | 2 | Project Revenue Plan (Version 2) in Object Currency | ||
118 | ![]() |
AUFERLPLANOC | WERTV8 | CURR | 15 | 2 | Current Order Revenue Plan in Object Currency | ||
119 | ![]() |
AUFERLPLN2OC | WERTV8 | CURR | 15 | 2 | Order Revenue Plan (Version 2) in Object Currency | ||
120 | ![]() |
KREDFINPLNOC | WERTV8 | CURR | 15 | 2 | Current Credit Side Cash Budget in Object Currency | ||
121 | ![]() |
DEBFINPLNOC | WERTV8 | CURR | 15 | 2 | Current Debit Side Cash Budget in Object Currency | ||
122 | ![]() |
BUDGETOC | WERTV8 | CURR | 15 | 2 | Appropriation Budget (Appr.Request Variant Replaced) in OC | ||
123 | ![]() |
FREIGABEOC | WERTV8 | CURR | 15 | 2 | Release in Object Currency | ||
124 | ![]() |
AUFTRANFOC | WERTV8 | CURR | 15 | 2 | Residual Order Plan in Object Currency | ||
125 | ![]() |
FESTPROBLOC | WERTV8 | CURR | 15 | 2 | Fixed Price Commitment in Object Currency | ||
126 | ![]() |
KSTOBLGESOC | WERTV8 | CURR | 15 | 2 | Total Cost Commitment in Object Currency | ||
127 | ![]() |
ISTKOSTENOC | WERTV8 | CURR | 15 | 2 | Act. Costs in Object Currency | ||
128 | ![]() |
ISTERLOESEOC | WERTV8 | CURR | 15 | 2 | Actual Revenues in Object Currency | ||
129 | ![]() |
KZHLNGOC | WERTV8 | CURR | 15 | 2 | Total Vendor Payments (Down Payments and Payments) OC | ||
130 | ![]() |
DZHLNGOC | WERTV8 | CURR | 15 | 2 | Total Customer Payments (Down Payments and Payments) OC | ||
131 | ![]() |
0 | 0 | Progress Calculation: All | |||||
132 | ![]() |
0 | 0 | Progress Analysis: Values | |||||
133 | ![]() |
EVPLANORG1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work scheduled | ||
134 | ![]() |
EVACTORG1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work performed | ||
135 | ![]() |
EVACTCORR1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work performed, adjusted | ||
136 | ![]() |
0 | 0 | Progress Analysis: Quantities | |||||
137 | ![]() |
EVPLANQUANORG1 | CQUA8 | QUAN | 15 | 3 | Budgeted cost of work scheduled, quantity | ||
138 | ![]() |
EV_PLAN_QUAN_ORG1_UNIT | MEINS | UNIT | 3 | 0 | BCWS, Unit of Measure | * | |
139 | ![]() |
EVACTQUANORG1 | CQUA8 | QUAN | 15 | 3 | Budgeted cost of work performed, quantity | ||
140 | ![]() |
EV_ACT_QUAN_ORG1_UNIT | MEINS | UNIT | 3 | 0 | BCWP, Unit of Measure | * | |
141 | ![]() |
EVACTQUANCORR1 | CQUA8 | QUAN | 15 | 3 | Budgeted cost of work performed, adjusted quantity | ||
142 | ![]() |
EV_ACT_QUAN_CORR1_UNIT | MEINS | UNIT | 3 | 0 | BCWP, Adjusted Quantity (Unit) | * | |
143 | ![]() |
0 | 0 | Progress Analysis: Percentage of completion (POC) | |||||
144 | ![]() |
POCPLANORGAGG1 | EV_PROGRES | DEC | 6 | 3 | Aggregate planned percentage of completion | ||
145 | ![]() |
POCPLANORGNAGG1 | EV_PROGRES | DEC | 6 | 3 | Non-aggregated planned percentage of completion | ||
146 | ![]() |
POCACTORGAGG1 | EV_PROGRES | DEC | 6 | 3 | Aggregated actual POC | ||
147 | ![]() |
POCACTORGNAGG1 | EV_PROGRES | DEC | 6 | 3 | Non-aggregated actual percentage of completion | ||
148 | ![]() |
POCACTCORRAGG1 | EV_PROGRES | DEC | 6 | 3 | Adjusted aggregated actual POC | ||
149 | ![]() |
POCACTCORRNAGG1 | EV_PROGRES | DEC | 6 | 3 | Adjusted non-aggregated actual percentage of completion | ||
150 | ![]() |
