SAP ABAP Data Element PS_STUFE (Level in project hierarchy)
Hierarchy
BBPCRM (Software Component) BBPCRM
   SRM-EBP (Application Component) Enterprise Buyer
     CN (Package) R/3 Application development: PS Basic data
Basic Data
Data Element PS_STUFE
Short Description Level in project hierarchy  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type INT1    
Data Type INT1   1-byte integer, integer number <= 255 
Length 3    
Decimal Places 0    
Output Length 3    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name LEVEL   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Level 
Medium 15 Level 
Long 20 Level 
Heading Lev 
Documentation

Definition

Number of steps in the project structure.

Supplementary Documentation - PS_STUFE 0001

Use

Number of levels, starting at the top WBS element, over which results analysis is to be performed.

The value you should enter depends on the project structure indicator that you have entered in Customizing for the Project System in the valuation method. Consequently it also depends on whether you are working with valuated project stock or nonvaluated project stock.

See also: Define valuation methods for results analysis

See also: Project structure indicator

Procedure

  • If you have set the project structure indicator "A", "B" or "C", we recommend that you enter "1". In this case you process the project as a whole - you do not determine the work in process or profits at subordinate levels. Results analysis is performed at the billing element level and used the data cumulated from subordinate WBS elements.
  • If you have set the project structure indicator "P", "T" or "U", we recommend that you enter "99" or the exact depth of the project. Results analysis is then performed for all WBS elements that have a results analysis key, including the corresponding planning and billing elements. You determine work in process and profits at all of these levels.

Supplementary Documentation - PS_STUFE 0002

Procedure

Enter the value right-aligned and without leading zeros.

Examples

Enter for examplne the stage 1 as follows :

right: 1    (wrong: 001)