SAP ABAP Data Element PS_STUFE (Level in project hierarchy)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ SRM-EBP (Application Component) Enterprise Buyer
⤷ CN (Package) R/3 Application development: PS Basic data
⤷ SRM-EBP (Application Component) Enterprise Buyer
⤷ CN (Package) R/3 Application development: PS Basic data
Basic Data
Data Element | PS_STUFE |
Short Description | Level in project hierarchy |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | INT1 | |
Data Type | INT1 | 1-byte integer, integer number <= 255 |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | LEVEL | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Level |
Medium | 15 | Level |
Long | 20 | Level |
Heading | 3 | Lev |
Documentation
Definition
Number of steps in the project structure.
Supplementary Documentation - PS_STUFE 0001
Use
Number of levels, starting at the top WBS element, over which results analysis is to be performed.
The value you should enter depends on the project structure indicator that you have entered in Customizing for the Project System in the valuation method. Consequently it also depends on whether you are working with valuated project stock or nonvaluated project stock.
See also: Define valuation methods for results analysis
See also: Project structure indicator
Procedure
- If you have set the project structure indicator "A", "B" or "C", we recommend that you enter "1". In this case you process the project as a whole - you do not determine the work in process or profits at subordinate levels. Results analysis is performed at the billing element level and used the data cumulated from subordinate WBS elements.
- If you have set the project structure indicator "P", "T" or "U", we recommend that you enter "99" or the exact depth of the project. Results analysis is then performed for all WBS elements that have a results analysis key, including the corresponding planning and billing elements. You determine work in process and profits at all of these levels.
Supplementary Documentation - PS_STUFE 0002
Procedure
Enter the value right-aligned and without leading zeros.
Examples
Enter for examplne the stage 1 as follows :
right: 1 (wrong: 001)
History
Last changed by/on | SAP | 20130604 |
SAP Release Created in |