EWALVARORG | WERTV8 | CURR | 15 | 2 | Cost Variance Based on EV_ACT_ORG1 | ||
151 | ![]() |
EVSCHVARORG | WERTV8 | CURR | 15 | 2 | Schedule Variance Based on EV_ACT_ORG1 | ||
152 | ![]() |
EWALINDXORG | DEC5_2 | DEC | 7 | 2 | Cost Index Based on EV_ACT_ORG1 | ||
153 | ![]() |
EVSCHINDXORG | DEC5_2 | DEC | 7 | 2 | Date Index Based on POC_ACT_ORG_AGG1 | ||
154 | ![]() |
EWALVARCORR | WERTV8 | CURR | 15 | 2 | Cost Variance Based on EV_ACT_CORR1 | ||
155 | ![]() |
EVSCHVARCORR | WERTV8 | CURR | 15 | 2 | Schedule Variance Based on EV_ACT_CORR1 | ||
156 | ![]() |
EWALINDXCORR | DEC5_2 | DEC | 7 | 2 | Cost Index Based on EV_ACT_CORR1 | ||
157 | ![]() |
EVSCHINDXCORR | DEC5_2 | DEC | 7 | 2 | Date Index Based on POC_ACT_CORR_AGG1 | ||
158 | ![]() |
0 | 0 | Append Structure: Progress Determination | |||||
159 | ![]() |
0 | 0 | Progress Determination (Object Currency) | |||||
160 | ![]() |
0 | 0 | Progress Analysis: Progress Values (PV; Object Currency) | |||||
161 | ![]() |
EVPLANORG1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work scheduled | ||
162 | ![]() |
EVACTORG1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work performed | ||
163 | ![]() |
EVACTCORR1 | WERTV8 | CURR | 15 | 2 | Budgeted cost of work performed, adjusted | ||
164 | ![]() |
EWALVARORG | WERTV8 | CURR | 15 | 2 | Cost Variance Based on EV_ACT_ORG1 | ||
165 | ![]() |
EVSCHVARORG | WERTV8 | CURR | 15 | 2 | Schedule Variance Based on EV_ACT_ORG1 | ||
166 | ![]() |
EWALVARCORR | WERTV8 | CURR | 15 | 2 | Cost Variance Based on EV_ACT_CORR1 | ||
167 | ![]() |
EVSCHVARCORR | WERTV8 | CURR | 15 | 2 | Schedule Variance Based on EV_ACT_CORR1 | ||
168 | ![]() |
STEUS | STEUS | CHAR | 4 | 0 | Control key | * | |
169 | ![]() |
CO_DAUBEA | DAUER_6_1 | QUAN | 7 | 1 | Processing time | ||
170 | ![]() |
BEAZE | EINHEIT | UNIT | 3 | 0 | Unit of measure for processing time | ||
171 | ![]() |
PLIFZ | DEC3 | DEC | 3 | 0 | Planned delivery time in days | ||
172 | ![]() |
PS_PRART | PS_PRART | CHAR | 2 | 0 | Project type | * |
Foreign Keys
![]() |
Source Table | Source Column | Foreign Table | Foreign Column | Dependency Factor | Cardinality left | Cardinality right |
---|---|---|---|---|---|---|---|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
1 | RCJ_PS_PLAN | EARBEH | ![]() |
![]() |
REF | C | CN |
2 | RCJ_PS_PLAN | EDAUEH | ![]() |
![]() |
REF | C | CN |
3 | RCJ_PS_PLAN | IARBEH | ![]() |
![]() |
REF | C | CN |
4 | RCJ_PS_PLAN | IDAUEH | ![]() |
![]() |
REF | C | CN |
5 | RCJ_PS_PLAN | PARBEH | ![]() |
![]() |
REF | C | CN |
6 | RCJ_PS_PLAN | PDAUEH | ![]() |
![]() |
REF | C | CN |
7 | RCJ_PS_PLAN | PSPRI | ![]() |
![]() |
REF | C | CN |
8 | RCJ_PS_PLAN | RARBEH | ![]() |
![]() |
REF | C | CN |
9 | RCJ_PS_PLAN | RDAUEH | ![]() |
![]() |
REF | C | CN |
10 | RCJ_PS_PLAN | USE04 | ![]() |
![]() |
|||
11 | RCJ_PS_PLAN | USE05 | ![]() |
![]() |
|||
12 | RCJ_PS_PLAN | USE06 | ![]() |
![]() |
|||
13 | RCJ_PS_PLAN | USE07 | ![]() |
![]() |
|||
14 | RCJ_PS_PLAN | VARBEH | ![]() |
![]() |
REF | C | CN |
15 | RCJ_PS_PLAN | VDAUEH | ![]() |
![]() |
REF | C | CN |
16 | RCJ_PS_PLAN | VEINH | ![]() |
![]() |
REF | C | CN |
17 | RCJ_PS_PLAN | WAERS | ![]() |
![]() |
REF | C | CN |
History
Last changed by/on | SAP | 20130529 |